Week 11:- 2D Detailing Challenge 2
AIM:
To create 2D drawing for each clamp units with all child parts and also create child part drawing for the same for the fixture assembly created in challenge 8.
To create 2D drawing for each pin units drawing with all child parts and also create child part drawing for the same for the fixture assembly created in challenge 8.
DETAILING PROCEDURE:
Here we are detailing for each and every part of unit.
The first sheet always shows isometric views of the unit or it will be based on the customer requirement but mostly every part drawing done in a single sheet.
Clamp mylar and Rest mylar are always goes to heat treatment process to hardening the mylars. Because this is the only part touches the panel as well Pin also.
Layout drawing is the most important drawing. because all the procurements and assemblies are working based on the layout drawing.
S001_Z01_ST010_03_00_CLAMP_UNIT





S001_Z01_ST010_05_00_SWIVEL_CLAMP_UNIT














S001_Z01_ST010_06_00_SWIVEL_CLAMP_UNIT








S001_Z01_ST010_07_00_SWIVEL_CLAMP_UNIT











S001_Z01_ST010_09_00_SWIVEL_CLAMP_UNIT


















S001_Z01_ST010_10_00_CLAMP_UNIT





S001_Z01_ST010_11_CLAMP_UNIT












S001_Z01_ST010_12_CLAMP_UNIT












S001_Z01_ST010_01_00_FIX_PIN-UNIT






S001_Z01_ST010_02_00_FIX_PIN-UNIT






CONCLUSION:
2D drawing for each clamp units with all child parts and also create child part drawing for the same for the fixture assembly created in challenge 8 and 2D drawing for each pin units and rest units drawing with all child parts and also create child part drawing for the same for the fixture assembly created in challenge 8 has been done.