Week 10 - Challenge 1- Attachment Feature Creation (Ribs & Screw Boss)
REPORT: The tooling axis is drawn along the y axis ,that is perpendicular to the surface (point and direction) method.
Note: the given A surface is not fully green using the drafting analysis.
the B surface has been created using offset, the missing layer of surface has been created using the multi section command ;the C surface has been created using draft direction .
finally A AND C are joined and trimmed with B surface.
the draft analysis was completed with an angle of 0.45 degrees ,which is drafted properly
.


