Challenge

Week 10:- 2D Detailing Challenge

AIM:

1.Drafting a Key Sheet for the Complete Fixture assembly

2.Drafting a Base Unit and the Fix Pin Unit drawings with all child parts

INTRODUCTION:

The fixture design after the 3D finishing process has to be done with 2D finishing before it is sent for manufacturing. All the dimensions of the fixture units and their child parts have to clearly mentioned in the drawing sheets. The detailing can be changed as per the requirement of the customer and company standards. GD&T must be used in order to reduce the cost of manufacturing.

All the views must be clearly visible and provided with dimensions in the drawing sheets.

Key Sheet for the Complete Fixture assembly :

ISOMETRIC VIEW:

BASE UNIT:

ROUGH LOCATOR:

PUSH PIN:

PIN:

RISER:

SHRIMS:

L BLOCK:

Conclusion:

Hence,the drafting of key sheet for the complete fixture assembly and the base unit and the fix pin unit drawing with all child parts for the complete fixture assembly has been completed.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.