Week 10:- 2D Detailing Challenge
AIM:
To draft a key sheet for the complete fixture assembly created in challenge 8 and to draft a base unit and the fixed pin unit drawings with all child parts for the
complete fixture assembly from challenge 8.
Procedure:
Key sheet for complete fixture:
NOTE:
To drafting a part, there's always been a standard procedure to do it.
Must have three start in a drawing and there are different standards to start up a drawing.
2 hole starts and one machining start and three machining start. based on customer standards.
In this project, a standard tolerance has been used,
Dowel to Dowel = +-0.01mm
Dowel to Dowel (pattern changes) = +-0.02mm
Dowel to clearance hole = +-0.1mm
Machining to Dowel = +-0.02mm
Machining to Machining = +-0.01
Machining Start = +-0.50mm
For Fine Machining = 3.2
For Rough Cut = 6.3
Below i have attached the drawing files and PDF.
Given dimentions to the required line. dont give it for all the lines containing on the drawing. because it will make confusion to others.