Challenge

Week 1 Challenge

1)

AIM: Create a new project.

TOOLS:

PROCEDURE:

> Open REVIT software.

> Click on "file", a new tab will open.

> Now click on "new" and then click on "project".

> Now click on "Architectural Template" and the click on "OK"

RESULT: A new project is created

2)

AIM: SAVING THE FILE

TOOLS:

PROCEDURE:

> To save the file click on the second icon beside the rev it symbol.

> A new tab will open and then name your project and save it.

>> OR click on (Ctrl+S) and then save project

RESULT: The new project is saved

3)

AIM: CREATING A RECTANGULAR LAYOUT OF WALL 40' -0" x 30' -0"

TOOLS:

PROCEDURE:

> Under the Architecture we can find a tool named "WALL", click on it.

> Select architectural wall.

> Now draw the required layout ie. 40' -0" X 30' -0".

RESULT: Wall of required dimensions is drawn.

4)

AIM: ADDING DIMENSIONS TO THE LAYOUT

TOOLS:

PROCEDURE:

> To add dimensions click on "Annotate".

> Now using aligned tool add dimensions.

RESULT: Dimensions are added.

5)

AIM: Properties browser to switch to different wall types

TOOLS:

PROCEDURE:

> Click on any wall and then click on properties.

> now a tab will open and there we can choose the desired wall type.

RESULT:

6)

AIM: Create a 3D view from the view tool bar and save the view with appropriate name.

TOOLS:

PROCEDURE:

> To create 3D view, click on view in toolbar.

> Click on 3D view and you will get a 3D view of your layout.

> Now click on file option and save the file.

RESULT: 3D view is created and saved.

7)

AIM: Navigate through the 3D model using view cube. Orbit/pan through the model layout created

TOOLS:

PROCEDURE:

> In the top right corner of the drawing we can see a cube through which we can view different sides from different angles.

RESULT: Different views can be seen.

8)

  • AIM: Use the visibility settings option below to switch model to shaded, realistic, hidden lines options

TOOLS:

PROCEDURE:

> Now click on visual style.

> A new tab will open from there we can switch model to various types.


RESULT: using visual style different models are switched.

9)

AIM: Turn the sunlight on and off to view shadings in the layout created

TOOLS:

PROCEDURE:

> Now click on sun path tool in bottom left, where we can find two options sun path on and off.

> Now turn on and off sun path.

10)

AIM: Use the Manage tool bar to enter project settings, project name and project issue date.

TOOLS:

PROCEDURE:

> Open manage toolbar.

> click on project information.

> A new tab will open, select project name and project issue date.

RESULT: Project name and issue date is entered.

11)

AIM: What is Analyze tool bar used in Revit? How it is beneficial for design and modelling

> Analyze tool is to create a load calculation or annual simulation report for heating, cooling, and airflow.

> It contains boundary conditions,loads, load cases, load combinations, heating and cooling loads, and etc.

> After analytical spaces are assigned, we can run a system analysis.

12)

What are the links that Revit supports to be linked to the model.

> Link REVIT

> Link IFC

> Link CAD

> Link PDF

> Link Cloud

> Link topography

> Link Image

> Manage links

13)

Why do you need Collaborate tab in Revit? How it supports modelling and its efficiency

> To link multiple revit models we can use collaborate tab.

> As we can collaborate different parts of a project, we can work on every part with high efficiency.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.