Usage of Navigation tool , Timeliner and Clash Detection test using Naviswork
Aim
Usage of Navigation tool , Timeliner and Clash Detection test using Naviswork.
Run the Clash Detection Test using Naviswork.
Using the Timeliner feature in Navisworks prepare a schedule.
I have recorded the walk through in navisworks but the file generated is not accessable and showing the error in playing the video so can't able to upload.
Ans 1
Export the Revit architecture and structure model to Navisworks with the export settings discussed.

Ans 2

Ans 3

Ans 4
a. Run the Clash Detection Test
b. Study the clashes between the two models
Their are some of the clashes that can be ignored such as column to beam and wall.
which i have shown in the brlow images

But their are some clashes that can't be ignored that are;
window which is slightly going inside the wall
basin clashes with the platform of the kitchen
celing touches the wall lightning
are shown below




Result
Some clashes can be resolved but some has to be corrected.
Use Navigate Tool to walk around the model and walk through.
Embed both architecture and structure *.nwc file to your Navisworks file. Create a clash detection test between the two models.