Tool Test 1
I completed the tool test 1.
The first plastic component (Switch panel) in 20 hrs.
And The second component (sheet metal) in 8 hrs.
I completed the tool test 1.
The first plastic component (Switch panel) in 20 hrs.
And The second component (sheet metal) in 8 hrs.