Challenge

Reinforcement Detailing of Beams from ETABS output

ANSWER : 

AIM:

         i) To design the beams in detail from the Etabs 2018.       

         ii) To provide the detailing of longitudinal and shear reinforcement for two continuous beams .

        iii) To calculate the value of maximum shear force in any one of the spans in the continuous beams

        iv) To provide the reasons of failure of middle span along grid A.

Introduction - 

1) Beams are horizontal structural elements used for the supporting lateral loads.

2) In conventional reinforced concrete structures, beams usually receive load from the floor slab, but may also

     be subjected to other loads such as wall loads, finishes, services installation, etc.

3) The design and detailing of RC beams involves the selection of the proper beam size and the quantity of longitudinal

     and shear reinforcement that will satisfy ultimate and serviceability limit state requirements.

4) Afterwards, It is very important that the beam reinforcements are placed and arranged properly on site,

     to avoid construction error.

PROCEDURE: 

STEP 1:

Step 2) 

i) Now check the load combinations which are already created in given modeling file .

Step 3) 

i) Before Run Analysis we have to check the model 

ii) Click on Analyze 

iii) Click on Check Model 

iv) A structure is verified without any error and Model has been checked . 

Step 4) 

i) Now we have to start the beam design by selecting the 'Start Design/Check' option .

ii) Once you click on Start / Design check you will see Display concrete frame Design results box .

iii) Where you can select whatever design output you want 

iv) So Click on Longitudinal Reinforcement .

Step 5) 

i) Once you click on , Longitudinal reinforcement details will appear .

       

 Step 6) :

 1) Reinforcement details along Grid A - 

i) Max Ast">AstVu,a at bottom support = 1026 mm2

 

ii) Max Ast">Ast at bottom middle = 757 mm2

 

iii) Max Ast">Ast at Top support = 1896 mm2

 

iv) Max Ast">Ast at Top middle = 474 mm2

Reinforcement Calculation  -

1) For Top -

i) Total Ast required at top is = 1896 MM^2

So we can provide 

   3 bars of diameter 20 mm and 5 bars of 16 mm satisfies the overall  Ast 

             3 x T20 = 942  mm2

             5 x T16 = 804  mm2

          3 X T20 + 5 x T16  = 1946mm2.......................Hence Satisfy .

2) FOR BOTTOM: - 

i) Total Ast required at top is = 1026 MM^2.

So we can provide 

   2 bars of diameter 20 mm and 2 bars of 16 mm satisfies the overall  Ast 

             2 x T20 = 628  mm2

             2 x T16 = 402 mm2

          2X T20 + 2 x T16  = 1030 mm2........................Hence Satisfy .

3) For Shear details - 

i) Right Click on and Click on Details 

ii) Click on Shear Details 

FIG.

iii) As per Clause 6.3.3 we have to provide Spacing till 2d from the face of the column is 100 . 

iv) It should not be more than that 

v) So provide 3 legged stirrups of 10mm diameter with 100mm spacing throught the beam length . 

REINFORCMENT DETAIL AT GRID 3:

FIG.

Step 8) 

i) Now we have to do Check for Sway shear .

A) For Right Sway 

We know that the formula to calcuate :

From Etabs Model results substitute the value  -

i) VuD+L</math>">VuD+L= 92 Kn 

ii) Mas</math>">Mas= 176 kn-m

`ii) Mbh</math>">Mbh= 295 kn&n`

iv) Lab = 4.725 m

Put this value in above eqn 

we get , 

 

Vu,a</math>">Vu,a= 48 Kn

Vu,b</math>">Vu,b = 230 Kn

B) For Left Sway 

i) Follow the same process 

ii) We know the formula

 From Etabs Model results substitute the value  -

i) VuD+L</math>">VuD+L= 74 Kn 

`i) Mah</math>">Mah= 23`

iii) Mbs</math>">Mbs= 150 kn 

iv) Lab = 4.725 m

Put this value in above eqn 

we get , 

= 190 Km

Vu,b</math>">Vu,b = 50 Km

C) Existing Shear capacity in beam as per Is 456-2002

i) We know the formula -

Put the values -

i) fy = 415 N/mm2

ii) Asv = 151 mm2

iii) Spacing = 100 mm 

iv) d = 450 mm .

put this value in above eqn 

we get 

Vus</math>">VusVus) = 246 kn............................................> 230 kn ( Shear sway)........... ( Hence Safe ) 

Results - 

i) Beam Design is done successfully with detailed reinforcement .

ii) Provide reasons for failure of the middle span along grid A. What are the possible ways this issue can be resolved ?

1) The main reason of failure of middle span along grid A is shear stress is exceeded the limiting value 

2) This may be beacause of the higher Shear force acting on that beam and due to provision of weak shear 

     reinforcement at the end supports .

3) This Issue can be Solved by - 

    i) By providing Higher grade of concrete in that particular section 

    ii) Or by reducing the Shear force in that beam section 

   iii) Or by providing higher shear reinforcement which can resist the shear force in that section 

iii) Calculate value of the maximum shear force in any one of the spans in both the continuous beams,

      as per clause 6.3.3 (b) in IS 13920 – 2016. 

As we have already calculated the value of shear force as per IS 13920 - 2016 Clause 6.3.3 (b) 

We get the Shear sway value Right and Left support within limit 

246 kn > 230 Kn ...................( Safe )

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.