Challenge

Projefct 1_Comparative study of different storey buildings for Seismic forces

AIM:

To do a comparative study o different story buildings for seismic forces

Procedure :

Building A:

  • Two-story building
  • beam : 300mm x 400 mm
  • column : 400mm X 400 mm
  • grade M30, Fe 415,
  • Brick wall load = 10 Kn/m
  • Live load 3 KN/m^2

Analysis

Model participating mass ratio

Mode 2: T =0.46 seconds

Building B:

  • 5 -story building
  • beam : 300mm x 400 mm
  • column : 400mm X 400 mm
  • grade M30, Fe 415,
  • Brick wall load = 10 Kn/m
  • Live load 3 KN/m^2

Analysis:

Model participating mass ratio

Building C :

  • 5 -story building
  • beam : 300mm x 400 mm
  • column : 550mm X 300 mm
  • grade M30, Fe 415,
  • Brick wall load = 10 Kn/m
  • Live load 3 KN/m^2

Analysis

Building D:

  • 5 -story building
  • beam : 300mm x 400 mm
  • column : 300mm X 550 mm
  • grade M30, Fe 415,
  • Brick wall load = 10 Kn/m
  • Live load 3 KN/m^2

Analysis :

Building E:

  • 10 -story building
  • beam : 300mm x 400 mm
  • column : Bottom 5 ( 600mm X 600 mm )
  • : Upper 5 ( 400 mm X 400 mm )
  • grade M30, Fe 415,
  • Brick wall load = 10 Kn/m
  • Live load 3 KN/m^2

Analysis :

building f :

  • 10 -story building
  • beam : 300mm x 400 mm
  • column :600mm x 600 mm
  • grade M30, Fe 415,
  • Brick wall load = 10 Kn/m
  • Live load 3 KN/m^2

Analysis :

Building G :

  • 25 -story building
  • beam : 300mm x 400 mm
  • column : Bottom 10 ( 800mm X 800 mm )
  • : Upper 10 ( 600 mm X 600 mm )
  • : top upper 5 ( 400 mm x 400 mm)
  • grade M30, Fe 415,
  • Brick wall load = 10 Kn/m
  • Live load 3 KN/m^2

Analysis :

Buiding h:

  • 25 -story building
  • beam : 300mm x 400 mm
  • column :800 x 800 mm
  • grade M30, Fe 415,
  • Brick wall load = 10 Kn/m
  • Live load 3 KN/m^2

Analysis :

building I :

  • 25 -story building
  • beam : 300mm x 400 mm
  • column :800 x 800 mm
  • grade M30, Fe 415,
  • Brick wall load = 10 Kn/m
  • Live load 3 KN/m^2 ( 10 percent )

with imposed mass 10 percent larger than h, therefore the imposed mass is 0.35

Analysis :

building j :

  • 25 -story building
  • beam : 300mm x 400 mm
  • column :800 x 800 mm
  • grade M30, Fe 415,
  • Brick wall load = 10 Kn/m
  • Live load 3 KN/m^2 ( 60 percent )

with imposed mass 20 percent larger than h, therefore the imposed mass is 0.45

Analysis :

Result :

Effect of stiffness :

natural periods of e and f

E=(ty = 1.53 , ty = 1.52 )

F = (ty = 1.53 , tx = 1.53 )

*there is only marginal difference in the fundamental natural period

Natural periods of G and H

G = ( ty1 = 3.7 , tx2 = 3.6 )

f = ( ty2= 3.9 , tx1= 3.9 )

*There is only marginal difference in the fundamental natural period

Effect on mass

*H, J and K. Have the buildings become more flexible due to the increase imposed mass

Effect of building height :

* fundamental natural periods of buildings increases with height

Effect of Column Orientation on T:

*there is only marginal difference in the fundamental natural period when compared with c and d .

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.