step 1: Create a file

  • the new file is opened
  • go to the home tab click on template reference add the company template provided.
  • add the company template to the newly opened file and then save the file
  • name it as {SURVRD(PROJ)}now the file is created

step:2 creating description key set

  • go to tool space and click setting
  • Click points and go to description key sets
  • and then select and right-click the civil 3d
  • PANORAMA table will open, and add all the data to it as per the assignment pdf and click ok
  • description key set is now prepared.

step:3 FIGURE PREFIX DATABASE

  • now in the [SURVRDO (PROJ)], go to tool space /survey/
  • Click on the manage figure prefix database, click it another thing opens and click on the sample as shown in the figure
  • right-click the dialog box opens for manage the figure database of the sample
  • Click on the plus sign and import the data

STEP 4: SURVEY THE DATABASE

  • go to the survey database and right-click a dialog box that opens
  • click "new local survey database "another dialog box opens, name it "new database"
  • and click ok
  • now the new database is shown in the survey database
  • next click on the new database, and select import.
  • in the import, many options open such as import survey data, import point file, import points from drawing, import survey land XML
  • among that select the import survey data
  • an import survey data-specific database dialog box opens
  • in that select point file and click ok plus sign and add (day1(PROJ2).txt file and click ok
  • Go to survey database/linework code sets/
  • right click linework code sets, click new and name it as " linework new"
  • and click ok

STEP:5 importing land XML file

  • New file open with company template -XYZ (survey)
  • save it as "DTM02"
  • next, we have to import the land XML file
  • open triangle files from assignment 7
  • go to tool space, click surface and select export XML
  • the exporting will happen, then click ok dialog boxes open again click ok
  • the XML is imported.

step:6 creating alignment

  • Click the new file with the company template ("Company XYZ") and save it as ALGNRD02.dwg
  • next, go to the surface and click land export XML from (GDTMRD02)
  • Next type "xref" to import the (TOPOD01) topography file into the (ALGNRD01) file
  • next ALGNRD01, go to settings in tool space click edit drawing and select coordinate as"FL83-NF"
  • go to the ribbon bar and click alignment /create alignment by layout.
  • create alignment dialog box opens and creates the alignment [road150]

step 7: creating superelevation

  • next, create superelevation
  • Click on the alignment and select edit superelevation
  • calculate superelevation -roadway type dialog opens
  • in roadway type select undivided crowned, click next
  • next in lanes normal lanes as width '11' and for lane slope '-2%' and click next
  • in shoulder control, assign normal shoulder width as 6.00 and normal shoulder width - 6.00% click next and f=click finish
  • now superelevation is calaculted.

step:8 creating the "MOLDLRD" file

  • Click the new file with the company template ("Company XYZ") and save it as MOLDLRD.dwG
  • next import land XML of the GDTMRD02 file and click ok
  • next, import the ALGNRD02 file and click ok
  • now the MOLDLRD file is created with all imports

step 9: Create a profile view

  • in the toolbar, click a profile
  • right profiles and select create profile view
  • create a profile from the surface dialog box opens
  • select the surface and add it to the profile list
  • set all the data one by one and click create profile view

step:10 creating assemblies and subassemblies

  • Go to the alignment file that was created
  • next, draw a rectangle by typing the "rec" command
  • next type the "MTEXT" dialog box opens, draw a rectangle above the previously created rectangle
  • then type "ASSEMBLE" and hit ok
  • the selected things are created assemblies (shown in the figure)
  • Go to the home tab and click assembly and then click create assembly
  • Next assembly dialog boxes open, the name is typed and assembly styles are selected and click ok
  • Next, go to tool plates and select lane superelevationAOR, give the name of the subassembly
  • Click the subassembly/commands/create subassembly and click it, the dialogue box opens as shown below ,check the requirements and click ok
  • next, go to condition select conditional horizontal target and click
  • after selecting go to properties and the select target is not found as an option in the properties ,name it "RT_STD".
  • created things are shown below
  • mirror copied the thing that created

step 11: creating a corridor

  • next is creating corridor, go to the home tab, select corridor, and click create a corridor
  • check the requirements
  • change the along vertical curves for the better view
  • and click ok the corridor is created

step:12 creating intersection

  • we have to create a new alignment for that
  • first, we have to create a new alignment, click alignment select the alignment and draw it
  • next click on connect the alignment and select first alignment and second alignment and click ok

step: 13 creating a plan sheet and view frames

  • open a new file with the company and template and create the data shortcuts for the file
  • open the plan sheet in the civil 3d which is provided

step:14 creating estimation

dating all the excel sheets according to the given data

step :14 creating pipe networks

step: 15 creating box culvert

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.