Challenge

Project 1

Physiological monitoring system

Physiological monitoring systems assess aspects of human performance and either respond with a corrective action, or alert a human being to do so. Physiologic monitors can measure and record temperature, heart rate, respiration, alertness, and activity.

A multiparameter monitor is a medical device for monitoring a patient’s vital signs. It is mainly used in intensive care, hospitalization or ER. In general, basic models are used to monitor cardiac activity (ECG), blood pressure (NIBP), respiration, oxygen saturation (SpO2) and temperature.

They display the value of each parameter while presenting the evolution curves over time. For some models, modules can be added to measure other parameters (CO2, pCO2, IBP, EEG, EMG, etc.). They have audible and visual alarms to alert medical personnel to any risks related to the patient’s condition.

The selected physiological signals were blood volume pulse (BVP), electrocardiogram (ECG), and skin conductance level (SCL). These signals reflect the activity level of the autonomic nervous system, which is connected with the secretory activity of cardiac muscles and internal organs.

Specifications

The specifications are

  • Span: It is difference between the maximum and minimum values of the input.
  • Error: It is the difference between the result of the measurement and the true value of the quantity being measured. A sensor might give a displacement reading of 29.8 mm, when the actual displacement had been 30 mm, then the error is – 0.2 mm.
  • Accuracy: It defines the closeness of the agreement between the actual measurement result and a true value of the measurand. It is often expressed as a percentage of the full range output or full–scale deflection. A piezoelectric transducer used to evaluate dynamic pressure phenomena associated with explosions, pulsations, or dynamic pressure conditions in motors, rocket engines, compressors, and other pressurized devices is capable to detect pressures between 0.1 and 10,000 psig (0.7 KPa to 70 MPa). If it is specified with the accuracy of about±1% full scale, then the reading given can be expected to be within ± 0.7 MPa.
  • Sensitivity of a sensor:It is defined as the ratio of change in output value of a sensor to the per unit change in input value that causes the output change.For example, a general purpose thermocouple may have a sensitivity of 41 µV/°C.
  • Nonlinearity: It indicates the maximum deviation of the actual measured curve of a sensor from the ideal curve. A figure attached below (Name of the picture: Non linearity error) shows a somewhat exaggerated relationship between the ideal, or least squares fit, line and the actual measured or calibration line. Linearity is often specified in terms of percentage of nonlinearity, which is defined as:

    Nonlinearity (%) = Maximum deviation in input ⁄ Maximum full scale input

    It is dependent upon environmental factors, including temperature, vibration, acoustic noise level, and humidity. Therefore it is important to know under what conditions the specification is valid.
  • Hysteresis: It is an error of a sensor, which is defined as the maximum difference in output at any measurement value within the sensor’s specified range when approaching the point first with increasing and then with decreasing the input parameter. The hysteresis error value is normally specified as a positive or negative percentage of the specified input range.
  • Resolution: It is the smallest detectable incremental change of input parameter that can be detected in the output signal. Resolution can be expressed either as a proportion of the full-scale reading or in absolute terms.
  • Stability: It is the ability of a sensor device to give same output when used to measure a constant input over a period of time. The term ‘drift’ is used to indicate the change in output that occurs over a period of time. It is expressed as the percentage of full range output.
  • Dead band: Dead band or dead space of a transducer is the range of input values for which there is no output. The dead time of a sensor device is the time duration from the application of an input until the output begins to respond or change.
  • Repeatability: It specifies the ability of a sensor to give same output for repeated applications of same input value. It is usually expressed as a percentage of the full range output:

Repeatability = (maximum – minimum values given) X 100/full range

  • Response time: It describes the speed of change in the output on a step-wise change of the measurand. It is always specified with an indication of input step and the output range for which the response time is defined.

Source of specifications: https://learnmech.com/what-are-the-sensor-and-transducers-specifications/

Technical Specification of Patient Monitor 5 Parameter (Source: https://us.nepalembassy.gov.np/technical-specification-of-patient-monitor-5-parameter/)

The specifications which a purchaser asks when he/she looks for a multi parameter physiological monitoring system are

  • Purchaser’s Specifications
  1. Name of Bidder
  2. Manufacturer
  3. Brand
  4. Type/Model
  5. Country of origin
  • Description of Function: It should be suitable for usage in Emergency, Operation Room and ICU Capable of monitoring ECG, SPO2, Non Invasive Blood Pressure (NIBP), Respiration Rate and Temperature.
  • Operational Requirements: It shall operate on AC power supply as well as built-in battery
  • Technical Specifications:
  1. Monitor must be able to monitor ECG, Respiration, SpO2, NIBP and Temperature as a standard parameter.
  2. At least 12” high resolution TFT display with LED backlight with touch screen.
  3. Display waveform: simultaneously display of at least 10 waveforms along with related numerical parameters on single screen.
  4. Monitor must have Lithium ion Battery. More than 3 hour battery Backup.
  5. Should have Adult, Pediatric and neonatal measurement mode.
  6. Shall have Protection system against defibrillator discharge.
  7. Shall have atleast 72-hour ECG waveform data storage and recall with more than 2000 hour data trends, graphics and tabular view.
  8. 2000 groups event, ARR and SpO2 storage.
  9. The monitor should be able to configure automatically for new parameters as they are connected.
  10. Should have alarm indicators with different alarm tones and visible alarm lights indicators for different issues.
  11. The key volume, alarm volume and beat volume should be adjustable according to clinical practices and/or preferences.
  12. Shall have Integrated 3 channel thermal Printer to record the events.
  13. Connection and interface: Should have network capability to connect central monitoring system.
  14. Clinicians should be able to “freeze” applications at the bedside and have access to real-time ECG monitoring and other information at the same time.

Specifications of non invasive blood pressure

Technique: Oscillometric

Measurement mode: Manual , Automatic and STAT

Measuring time: <30 seconds (typical adult cuff)

Measuring range: Systolic pressure: 40mmHg~275mmHg, Diastolic pressure: 10mmHg~210mmHg, Mean arterial pressure: 20mmHg~230mmHg

Specifications of SpO2

Transducer: Dual-wave length LED

SpO2 measuring range: 0%~100%

SpO2 measuring accuracy: 2% for range from 70% to 100%

Pulse Rate measuring range: 0 to 250 bpm. Accuracy +/-2%

Specifications of ECG

Heart Rate measuring range: 15bpm~350bpm

Heart Rate measuring accuracy: ±1% or ±2bpm

Specifications of Temperature range

Measuring range : 21.0°C~50.0°C

Measuring accuracy: ±0.2°C for range from 25.0°C~45.0°C

Specifications of Respiration Rate

Respiration Rate measuring range: 0rpm~120rpm

Respiration Rate measuring accuracy: ±5% or ±2rpm

Accessories, spares and consumables

  • NIBP (Non invasive blood pressure) reusable cuffs with hose of 3 various sizes (neonate, pediatric and adult) – 1 each
  • Spo2 Probe with extension set, various size ( Neonate, Pediatric and Adult) – 1 each
  • ECG: 3/5 lead ECG cable and wire- 1 set
  • Temperature: Skin temperature probe- 1 set

Operating Environment

The product should be designed to store and operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.

Power supply: 220 – 240 VAC, 50Hz fitted with appropriate plug.

Standards and Safety Requirements

  • Must submit ISO13485:2003/AC:2007 for Medical Devices
  • Must Submit CE (93/42 EEC) Directive certificate and USFDA approved product certificate.
  • Should meet IEC 61010-2-081 safety requirements for electrical equipment.

User Training: Training must be provided to the user (including how to use and maintain the equipment).

Warranty

  • Comprehensive warranty for 2 years.
  • Maintenance Service During Warranty Period
  • During the warranty period supplier must ensure corrective/breakdown maintenance whenever required. (written document)

Documentation

  • User (Operating) manual in English.
  • Service (Technical / Maintenance) manual in English.
  • Certificate of calibration and inspection from factory.

Qualification procedure for the medical device (Source: https://elosmedtech.com/iq-oq-pq-what-do-they-mean-and-why-are-they-important-in-medical-device-manufacturing/)

This is the ideal way to identify the quality of medical devices. In each phase of the validation process, documents are compiled with detailed results of each qualification test. After performing IQ, OQ, and PQ successfully with the desired result and established documents that verify each phase, a manufacturing process can get underway. The defined discipline for a validation process has proven to be the ideal way to guarantee the best quality of medical devices consistently over time. (Picture attached by name: IQ OQ PQ flow chart)

There are four qualification stages which helps to determine if the process being tested is capable of operating in its specific environment. They include:

  • Design Qualification (DQ): It provides documented verification that the design of new equipment will result in a system that is suitable for the intended purpose.

It provides documented QA approved evidence:

1. Procured system or equipment meets User Requirements Specification

2. equipment adequately controls risk as identified during the system risk assessment

3. Critical aspects/Critical Design Elements necessary to implement requirements and risk controls are present

4. Design Review and Design Qualification are not intended to be separate activities. The Design Review feeds the Design Qualification via the requirements traceability matrix. Design Qualification is focused on Critical aspects and Critical Design Elements and involves the Quality unit as an approver.

  • Installation Qualification (IQ): It mainly asks the question "Is everything installed correctly?" It validates that the equipment is correctly installed. It is the first step in the validation process. In this phase, we verify that the manufacturing equipment meets the design specifications and has been correctly installed and configured according to requirements. We need to confirm that all necessary documents, drawings, and manuals are correctly executed and available. During IQ, equipment maintenance as well as calibration schedules and procedures should be established.
  • Operational Qualification (OQ): It mainly asks the question "Is everything operating correctly? Are operating limits understood?" It validates that equipment operates as intended. It is the second step in the validation process. In this phase, we verify that the manufacturing equipment operates according to requirements. We need to carry out tests for each component to confirm that every part of the manufacturing equipment operates as intended at pre-set thresholds. By challenging the manufacturing process using “worst-case” conditions, it is possible to determine the process window and to ensure a reproducible manufacturing process resulting in conforming products.
  • Performance Qualification (OQ): It mainly asks the question "Did it produce the correct result? Is the process stable and capable?" It validates process stability over time. It is the third and last step of the validation process. In this phase, we verify process stability over time by running the equipment several times with a load under normal operating conditions to challenge its functionality and safety. This will demonstrate if the process will produce a product that conforms to its requirements.

Medical devices are intended to be used for humans and need to meet regulatory requirements. IQ, OQ, and PQ are important steps in a validation process to prove that the medical devices meet all predetermined requirements for functionality and safety, as well as the regulatory standards. Non-conforming products could lead to human injury and result in costly product recalls. A well-planned and performed validation process is crucial for manufacturers to ensure that they have a controlled manufacturing process that consistently produces conforming products that ensure the quality and safety of the medical device.

Safety Requirements

  • Patient safety considerations should be taken. Faulty medical equipments may lead to electric shock (micro and macro shocks). Steps needed to be taken to avoid electric shocks. Safety needs to be ensured for patient, doctor, nurses and operator.
  • The operator needs to be experienced so that he/she can handle the equipment properly. Fail;ure to operate the equipment may lead to loss of life.
  • Standards needs to be established and followed accordingly.
  • The device should be reliable, simple and capable of withstanding all environments.
  • The device should withstand additional factors like transportation, vibration, etc. and environmental factors like weather, rain, etc.

Standards of Biomedical devices

International Standard applies to the basic safety and essential performance of medical electrical equipment and medical electrical systems, hereafter referred to as me equipment and me systems.
This collateral standard specifies requirements for alarm systems and alarm signals in me equipment and me systems.
It also provides guidance for the application of alarm systems.
International standard IEC 60601-1-8 has been prepared by IEC subcommittee 62A: Common aspects of electrical equipment used in medical practice of IEC technical committee 62: Electrical equipment in medical practice, and ISO subcommittee SC 3: Lung ventilators and related devices of ISO technical committee 121 : Anaesthetic and respiratory equipment.
IEC 60601-1-8 constitutes a collateral standard to IEC 60601-1: Medical electrical equipment - Part 1: General requirements for safety and essential performance hereafter referred to as the general standard.
The object of this collateral standard is to specify basic safety and essential performance requirements and tests for alarm systems in me equipment and me systems and to provide guidance for their application. This is accomplished by defining alarm categories (priorities) by degree of urgency, consistent alarm signal and consistent control states and their marking for all alarm systems.
This collateral standard does not specify:
  • whether any particular me equipment or me system is required to be provided with alarm systems;
  • the particular circumstances which initiate an alarm condition;
  • the allocation of priorities to a particular alarm condition; or
  • the means of generating alarm signals.

IEC 60601-1

For me equipment and me systems, this collateral standard complements IEC 60601-1.
When referring to IEC 60601-1 or to this collateral standard, either individually or in combination, the following conventions are used:
  • "the general standard" designates IEC 60601-1 alone;
  • "this collateral standard" designates IEC 60601-1-8 alone;
  • "this standard" designates the combination of the general standard and this collateral standard.

Other IEC Standards

  • IEC 60417, Graphical symbols for use on equipment
  • IEC 60601-1:2005, Medical electrical equipment — Part 1: General requirements for basic safety and essential performance
  • IEC 60601-1-6:, Medical electrical equipment — Part 1-6: General requirements for basic safety and essential performance — Collateral standard: Usability
  • IEC 60651:1979, Sound level meters
    Amendment 1 (1993)
    Amendment 2 (2000)
  • ISO 3744:1994 Acoustics — Determination of sound power levels of noise sources using sound pressure — Engineering method in an essentially free field over a reflecting plane
  • ISO 7000: 1989 Graphical symbols for use on equipment — Index and synopsis

Alarms (Source: https://www.iso.org/obp/ui#iso:std:iec:60601:-1-8:ed-2:v1:en)

The terms given in IEC 60601-1:2005, IEC 60601-1-2, IEC 60601-1-6

NOTE 1: The term "electrical equipment" is used to mean me equipment or other electrical equipment. This standard also uses the term "equipment" to mean me equipment or other electrical or non-electrical equipment in the context of an me system.

NOTE 2: An index of defined terms.

Alarm condition: State of the alarm system when it has determined that a potential or actual hazard exists
Note 1 to entry: An alarm condition can be invalid, i.e. a false postive alarm condition.
Note 2 to entry: An alarm condition can be missed, i.e. a false negative alarm condition.
Alarm condition delay: Time from the occurrence of a triggering event either in the patient, for physiological alarm conditions, or in the equipment, for technical alarm conditions, to when the alarm system determines that an alarm condition exists
Alarm limit: Threshold used by an alarm system to determine an alarm condition
Alarm off: State of indefinite duration in which an alarm system or part of an alarm system does not generate alarm signals
Alarm paused: State of limited duration in which the alarm system or part of the alarm system does not generate alarm signals
Alarm preset: Set of stored configuration parameters, including selection of algorithms and initial values for use by algorithms, which affect or modify the performance of the alarm system
Alarm reset: Operator action that causes the cessation of an alarm signal for which no associated alarm condition currently exists
Alarm settings: Alarm system configuration, including but not limited to:
  • alarm limits;
  • the characteristics of any alarm signal inactivation states; and
  • the values of variables or parameters that determine the function of the alarm system
Note 1 to entry: Some algorithmically-determined alarm settings can require time to be determined or re-determined.
Alarm signal: Type of signal generated by the alarm system to indicate the presence (or occurrence) of an alarm condition
Alarm signal generation delay: Time from the onset of an alarm condition to the generation of its alarm signal(s)
Alarm system: Parts of me equipment or a me system that detect alarm conditions and, as appropriate, generate alarm signals
Audio off: State of indefinite duration in which the alarm system or part of the alarm system does not generate an auditory alarm signal
Audio paused: State of limited duration in which the alarm system or part of the alarm system does not generate an auditory alarm signal
Burst: Group of pulses with a distinctive rhythm or pattern
De-escalation: Process by which an alarm system decreases the priority of an alarm condition or decreases the sense of urgency of an alarm signal
Default alarm preset: Alarm preset that can be activated by the alarm systemwithout operator action
Note 1 to entry: Manufacturer- or responsible organization-configured alarm presets are possible types of default alarm presets.
Distributed alarm system: Alarm system that involves more than one item of equipment of a me system
Note 1 to entry: The parts of a distributed alarm system can be widely separated in distance.
Escalation: Process by which an alarm system increases the priority of an alarm condition or increases the sense of urgency of an alarm signal
Fall time(tf): Interval over which the pulse amplitude decreases from 90 % to 10 % of its maximum
False negative alarm condition: Absence of an alarm condition when a valid triggering event has occurred in the patient, the equipment or the alarm system
Note 1 to entry: An alarm condition can be rejected or missed because of spurious information produced by the patient, the patient-equipment interface, other equipment or the equipment itself.
False positive alarm condition: Presence of an alarm condition when no valid triggering event has occurred in the patient, the equipment or the alarm system.
Note 1 to entry: A false positive alarm condition can be caused by spurious information produced by the patient, the patient-equipment interface, other equipment or the alarm system itself.
High priority: Indicating that immediate operator response is required
Note 1 to entry: The priority is assigned through risk analysis.
Information signal: Any signal that is not an alarm signal or a reminder signal. Eg. ECG waveform, SpO2 tone,
Fluoroscopy beam-on indication
Intelligent alarm system: Alarm system that makes logical decisions based on monitored information without operator intervention
Eg. An alarm system that changes priority based on the rate of change of a monitored variable, An alarm system that suppresses an alarm condition when a related alarm condition of higher priority has recently generated an alarm signal.
Interburst interval(tb): Period of time between the end of the last pulse of a burst and the start of the first pulse of the next burst of the same alarm signal
Latching alarm signal: Alarm signal that continues to be generated after its triggering event no longer exists until stopped by deliberate operator action
Low priority: Indicating that operator awareness is required
Note 1 to entry: The priority is assigned through risk analysis.
Medium priority: Indicating that prompt operator response is required
Note 1 to entry: The priority is assigned through risk analysis.
Non-latching alarm signal: Alarm signal that automatically stops being generated when its associated triggering event no longer exists
Operator's position: Intended position of the operator with respect to the alarm signal generating part of the alarm system
Note 1 to entry: A distributed alarm system can have multiple operator's positions.
Physiological alarm condition: Alarm condition arising from a monitored patient-related variable
Eg. High exhaled anesthetic agent concentration, Low exhaled tidal volume, Low oxygen saturation measured by pulse oximetry, High arterial pressure, High heart rate, etc.
Pulse: Brief continuous sound having a specific spectral content
Pulse frequency (fo): Fundamental frequency (first harmonic) of a pulse
Reminder signal: Periodic signal that reminds the operator that the alarm system is in an alarm signal-inactivation state
Rise time (tr): Interval over which the pulse increases from 10% to 90% of its maximum amplitude.
Technical alarm condition: Alarm condition arising from a monitored equipment-related or alarm system-related variable
Eg. An electrical, mechanical or other failure, a failure of a sensor or component (unsafe voltage, high impedance, signal impedance, artifact, noisy signal, disconnection, calibration error, tubing obstruction, etc.), an algorithm that cannot classify or resolve the available data.
ICU Planning and Designing in India (Source:ICU Planning and Designing in India – Guidelines 2010)
ICU is highly specified and sophisticated area of a hospital which is specifically designed, staffed, located, furnished and equipped, dedicated to management of critically sick patient, injuries or complications. It is a department with dedicated medical, nursing and allied staff. It operates with defined policies; protocols and procedures should have its own quality control, education, training and research programmes. It is emerging as a separate specialty and can no longer be regarded purely as part of anaesthesia, Medicine, surgery or any other speciality. It has to have its own separate team in terms of doctors, nursing personnel and other staff who are tuned to the requirement of the speciality.
There are pre-existing guidelines on the website of ISCCM, made in 2003. There has been a sea change since then and therefore need for new guidelines. The existing guidelines have been taken as base line for the present recommendations.
Initial Planning

Team Formation and Leader/Coordinator
Data Collection and analysis
Beginning of the Process and decide about Budget allocation, aims and objectives

Decision About ICU Level, Number of beds, Design and Future Thoughts

Planning level of ICU like I, Level II or Level III or Tertiary Unit
Number of beds and number of ICUs as needed for the institution
Designing each bed lay out and providing optimum space for the same
Modulation according to various types of space availability
Free hanging power columns Vs head end panel facilities
Central Nursing Station designing and planning
Location, space, Facilities
Equipmentation
Will depend on number of beds, target level of the ICU
Most important decisions will be No of Ventilated beds and Invasive monitoring
ICU Vs HDU
Collecting information about various equipments available with specifications

Support System Recommendations
Storage
Communication
Computerisation
Meeting needs of Nursing and Doctors
Meeting needs of relatives and Attendants
Relationship and Coordination with other areas like ER and other super
speciality ICUs
Environmental Planning
Effective steps and planning to control nosocomial infections
Flooring, walls, pillars and ceilings
Lighting
Surroundings
Noise
Heating/ AC/Ventilation
Waste disposal and pollution control
Protocol about allowing visitors, shoes etc inside ICU
Human Resource development

Doctors , Nurses , Respiratory Therapist , Computer Programmer , and support staff like Clerks ,X-ray technician, Lab technicians , Cleaning staff who are trained to the needs of ICUs . This is a very Critical area and turn over is very high because of big gap between demand and supply and can put a lot of stress on the team and patient outcome.
Other areas like
Research
Data Collection
Documentation
Record keeping
Team Formation

Team may consist of following -
1. Intensivist
2. Administrator
3. Finance officer
4. Architect and Engineers
5. Nurse
6. Any other person if is relevant
Who should Co-ordinate/lead the team ?

Coordinator is the most important person who coordinates with every one involved.

Intensivist/In-charge is best suited to be the Co-ordinator because –

  • He has technical skill and knowledge to plan and guide
  • He will prevent mistakes to bare minimum
  • He can suggest changes during the development phase itself if finds problems
  • However, in some countries or some set ups particularly public sector hospitals administrators are usually the coordinators of such project implementation process since they can coordinate with all the major individuals and groups whose inputs/help are needed in achieving the target in time and quality, It may be difficult for Intensivist to spare so much of time needed and coordinate with others.
Aims and Objectives, Budget allocation and other target settings
It is important to decide about priorities based on inputs from Team members and should
answer following questions –
  • Budget available
  • Level of ICU needed
  • Location
  • Number of Beds needed
  • Designs
  • Human Resource Development
  • Engineering and designing constraints
  • What type of Case mix the ICU team is likely to deal with and therefore help in
    prioritise equipment type
  • In Case of existing facility being upgraded or relocated, then the review of past
    mistakes
  • Patient safety and prevention of infection programme
  • Transition in case of relocation during reconstruction of the existing ICU

Designing ICU/Level/No of ICUs/No of Beds and Individual Bed

Following ICU Levels are proposed

Level I

  • It is recommended for small district hospital, small private Nursing homes, Rural centres
  • Ideally 6 to 8 Beds
  • Provides resuscitation and short-term Cardio respiratory support including Defibrillation.
  • ABG Desirable.
  • It should be able to Ventilate a patient for at least 24 to 48 hrs and Non invasive
  • Monitoring like - SPO2, H R and rhythm (ECG), NIBP, Temperature etc
  • Able to have arrangements for safe transport of the patients to secondary or tertiary centres
  • The staff should be encouraged to do short training courses like FCCS or BASIC ICU Course.
  • In charge should be preferably a trained doctor in ICU technology and knowledge Blood Bank support
  • Should have basic clinical Lab (CBC, BS, Electrolyte, LFT and RFT) and Imaging back up (X-ray and USG), ECG
  • Some Microbiology may be desirable
  • At least one book on Critical Care Medicine as ready reckoner

Level II (Recommendations of Level I Plus)

  • Recommended for larger General Hospitals
  • Bed strength 6 to 12
  • Director be a trained/qualified Intensivist
  • Multisystem life support
  • Invasive and Non invasive Ventilation
  • Invasive Monitoring
  • Long term ventilation ability
  • TC Pacing
  • Access to ABG, Electrolytes and other routine diagnostic support 24 hrs
  • Strong Microbiology support with facility for Fungal Identification desirable
  • Nurses and duty doctors trained in Critical Care
  • CT must & MRI is desirable
  • Protocols and policies for ICUs are observed
  • Research will be highly recommended
  • Should be supported ideally by Cardiology and other super specialities of Medicine
    and Surgery
  • HDU facility will be desirable
  • Should fulfil all requirements for IDCC Course
  • Resident doctors must be exposed to FCCS course/BASIC course/Ventilation workshops and other updates
  • Blood banking either own or outsourced

Level III (All recommendations of Level II Plus)

  • Recommended for tertiary level hospitals
  • Bed strength 10 to 16 with one or multiple ICUS as per requirement of the institution
  • Headed by Intensivist
  • Preferably Closed ICU
  • Protocols and policies are observed
  • Have all recent methods of monitoring, invasive and non invasive including continuous cardiac output, SCvO2 monitoring etc.
  • Long term acute care of highest standards
  • Intra and inter-hospital transport facilities available
  • Multisystem care and referral available round 24 hrs
  • Should become lead centres for IDCC and Fellowship courses
  • Bedside x-ray, USG, 2D-Echo available
  • Own or outsourced CT Scan and MRI facilities should be there
  • Bedside Broncoscopy
  • Bedside dialysis and other forms of RRT available
  • Adequately supported by Blood banks and Blood component therapy
  • Optimum patient/Nurse ratio is maintained with 1/1 pt/Nurse ratio in ventilated patients.
  • Protocols observed about prevention of infection
  • Provision for research and participation in National and International research programmes
  • Patient area should not be less than 100 sq ft per patient (>125 sq ft will be ideal). In addition there is optimum additional space for storage, nursing station and relatives
  • The unit is assisted by an Ethical Committee which formulates policies about DNAR, Organ donation, EOLS etc
  • Doctors, Nurses and other support staff be continuously updated in newer technologies and knowledge in critical Care

Human Resource for ICU


Human resource development is one of the most important task and component of the whole programme. Dedicated, highly motivated, ready to work in stress situations for long periods of time are the type of personal needed. They includes Intensivist, Resident doctors, Nurses, Respiratory Therapists, Nutritionist, Physiotherapist, Technicians, Computer programmer, Biomedical Engineer, and Clinical Pharmacist, Other support staff. Like cleaning staff, guards.

Team Leader


It is important to have a good team led by an Intensivist (who spends >50% of his time in ICU). He should be a full timer particularly for tertiary centres. He should be qualified and trained and able to lead the team. Experience is absolutely essential to lead the ICU team .

Resident Doctors

  • Post graduates from Anaesthesia, Medicine or Respiratory Medicine or other allied branches even surgical specialties. Other residents may be graduates depending upon total Bed strength of ICU.
  • Though need of resident doctors per number of patient has not been prescribed in literature, however, it is understood and recommended that one doctor cannot take care of more than five patients who are critically sick on ventilator and/or undergoing invasive monitoring with MOFS.
  • Therefore, it is suggested that one PG resident with one graduate resident may be good for an ICU of 10 to 14 beds with 1/3 of the pts may be falling into above category. Total no of residents should include who will relieve those going on leave or have to take sudden offs.

Nursing staff

  • Nursing – 1/1 nursing for Ventilated or MOFS patients is desirable but in no circumstance the ratio should be < 2 /3 (Two nurses for 3 such patients).
  • This will affect the outcome immensely.
  • 1/2 to 1/3 nurse patient ratio is acceptable for less seriously sick patients who do not
    require above modalities.

Other staff

  • Respiratory Therapist looks after the patients being ventilated respiratory physiotherapy, this takes away lot of load off the duty doctor and the nurses.
  • Physiotherapist help in mobilisation, and Technicians who can perform simple procedures like taking samples and sending them to proper place in proper manner makes the task easy and less stressful.
  • Computer person can prepare reports, enter data and bring out print outs as and when needed. He can also maintain library, Internet and protocols practiced in ICU.
  • Biomedical engineer within the campus makes the job of ICU less frustrating when snags creep in within sensitive ICU equipment. He can be correct them fast.
  • Nutritionist is also a very important professional who can contribute to outcome of patient. They have to be trained in desired practices and should be more inclined towards enteral feeding than TPN.
  • Cleaning, class IV and Guards are also important to ICU particularly when they understand needs of ICU and its patients. They have a huge role to play in prevention of Nosocomial infection, keeping ICU clean and protect from overcrowding.

How many ICUS and Beds are needed

  • Brain storming sessions should be held as to decide how many ICU beds are needed and how many ICUs should be made which may include Advanced ICU, HDU, PICU and Speciality related ICU like Neurointensive care, Cardiac Intensive Care and Trauma.
  • The number of Intensive Care beds will depend on the data available from the hospital and current/future requirements of the hospital.
  • Some ICUs particularly in Private set ups in our country may be main speciality in the hospital and they should be very careful in deciding about the number of beds and budgetary provisions and viability issues are very important in such cases.
  • Numbers of ICU Beds recommended in a hospital are usually 1 to 4 per 100 hospital beds
  • ICUs having <6 beds are not cost effective and also they may not provide enough clinical experience and exposure to skilled HR of the ICU. At the same ICU with bed strength of >24 are difficult to manage and major problems may be encountered in management and outcome.
  • Recommendations suggest that efficiency may be compromised once total number of beds crosses 12 in ICU.
  • The Canadian Department of National Health and Welfare has developed a formula for calculating the number of ICU beds required based on the average census in the existing unit and the desired probability of having an ICU bed immediately available for a new admission.
  • Therefore, it is recommended that total bed strength in ICU should be between 8 to 12 and not <6 or not >14 in any case.

Location/entry/exit points of ICU in Hospital

  • Safe, easy, fast transport of a critically sick patient should be priority in planning its location, therefore, ICU should be located in close proximity of ER, Operating rooms, trauma ward.
  • Corridors, lifts & ramps should be spacious enough to provide easy movement of bed/trolley of a critically sick patient.
  • Close/easy proximity is also desirable to diagnostic facilities, blood bank, pharmacy, etc.
  • No thoroughfare can be provided through ICU.
  • There should be single entry/exit point to ICU, which should be manned.
  • However, it is required to have emergency exit points in case of emergencies and disasters.

ICU Bed Designing and Space Issues

  • Space per bed has been recommended from 125 to 150 sq ft area per bed in the patient care area or the room of the patient. Some recommendation has placed it even higher up to 250 sq ft per bed. In addition there should be 100 to 150% extra space to accommodate nursing station, storage, patient movement area, equipment area, doctors and nurses rooms and toilet.
  • However in Indian circumstances after reviewing and feed back from various ICUs in our country it may be satisfactory to suggest an area of 100 to 125 sq ft be provided in patient care area for comfortable working with a critically sick patient where all the paraphernalia including monitoring systems, Ventilators & other machines like bedside X-ray will have to be placed around the patient. Bedside procedures like Central lines, Intubation, Tracheostomy, ICD insertion and RRT are common.
  • It may be prudent to make one or two bigger rooms or area which may be utilised for patients who may undergo big bedside procedures like ECMO, RRT etc and has large number Gadgets attached to them.
    10 % (one to two) rooms may be designated isolation rooms where immunocompromised patients may be kept, these rooms may have 20% extra space than other rooms.
  • The planners may think about, if they are thinking of introducing newer technologies in their ICU like ECMO, Nitric Oxide and Xenon clearance etc. Do they need Lamellar flow for specific patient population in their ICUs. This will be highly specific for High end up ICUs and is not recommended in routine Provisions may be kept open for such options in future.

10% of beds ( 1 or 2 ) rooms may be used exclusively as isolation cases like for burns, serious contagious infected patients. Each group should decide if they want to provide the patient access to music (audio), telephone etc. However an alarm bell which has both indicators by sound and light must be provided to each patient and he be taught about it, how to use it when needed.

Recommendations for Indian ICUs

  • Bed space- minimum 100 sq ft (Desirable) >125.
  • Additional space for the ICU (Storage/Nursing stn/doctors/circulation etc) 100 % extra of the bed space (Keep the future requirement in mind)
  • Oxygen outlets 2
  • Vacuum outlets 2
  • Compressed air outlets 1
  • Electric outlets 12 of which 4 may be near the floor 2 on each side of the patient.
  • Electric outlets/Inlets should be common5/15 amp pins. Should have pins to accommodate all standard International Electric Pins/Sockets. Adapters should be discouraged since they tend to become loose.

Central Nursing Station

  • This is the nerve centre of ICU, despite lots of development, the old standard of a central station is still holds good and endorsed by most guidelines and regulations regardless of today's practice needs.
  • All/near-all monitors and patients must be observable from there, either directly or through the central monitoring system. Most ICUs use the central station, serving six to twelve beds arranged in an L or U fashion.
  • Patients in rooms may be difficult to observe and therefore may be placed on remote television monitoring, These monitors may satisfy regulatory requirements but do not really provide adequate patient safety if the clarity of the picture is poor.
  • Some ICUs have unit pods of about four or five beds, each served by a separate workstation, Nurses assigned to patients in the pod form a team, A monitor technician is required, The unit Nursing clerk and the supervising nurse will usually work together to oversee the efficient interaction among the staff and with support services.
  • Careful consideration of what level or type of activity will occur in the central station will insure adequate space planning, New equipment purchased over the next decade will probably increase the amount of desk and shelf space required.
  • At times of high use the number of people in the central station can increase several fold. Having enough space and chairs to meet needs during such times should be provided for.
  • The space should accommodate computer terminals and printers. A large number of communication cables may be required per bedside to connect computers and faxes to other departments, as well as to other institutions and offices.
  • Adequate space for charting on the platform is absolutely important.
  • Patients must be easily visible from the charting area whether the nurse is sitting or standing, taller chairs are often necessary.
  • In case of space constraint, Collapsible desktops or shelves that can flip up off the wall can be planned.
  • Space allotted for storage of the previous charts of patients currently in the unit should also be provided.
  • It is also important that a storage space is provided for equipment, linen, instruments, drugs, medicines, disposables, stationary and other articles to be stored at the Nursing tation must be provided. All these cupboards should be labelled.
  • The latest generation of monitoring systems allows access to patient data from any bedside; This means that the doctor who is busy caring for one patient can monitor others without leaving that bedside.
  • Consoles can be programmed to automatically display critical events from one bedside at several sites without personnel calling for it. There is need for more effective alarming system with less noise, which can send signals to CNS as well as remote pager carried by the caregiver.
  • Ideally in Indian ICUs, there are over bed tables with each bed. These tables may be so deigned of stainless steel to have a broad top to accommodate charts and cupboards enough in number and size to store medicines, disposables investigations and records of the patient.
  • The Central Nursing Station has in charge nursing, duty doctors/s, clerk/computer guy, machines, store attached and monitors and spare machines/spares, linen and other ancillaries.

List Of Equipments (8 Bedded ICU)

S. No. Name of Equipment Number Specification
1. Bedside Monitors
(For ICU)
One per Bed Modular -2 Invasive BP, SPO2,NIBP, ECG, RR, Temperature Probes with trays
2. Ventilators 6 With paediatric and adult provisions, graphics and NonInvasive Modes (Two Ventilators should be with inbuilt
Compressor. each should have a Fisher and Paykel
Humidifier
3. Infusion Pumps 2 Per bed in ICU Volumetric with all Recent upgraded drug calculations
4. Defibrillator Two with TCP
facility (one
standby )
Adult and paediatric pads with Trascutaneous pacing
facility
5. ICU Beds (Shock Proof) (Fibre) One for each bed Electronically Manoeuvred with all positions possible with mattress. Now beds are available which give lateral
positions also
6. Crash/ Resuscitation trolley Two for ICU To hold all resuscitation equipment and Medicines
7. Computers 2 (for ICU) With laning, Internet facility and printer to be connected
with all departments
8. HD Machines 2 User friendly so that even a Nurse can Operate
9. CO, SVR, ScvO2
Monitor
1 As Described
10. Intermittent Leg Compressing Machine 2 To prevent DVT
11. Airbeds 6 To Prevent Bed sores
12. Intubating Video scope 1 To make difficult Intubations easy
13. Glucometer 2 for ICU
14. ICU Dedicated Ultrasound and Echo
machine
1 With recent advances to look instantly even at odd hours.
Vascular filling, central lines, etc
15. ETO sterilization 1 To sterilize ICU disposables regularly
16. Ambu Mask different sizes 10 sets including
two for Pediatric
use
Silicon, ETO sterilisable

Patient monitor central monitoring system (Pictures attached by name: Display mode, Review patients data list, ECG review mode, Alarm event review mode of waveform and tabular trend with High Med Low levels, Review full, specific patient data)

  • Wired : up to 64 monitors / Wireless : up to 16 monitors
  • Support dual monitors: up to 32 monitor displays in 1 monitor
  • 2,4, 8, 16, 32 channels with Pageview mode
  • Server functions in different location
  • Dual monitoring mode
  • Broker server function ( Nurse station & Doctor’s station )
  • Up to 10 days of file storage per patient for Admin/Discharged patient information
  • Alarm events, waveforms: graphic & tabular trend, ECG review
  • Alarm ON/OFF
  • NIBP Start / Stop triggering menu with STAT ON/OFF
  • Patient Admin/ Discharge
  • Remote setting from CMS to patient monitor

Displays for Result

To choose the right TFT LCD display for a medical application, engineers and decision-makers need to have a comprehensive understanding of how TFT LCD display specifications affect final products.

In the old days, medical device with a display was usually bulky and had many dials & buttons. A machine with buttons and knots makes for a good breeding space for harmful pathogens, as it is harder to clean than modern one with flat touch screen interface. Using TFT LCD touch screen on medical device not only makes disinfecting easy, but also save a lot of front panel spaces for displaying vital medical information.

Medical device can be put through extreme temperature, vibration and shock, moisture and variable ambient lighting. Thus, it demands highly reliable TFT LCD screen, and possibly the use of clear protective cover that safeguards the display from the rigors of day-to-day use.

While normal LCD display's performance is not sufficient, medical TFT suppliers like Topway can add enhancements such as optical bonded front panel with anti-reflection coating, transflective display that combines both reflective and transmissive properties.

Medical TFT LCDs are typically used in three kinds of applications: standard (e.g. bedside monitor), life-support (e.g. glucose meter) and life-critical (e.g. ventilator). These applications have drastically different requirements on functionality, reliability and MTBF (mean time between failure). Two well-known standard organizations' acceptance test rules are generally accepted by the industry, European DIN and American Association of Physicists in Medicine. The two organizations have well defined standard on resolution, noise, viewing angle, glare, color uniformity, distortion, reflection, luminance response and luminance uniformity.

Qualification process for these standards is very tedious and expensive. Device manufacturers are not willing to modify an approved system and are demanding long-term availability for LCD display. Topway guarantees the TFT LCD module's longevity. A lot of the color LCD models' life span even last over ten years.

Medical Devices using TFT LCD

  • Ventilators
  • Humidifiers
  • Infusion Pump
  • ECG monitor

Examples of alarming medical devices

Attached/on the patient In patient room
Ventilator Nurse call
Blood warmer Electrosurgical unit
Sequential compression device Medical gas alarm
Intra-aortic balloon pump Line isolation monitor
Defibrillator Chair/bed occupancy alarm
Pulse oximeter (Sp02) Bathroom emergency call button
Infant warmer Code blue call
Apnea monitor Bi-pap unit
Bedside physiological monitor Infusion pump(s)
Non-invasive blood pressure monitor Tourniquet
Feeding pump Hypo/Hyperthermia unit
Infant abduction alarm Injector

Source: Seibig 2010 and alarm data

Medical Device Data Systems (MDDS)

These are hardware or software products intended to transfer, store, convert formats, and display medical device data. A MDDS does not modify the data or modify the display of the data, and it does not by itself control the functions or parameters of any other medical device. MDDS may or may not be intended for active patient monitoring.

Per section 520(o)(1)(D) of the Federal Food, Drug, and Cosmetic Act:

  • Software functions that are solely intended to transfer, store, convert formats, and display medical device data or medical imaging data, are not devices and are not subject to FDA regulatory requirements applicable to devices. The FDA describes these software functions as "Non-Device-MDDS."
  • Hardware functions that are solely intended to transfer, store, convert formats, and display medical device data or results are "Device-MDDS."

Examples of Non-Device-MDDS include software functions that:

  • Store patient data, such as blood pressure readings, for review at a later time;
  • Convert digital data generated by a pulse oximeter into a format that can be printed; and
  • Display a previously stored electrocardiogram for a particular patient.

The DICOM standard, which is the dominant protocol for medical imaging communications, provides a new concept for communication service design. It accepts E-mail service and adopts web-enabled services through the standardization of WADO service. DICOM is a message standard (i.e., a specification for interchange of information between computer systems). DICOM is a comprehensive specification of information content, structure, encoding, and communications protocols for electronic interchange of diagnostic and therapeutic images and image-related information.

Medical image sharing is the electronic exchange of medical images between hospitals, physicians and patients. Rather than using traditional media, such as a CD or DVD, pendrive or hard drives and either shipping it out or having patients carry it with them, technology now allows for the sharing of these images using the cloud. DICOM uses TCP (transmission control protocol) as its underlying network transport layer, and despite its widespread and generally successful use around the world for most Internet use, TCP does have some significant limitations. CEN ISO/IEEE 11073 enables the communication between medical devices and external information systems. This standard provides plug-and-play interoperability between devices, and facilitates the efficient exchange of data acquired at the point of care in all care environments.

Medical image processing encompasses the use and exploration of 3D image datasets of the human body, obtained most commonly from a Computed Tomography (CT) or Magnetic Resonance Imaging (MRI) scanner to diagnose pathologies or guide medical interventions such as surgical planning, or for research purposes.

DICOM® is implemented in almost every radiology, cardiology imaging, and radiotherapy device (X-ray, CT, MRI, ultrasound, etc.), and increasingly in devices in other medical domains such as ophthalmology and dentistry. HIS is the core informational system for patient management across the health-care system and radiology information system (RIS) is considered the core system for the electronic management of imaging departments. RIS is used by radiologists to edit and report the radiology diagnosis. PACS provide storage and convenient access to medical images such as ultrasounds, MRIs, CTs, and x-rays. DICOM is both a protocol for transmitting images and a file format for storing them.

DICOM is most commonly used for storing and transmitting medical images enabling the integration of medical imaging devices such as scanners, servers, workstations, printers, network hardware, and picture archiving and communication systems (PACS) from multiple manufacturers.

Medical Image Data The data, on which medical visualization methods and applications are based, are acquired with scanning devices, such as computed tomography (CT) and magnetic resonance imaging (MRI). These devices have experienced an enormous development in the last 20 years.

How to view DICOM file

Open a DICOM file

  1. Choose File > Open, select a DICOM file, and click Open.
  2. Select the frames you want to open. Shift-click to select contiguous frames. To select noncontiguous frames, Ctrl-click (Windows) or Command-click (Mac OS).
  3. Choose from the following options, and then click Open. Frame Import.

DICOM file format

DICOM stands for Digital Imaging and Communications in Medicine. It is a standard, internationally accepted format to view, store, retrieve and share medical images. DICOM conforms to set protocols to maintain accuracy of information relayed through medical images.

The file is represented as dcm. DICOM differs from other image formats in that it groups information into data sets. A DICOM file consists of a header and image data sets packed into a single file. The information within the header is organized as a constant and standardized series of tags. DICOM is the international standard to communicate and manage medical images and data. Its mission is to ensure the interoperability of systems used to produce, store, share, display, send, query, process, retrieve and print medical images, as well as to manage related workflows.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.