Project 1




Report:
- First define the Electrical models to Electrical components with geometrical defienitions.
- And make separate product files for the mechanical and electrical components.
- Then place the electrical components and mechanical components in Engine in the desired locations.
- After that make Electrical components as Electrically defined components.
- Then make routing through the electrical connectors and clamps.
- And use COT tube covering over the bundle for protection.
- after routing make flattening for the wire harness.
- And make drawing from the flattening.