Project 1
Steps involved in Engine routing:
1)Converted non electrical parts into Electrical parts by providing required Geomentries and electrical definitions.
2)Now, that electrical pasts are properly positioned into the required places.
3)Started elctrical routing by connecting all the coneectors.
4)P-clamp,L-Clip and Firr tree clips are used at required positions to manage the clearance.
5)For the plastic channel routing external curves are drawn and routing is done into the that reference.

