Project 1
From the above Information
FIRST CHECK THE SETTINGS AND CODES, MATERIALS
NEXT CONSTRUCTION LEVELS FROM SECTION VIEW

FROM GRIDS FROM THE PLANS GIVEN TO US

CRETE THE MEMBERS REQUIRED

FOR FOUNDATION INSTALL CONCRETE COLUMNS


IN THE SAME WAY INSTALL STELL COLUMNS AND BEAMS AND BRACE


INSTALL WALL PANEL AND ROOF PANEL


CRANE CALCULATION







APPLY THE LOADS

VALIDATE THE STRUCTURE ( ITS CORRECT )

APPLY WIND WIZARD



GO TO ANNALYZE AND CLICK ON 1ST ORDER LINEAR

WE CAN OBSERVE IF ANY MISKATE AND SLOVE IT
MY PROBLEM IS CHANGE FROM ONE WAY TO TWO WAY SLAB
SLOVE IT
AGAIN RUN THE FIRST ODER LINEAR
IF ANY PROBLEMS AGAIN SLOVE IT.
