Project 1
Aim:- To design a multi-storey Residential Building located in Bangalore using STAAD Pro Connect Edition
Procedure:-
Unit weight of the materials
|
SNO |
Name of material |
Unit weight |
|
1 |
Reinforced Cement Concrete |
25">2525 kN/m3">kN/m3kN/m3 |
|
2 |
Plain Cement Concrete |
24">2424 kN/m3">kN/m3kN/m3 |
|
3 |
Cement Concrete Screed |
20">2020 kN/m3">kN/m3kN/m3 |
|
4 |
Cement Masonry Units |
22">2222 kN/m3">kN/m3kN/m3 |
|
5 |
Structural Steel |
78.5">78.578.5 kN/m3">kN/m3kN/m3 |
|
6 |
Soil |
18">1818 kN/m3">kN/m3kN/m3 |
Dead Load
Floor slab
Slab weight = 3.75">3.753.75 kN/m2">kN/m2kN/m2 (0.15m×25kN/m3)">(0.15m×25kN/m3)(0.15m×25kN/m3)
Partitions = 1.5">1.51.5 kN/m2">kN/m2kN/m2
Floor Finish = 2.5">2.52.5 kN/m2">kN/m2kN/m2
Miscellaneous = 1">11 kN/m2">kN/m2kN/m2
Total Floor Load = 8.75 kN/m2">kN/m2
Roof slab
Slab weight = 3.75">3.753.75 kN/m2">kN/m2kN/m2 (0.15m×25kN/m3)">(0.15m×25kN/m3)(0.15m×25kN/m3)
Insulaions and Water Proofing = 0.5">0.50.5 kN/m2">kN/m2kN/m2
MEP Services = 0.5">0.50.5 kN/m2">kN/m2kN/m2
Miscellaneous = 0.5">0.50.5 kN/m2">kN/m2kN/m2
Total Roof Load = 5.25 kN/m2">kN/m2kN/m2
Live Load
Floor slab
Common Corridor = 3">33 kN/m2">kN/m2kN/m2
Total Floor Load = 3 kN/m2">kN/m2kN/m2
Roof slab
Accessible Roof = 1.5">1.51.5 kN/m2">kN/m2kN/m2
Total Roof Load = 1.5 kN/m2">kN/m2







































Result:-
Thus, multi-storey Residential Building located in Bangalore using STAAD Pro Connect Edition is been designed.