Identification of Cracks
1 a) Observation:
· Concrete crushed and reinforcement is exposed
· Concrete spalled beyond the reinforcement which man=y be a sign of rupture
· Beam top portion looks safe because of the flange advantage from slab
· The crack develops from bottom to top means rebar yielding occurs in support bottom only
Answer:
· Its form of flexural failure due to reversal of stress during earthquake.
· During stress reversal, support top experiences compression and bottom experiences tension.
· Top compression is managed slab advantage. Bottom tension was not satisfied by the provided reinforcement.
· Since the reinforcement got yielded got yielded, it cannot be repaired.
b) observation
· Cracks along the beam- column edge
· Cracks seem to have developed through the structure as it looks much wider
· Beam looks separated from the column at joints
· Concrete is not severely crushed.
Answer :
· Its Beam pull out failure due to insufficient development length of reinforcement in the joints
· During the earthquake, the horizontal movement of the structure makes this condition worse and attached the beam member from column
· Providing anchorage length between 2 exiting concrete is very difficult. So not repairable.
c) Obersvation:
· Cracks are exactly at the joint of the column beam
· Crack in beam developed thro its entire width
· Slab also developed more crack along the beam width direction
Ans:
· It’s a plastic hinge failure
· The damage occurred in the joint zone first of all
· Cyclic lateral loading & stress reversal at the joints led to the damage
· Even the slab participated to its best to handle the Tension (slab is severely cracked means it has undergone tension with its flange condition). But unable to control the damage
· The joint can be strengthened.
2 a) Observation
· Concrete damaged at top of a column
· Concrete damaged all around the column face
· Beams are safe
· The location of the column looks like it at the edge on the building
· No walls are built along the column means it is probably at the ground floor, for parking areas
Answer
· It’s a soft storey failure, technically plastic hinge formation
· Due to absence of Infill walls at the ground floor. The plastic hinge forma at he Top of ground storey columns during lateral movement.
· Based on the development of crush of concrete, it can either be repairable or Non repairable.
2 b) Observation
· Concrete developed complete breakage diagonally
· Longitudinal reinforcements are intact
· Shear reinforcement spacing looks wider (which means probably lesser shear rebar provided)
Answer
· It’s pure shear failure
· Inadequate shear reinforcement compels concrete takes all the shear stresses.
2 c) Observation :
· Column failed completely
· Failure at the top of column
· There 2 slabs connected to the column Probably one at mid height of the column
· The wooden piles might be a post failure support after the column failed, providing temporary prop to avoid collapse of the entire structure.
Ans:
· It’s a short column failure
· An additional slab or beam connected to a column in mid- height leads to this effect.
· This leads to failure especially if the connection is unintentional and not accounted in design
· The failure given in the picture is not at all repairable.