What is the mode of failure or damage of the beams in the figure above? Would you characterize the case as damage or as a failure? Are the damages repairable? Elaborate.
QUESTION-01
(Answer):
A)
Observations:
- Concrete crushed and the reinforcement is exposed.
- Concrete spalled beynod the reinforcement which may be a sign of rupture.
- Beam top portion looks safe beacause the flange advantage slab.
- The crack develops from bottom to top means rebars yielding occurs in support bottom only.
Solutions:
- Its form of flexural failure due to reversal of stress during earthquake.
- During stress reversal, Support top experiences Compression and Bottom experiences tension.
- Top compression is managed by Slab advantage. Bottom tension was not satisfied by the provided reinforcement.
- Since the reinforcement got yielded, it can not be reparied.
B)
Observations:
- Cracks along Beam-Column edge.
- Cracks seem to have developed through the structure as it looks much wider.
- Beam looks speparated from the column at joints.
- Concrete is not severely crushed.
Solutions:
- Its Beam pull out failure due to insufficient developemnt length of reinforcement in Joints.
- During earthquake, The horizontal movement of structure makes this condition worse and detached the beam member from column.
- Providing anchorage length between two existing concrete is very difficult. So not repairable.
C)
Observations:
- Cracks are exactuly at the joint of Column-Beam.
- Cracks in beam developed through its entire width.
- Slab also developedd more cracks along the beam width direction.
Solutions:
- It's a Plastic hinge failure.
- The damage occurred only in the joint zone first of all.
- Cyclic lateral loading & stress reversal at the joints led to the damage.
- Even the slab participated to its best to handle the Tension ( Salb is severely craked means it has undergone tension with its flange condition), But unable to control the damage.
- The joint can be strengthened.
QUESTION-02
(Answer):
A)
Observations:
- Concrete damaged at top of a Column.
- Concrete damaged all around the Column face.
- Beams are safe.
- The location of column looks at edge of the building.
- No walls are built along the column means it is probably at Ground floor, for Parking Car movement access.
Solutions:
- It's a Soft storey failure, Technically Plastic hinge formation.
- Due to absence of Infill walls at the Ground floor, The plastic hinge forms at the Top of ground storey columns during Lateral movement.
- Based on the development of crush of concrete, it can either be repairable or Non-repairable.
B)
Observations:
- Concrete developed complete breakage diagonally.
- Longitiuddinal reinforcements and intact.
- Shear reinforcement spacing looks wider (which means probably lesser shear rebar provided).
Solutions:
- It's a Pure Shear failure.
- Inadequate shear reinforcement comples concrete takaes all the shear stresses.
C)
Observations:
- Column failed completely.
- Failure at top of column.
- There are two slabs connected to the column, Probably one at mid height of the column.
- The wooden piles migth be a Post faiure support aftter column failed, providing temporary prop to avoid collapse of the entire structure.
Solutions:
- It's a Short Column failure.
- An additional slab or a beam connected to a Column in mid-heigth leads to this effect.
- This leads to failure especially if the connection is unintentional and not accounted in design.
- The failure given in the picture is not at all repairable.