Identification of Cracks
1.ANS:-
A)
- Concrete crushed and the reinforcement is exposed.
- Concrete spalled beyond the reinforcement which may be sign of rupture.
- Beam top portion looks safe becaude of the flange advantage from slab.
- The crack develops from bottom to top means rebar yielding occurs in support bottom only.
- Its form of flexural failure due to reversal of stress during earthquake.
- During stress reversal, support top experience compression and bottom experience tension.
- Top compression is managed by slab advanyages. Bottom tension was not satiesfied by the provided reinforcement.
- Since the reinforcement got yielded, it can be repaired.
B)
- Cracks along Beam-Column edge.
- Cracks seem to have developed through the structure as it looks much wider.
- Beam looks separated from the column at joints.
- Concrete is not severely crushed.
- Its beam pull out failure due to sufficient development length of reinforcement in joints.
- During earthquake, the horizontal movement of structure make this condition worse and detached the beam member from column.
- Provoiding anchorage length between two existing concree is ver difficult. So not repairable.
C)
- Cracks are exactly at the joint of column and beam.
- Cracks in beams developed throught its entire width.
- Slab also developed more cracks aong the beam width direction.
- Its a palstic hinge failure.
- The damaged occur only in the joint zone first of all.
- Cyclic lateral loading and stress reversal at the joints led to the damage.
- Even the slab participated to its best to handle the tension.( slab is severely cracked means it has undergone tension with its flange condition)
- But unable to control the damage.
- The joint can be stengthened.
2.ANS:-
A)
- Concrete damaged at top of a column.
- Concrete damaged all around the column face.
- Beam are safe.
- The location of column looks at the edge of the building.
- No wall are built along the column means it is probable at ground florr, for parking car movement access.
- Its a soft storey failure, technically plastic hinge formation.
- Due to absence of infill wall at the ground floor, the plastic hinge forms at the top of the ground storey columns during lateral movement.
- Based on the development of crush of concrete,
- it can either be repairable or non-repairable.
B)
- Concrete developed complete breakage diagonally.
- Logitudinal reinforcement are intact.
- Shear reinforcement spacing looks wider, which means probably lesser shear bar provoded.
- Its a pure shear failure.
- Inadequate shear reinforcement compels concrete takes all the shear stresses.
C)
- Column failed completely.
- Failure at top of column.
- There are two slabs connected to the column, probably one at mid height of the column.
- The wooden piles might be a post failure support after column failed, providing temporary prop to avoid collapse of the entire structure.
- Its a short column failure.
- An additional slab or a beam connected to a column at mid height lead to this effect.
- This leads to failure especially if the connection is unintentional and not accounted in design.
- The failure given in the picture is not at all repairable.