Identification of Cracks
Ans 1
1A-
Observation
- Concrete crushed and the reinforcement is exposed.
- Concrete spalled beyond the reinforcement which may be a sign of rupture
- Beam top portion looks safe because of the flange advantage from slab
- The cracks develops from bottom to top means rebar yeilding occurs in support bottom only.
Ans
- Its form of flexural failure due to reversal of stress during earthquake
- During stress reversal, support top experiences compressions and bottom experience tension
- Top compression is managed by slab advantage. bottom tension was not satisfied by the provided reinforcement
- Since the reinforcement got yielded it can not be repaired
1B
Observation
- Cracks along the beam- column edge
- Cracks seems to have developed through thr structurw as it looks wider
- Beam looks separated from the column at joints.
- Concrete is not severely crused.
Answer
- Its beam Pull out failure due to insufficient development length of reinforcement in joint
- During the earthquake the horizontal movement of structure makes this condition worse and detached the beam member from column
- Providing anchorage length between two existing concrete is very difficult. So not repairable.
1C
Observation
- Cracks are exactly at the joint of columns and beams
- Cracks in beam developed through its entire width
- Slabs also developed more cracks along the beam width direction
Answer
- Its a plastic hinge failures
- The damage occured only in the joint zone first of all
- Cyclic lateral loading & stress reversal at the joints led to the damage
- Even the slab participated to its best to handel the Tension but unable to control the damage
- The joint can strengthened.
Ans 2
2A
Observation
- Concrete damages at top of column.
- Concrete damaged all around the column face
- Beam are safe
- The location of column looks at edge of the building
Answer
- Its a soft storey failure, technically plastics hinges formation
- Due to absence of infill walls at GF the plastic hinge form at the top of ground atorey column during lateral movement
- Based on the development of crush of concrete it can either be repairable or non repairable
2B
Observation
- Concrete developed complete breakage diagonally
- Longitudinal reinforcement are intact
- Shear reinforcement spacing looks wider
Answer
- Its a Pure shear failure
- Inadequate shear reinforcement compels concrete takes all the shear stress.
2C
Observation
- Column failed completely
- Failure at top of column
- There are two slabs connected to the column, probably one at mid height of the column
- The wooden piles might be a post failure support after columns failed providing temporary prop to avoid the collapsed of the entire structure
Answer
- Its a short column failure
- An additional slab or beam connected to a column in mid height leads to this effect
- This lead to failure especially if the connection is unintentionally and not accounted in design
- The failure given in the picture is not at all repairable.