Challenge

Identification of Cracks

1 a) OBSERVATIONS:

  • Concrete crushed and the reinforcement is exposed
  • Concrete spalled beyond the reinforcement which maybe a sign of rupture
  • Beam top portion looks safe because of the flange advantage from slab
  • The crack develops from bottom to top means rebar yielding occurs in support bottom only

ANSWERS:

  • It is form of flexural failure due to reversal of stress during earth quake
  • During stress reversal ,support top experiences compression and bottom experiences tension
  • Top compaction is managed by slab advantage .bottom tension was not satiesfied by the provided reinforcement
  • Since the reinforcement got yielded it can not be repaired

1 b) OBSERVATIONS:

  • Cracks along Beam - Column edge
  • Cracks seem to have developed through the structure as it looks much wider
  • Beam looks separated from the column at joints
  • Concrete is not severely crushed

ANSWERS:

  • It is beam pull outfailure due to insufficient development length of reinforcement in joints
  • During earth quake the horizontal movement of structure makes this condition worse and detached the beam member from column
  • Providing anchorage length between two excisting concrete is very difficult . so not repairable

1 c) OBSERVATIONS:

  • Cracks are excatly at the joint of column beam
  • Cracks in beam developed through its entire width
  • Slab also developed more cracks along the beam width direction

ANSWERS:

  • It is a plastic hinge failure
  • The damage occured only in the joint zone first of all
  • Cyclic lateral loading & stress reversal at the joints led to the damage
  • Even the slab participated to its best to handle the tension(slab is severly cracked means it has undergone tension with its flange condition) But unable to control the damage
  • The joint can be strengthened

2 a) OBSERVATIONS:

  • Concrete damage at top of a column
  • Concrete damaged all around the column face
  • Beam is safe
  • The location of column looks at the edge of building
  • No walls are built along the column means it is probably at ground floor for parking car movement access

ANSWERS:

  • It is a soft storey failure , Techincally plastic hinge formation
  • Due to absence of infill wall at the Ground Floor ,the plastic hinge forms at the top of ground storey columns during internal movement
  • Based on the development of crush of concrete it can either be repairable or non repairable

2 b) OBSERVATIONS:

  • Concrete developed complete breakage diagonally
  • Longitundinal reinforcement are intact
  • Shear reinforcement spacing looks wider ( which means probably lesser shear rebar provided)

ANSWERS:

  • It is a pure shear failure
  • Inadequate shear reinforcement compels concrete takes all the shear stresses

2 c) OBSERVATIONS:

  • Column failed completely failure at top of column
  • There are two slabs connected to the column, probably one at mid height of the column
  • The wooden piles might be a post failure support after column failed,providing temporary prop to avoid collapse of the entire structure

ANSWERS:

  • It is a short column failure
  • An additional slab or a beam connected to a column in mid-height leads to this effect
  • This leads to failure especially if the connection is unintentionally and not accounted in design
  • The failure given in the picture is not all repairable
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.