1) a) As i understand this is a concrete beam crack which occurs due to corossion or insufficient concrete cover. As the lower section of the beam is exposed to the environment so the lower or the side face of the beam faces these cracks and it can be said as bottom reinforcement crack along the length. If we talk about…

    Project Details

    Loading...

    Leave a comment

    Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.

    Please  login to add a comment

    Other comments...

    No comments yet!
    Be the first to add a comment

    Read more Projects by Namanpreet Kaur (14)

    Project 2_Design & Analysis of a Hostel building at Guwahati, Assam

    Objective:

    AIM: To design and analyse G+3 hostel building in Etabs and foundation in CSI SAFE. INTRODUCTION:  The procedure for the analysis and design of a given building will depend on the type of building, no. of storeys, building's complexity and many more. The procedure for structural design will involve many steps…

    calendar

    13 Feb 2022 06:57 PM IST

      Read more

      Foundation Design using SAFE

      Objective:

      AIM: 01 Model the isolated footing provided in week 11 on SAFE, analyse and design it to verify the size, depth and steel provided as per calculations. PROCESS/ STEPS TO BE FOLLED: Open the safe software  change the IS code and unit system   Select single footing  A tabular box will occur  Change the…

      calendar

      09 Dec 2021 05:12 PM IST

      • DESIGN
      Read more

      Structural Modelling using Etabs 2018

      Objective:

      Aim: To create a modal of G+7 building given in the architectural drawings as per the provisions of IS 1893 and IS 13920 followed by response spectrum analysis. PROCEDURE/ STEPS TO BE FOLLOWED: Plan is plotted according to the dimensions given in the architectural plan. Next we will add material properties as grade of…

      calendar

      09 Dec 2021 07:42 AM IST

        Read more

        Projefct 1_Comparative study of different storey buildings for Seismic forces

        Objective:

        AIM:- To compare Fundamental natural periods of building E & F as well as G & H and the significance difference. Fundamental natural periods of building H,J and K also as have the building have become flexible or stiff due to change in mass Fundamental natural period of building A, B, F and H with change in…

        calendar

        08 Oct 2021 08:25 PM IST

        Read more

        Reinforcement detailing of Columns from ETABS output

        Objective:

        Introduction: Column is a Structural vertical member which basically carries compressive loads  Columns are primarily intended to resist the longitudinal compressive forces Columns are classified as short, intermediate or long depending on their lengths, their material or there type Process to be followed: Step-01…

        calendar

        30 Sep 2021 09:26 AM IST

          Read more

          Design of Shallow Foundation (Isolated Footings)

          Objective:

          Providing isolated footing  Square footing  column size=400x400 Axial load=2000kN Soil Bearing capacity= 150KN/m2 Grade of concrete(fck)=M25   Size of footing: Assuming self weight of footing equals to 10% of superimposed load =10% x 2000 =.1x2000 =200KN Total load=200+2000          …

          calendar

          28 Sep 2021 09:34 PM IST

            Read more

            Reinforcement Detailing of Beams from ETABS output

            Objective:

            Step-01 After downloading the challenge open it in Etabs 18 first  Step-02 Now we will check the design preferences Step-03  Now we will go for design check for all member We can the details by moving the curser to the beam  Step-03 We need to draw the reinforcement diagram of span3 continuous beam and also…

            calendar

            28 Sep 2021 08:07 PM IST

              Read more

              Analysis & Design of RCC shear walls in the model using ETABS

              Objective:

              Step-01 After Downloading the challenge open it in Etabs we have run the analysis very first Step-02 From the display option , select show tables  After selecting show tables, go to analysis output then select modal participating mass ratios and click on the ok button This table of modal mass ratio will be visible…

              calendar

              28 Sep 2021 07:14 PM IST

                Read more

                Modelling of 25 storey building with the specified properties using ETABS

                Objective:

                PROCEDURE TO BE FOLLOWED: Open the ETABS software  click the file menu and choose to create a new modal option after choosing a new model a dialogue box will appear  choose the built in setting option and select the display unit after the modal is intialized select the grid and storey inputs from the new modal…

                calendar

                27 Aug 2021 10:08 AM IST

                Read more

                Conceptual design of a building with columns and shear walls

                Objective:

                1)    Shear walls in the plan should be symmetrically located to reduce the twist or collapse effect. As it experiences the maximum effect of lateral forces it also reduces the lateral displacement under the effects comming upon. Its main function is to provide the lateral strength to the building to resist the…

                calendar

                25 Jul 2021 08:12 PM IST

                  Read more

                  Calculation of Stiffness in Structural elements

                  Objective:

                  The answers are attached with pictures.

                  calendar

                  23 Jul 2021 08:14 AM IST

                    Read more

                    Concept on positioning of Columns

                    Objective:

                    1) Firstly the plan is not symmetric as structure simplicity and symmetry plays a very vital role in safety of the building so symmetry and regularity in the elevation is also must this has a symmetry structure above leaving the lowest part more narrow which disobey the fact of symmetry some where and also regularity of…

                    calendar

                    01 Jul 2021 07:37 PM IST

                      Read more

                      Understanding the concepts on Degrees of Freedom

                      Objective:

                      I have attached my answers in the attachment 

                      calendar

                      28 Jun 2021 10:07 AM IST

                        Read more

                        Identification of Cracks

                        Objective:

                        1) a) As i understand this is a concrete beam crack which occurs due to corossion or insufficient concrete cover. As the lower section of the beam is exposed to the environment so the lower or the side face of the beam faces these cracks and it can be said as bottom reinforcement crack along the length. If we talk about…