Identification of Cracks
1) Objectives of the challenge are:
Awarenes on structural failures
Distinguishing structural and non-structural failures
To know how to observe a structural issue
Understanding seismic failures
a) Observations:
Concrete crushed and the reinforcement is exposed
Concrete spalled beyond the reinforcement which may be a sign of rupture
Beam top portion looks safe because of the flange advantage from slab
The crack develops from bottom to top means rebar yielding occurs in support bottom only
Its form of flexural failure due to reversal of stress during earthquake
During stress reversal, suport top experiences compression and bottom experiences tension
Top compression is managed by slab advantage. Bottom tension was not satisfied by the provided reinforcement
Since the reinforcement got yielded, it can not be repaired
b) Observations:
Cracks along Beam-column edge
Cracks seem to have developed through the structure as it looks much wider
Beam looks separated from the column at joints
Concrete is not severly crushed
Its beam pull out failure due to insuffiecient development length of reinforcement in joints
During earthquake, the horizontal movement of structure makes this condition worse and detached the beam member from column
providing anchorage length between two existing concrete is very difficult. So not repairable
c) Observations:
Crackes are exactly at the joint of column-beam
Cracks in beam developed through its entire width
Slab also developed more crackes along the beam width direction
Its a plastic hinge failure
The damage occurred only in the joint zone first of all
Cyclic lateral loading and stress reversal at the joints led to the damage
Even the slab participated to its best to handle the tension( Slab is severely cracked means it has undergone tension with its flange condition), But unable to control the damage
The joint can be strengthened
2)a) Concrete damaged at top of the column
Concrete damaged all around the column face
Beams are safe
The loaction of a columns looks at the edge of the building
No walls are built along the column means it is probably at ground floor, for parking car movement access
Its a soft storey failure, technically plastic hinge formation
Due to absence of Infill walls at the ground floor, The plastic hinge forms at the top of ground storey columns during lateral movement
Based on the development of crush of concrete, it can either be repairable or Non repairable.
b) Observations:
Concrete developed complete breakage diagonally
Longitudinal reinforcement are intact
Shear reinforcement spacing looks wider (Which means probably lesser shear rebar provided)
Its a pure shear failure
Inadequate shear reinforcement compels concrete takes all the shear stresses
c) Observations
Column failes completely
Failure at top of the column
There are two slabs connected to the column, probably one at mid height of the column
The wooden piles might be a post failure support after column failed, providing temporary prop to avoid collapse of the entire structure
Its a short column failure
An additional slab or a beam connected to a column in mid height leads to this effect
This leads to failure especially if the connection is unintentional and not accounted in design
The failure given in the picture is not at all repairable