Challenge

Identification of Cracks

Identification of Cracks

1) What is the mode of failure or damage of the beams in the figure above? Are the damages repairable? Elaborate?

a)

a). Observations:

  • Concrete crushed and the reinforcement is exposed –
  • Concrete spalled beyond the reinforcement which may be a sign of rupture.
  • Beam top portion looks safe because of the flange advantage from slab.
  • The crack develops from bottom to top means rebar yielding occurs in support bottom only.

Answer: -

  • Its form of flexural due to reversal of stress during earthquake.
  • During stress reversal, support top experiences compression and bottom experiences tension.
  • Top compression is managed by slab advantage, bottom tension was not satisfied by the provided reinforcement.
  • Since the reinforcement got yielded, it cannot be repaired.

b)

b). Observations:

  • Cracks along beam-column edge.
  • Cracks seem to have developed through the structure as it looks much wider.
  • Beam looks separated from the column at joints.
  • Concrete is not severely crushed.

Answer: -

  • Its beam pulls out failure due to insufficient development length of reinforcement in joints.
  • During earthquake, the horizontal movement of structure makes this condition worse and detached the beam member from column.
  • Providing anchorage length b/w two existing concrete is very difficult, so not repaiable.

c)

c). Observations:

  • Cracks are exactly at the joint of column-beam.
  • Cracks in beam developed through its entire width.
  • Slab also developed more cracks along the beam width direction.

Answer: -

  • It’s a plastic hinge failure.
  • The damage occurred only in the joint zone first of all.
  • Cyclic lateral loading & stress reversal at the joints led to the damage.
  • Even the slab participated to its best to handle the Tension (slab is severely cracked means it has undergone tension with its flange condition), but unable to control the damage.
  • The joint can be strengthened.

Question 2).

a)

a). Observations:

  • Concrete damaged at top of a column.
  • Concrete damaged all around the column face
  • Beams are safe.
  • The location of column looks at edge of the building.
  • No walls are built along the column means it is probably at ground floor, for parking car movement access.

Answer: -

  • It’s a soft storey failure, technically plastic hinge formation.
  • Due to absence of infill walls at the ground floor, the plastic hinge forms at the top of ground storey columns during lateral movement.
  • Based on the development of crush of concrete, it can either be repairable or non-repairable.

b)

b). Observations:

  • Concrete developed complete breakage diagonally.
  • Longitudinal reinforcement are intact.
  • Shear reinforcement spacing looks wider ( which means probably lesser shear rebar provided)

Answer:

  • It’s a pure shear failure.
  • Inadequate shear reinforcement compels concrete takes all the shear stresses.

c)

c). Observations:

  • Column failed completely.
  • Failure at top of column.
  • There are two slabs connected to the column, probably one at mid height of the column.
  • The wooden piles might be a post failure support after column failed, providing temporary prop to avoid collapse of the entire structure.

Answer:

  • It’s a short column failure.
  • An additional slab or a beam connected to a column in mid-height leads to this effect.
  • This leads to failure especially if the connection is unintentional and not accounted in design.
  • The failure given in the picture is not at all repairable.
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.