Steps in the Planning Process: Phasing, Proactive Action and Guidance
A free lesson from Skill-Lync's Project Planning and Scheduling course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Week 1 Session 2”
What will you learn in this free Project Planning and Scheduling lesson?
The instructor argues that planning is not just paperwork and walks through steps such as scope identification and phasing. Phasing is shown with contract-driven, payment-driven and time-driven examples, including a runway and terminal built in two phases, and the lesson ends with a week-one recap.
- Why planning is not only paperwork
- Proactive planning, such as stockpiling before restrictions
- Phasing driven by contract, payments or time
- Driving the project versus being driven
What comes after lesson 2?
The next free lesson is lesson 3, “Planning, Monitoring and Control Systems for Construction Sites” (15 min). Later in Skill-Lync's Project Planning and Scheduling course (paid): lesson 4, Week 2 Session 2; lesson 5, Week 2 Session 3; lesson 6, Week 3 Session 1. The full course has 30 lessons (15 h 3 min of video); see the course overview or its price and syllabus.
Lesson transcript
Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.
Now what are the basic steps in the planning process? Now let me again take back to the same example what from where I started with the kids example of the mother's birthday party celebrations and how she asked the questions and how the basic step-by-step she approached and now how that steps can be linked to a professional setup when she comes to mega infrastructure projects or the construction residential projects or any other industrial corridors being constructed. how that fundamentals are being linked here. Now that's planning and paperwork are synonymous. It's not the case that people think that I want the planning profile because I am just a sophisticated person. I can insert in the laptop and I want to do that job. So let us switch over to the planning. It's a fascination. Everybody wants to switch into planning. It's not the case that planning people has to be at site and they really need to have the grip of the site activity. Then only they can be a good planner.
It's not the case that any fresh engineer who is just coming out of the college can be able to become a good planning engineer. No, because you really need to have some of the practical exposure. You really need to understand the cycle of the work. You really need to understand the operational cycle and to understand that once the things you are doing by your own hands, then only you can better operate those things. And then only you can better plan once you sit in an office and when you plan for others because you really need to know your work yourself. Then only you can produce a plan for others. So it's not only the paperwork. It has to have a practical orientation because if you are concentrating more on the paperwork, then definitely you are bound to fail on this.
So that myth that planning and paperwork are synonymous, that planning, okay, somebody has to do the planning work, project manager and the construction they do and some engineers, software persons who are well versed in this computer and all that reports, Excel sheets are to be taken. Those youngsters, young girls and boys are sitting and doing this paperwork. They are doing the planning. People use them and term them with some sarcasm. People use them, okay, what you are doing it. You feel also somewhat dejected. Some feel, some use this misuse as this power that, okay, I am sitting with a laptop. I am much more proximity to the top management. I am much more superior.
It's not the case. What you are planning that only they are building, that should be the approach and you should also respect them because if they are not building, your plan is a waste and they should also realize that what they are executing is as per your plan. So you are also important. So it's a teamwork. So it's not like a planning and paperwork are synonymous and it's not only presentations, it's not only Excel sheets, it's not only bar histograms, it's not only S-curves, it's not only scheduling.
Planning is altogether a different thing which really needs to understand that you really need to display intelligent behavior of organizing your project, okay. So when we come to reality, planning becomes very exhaustive exercise, which will help to take out the struggle in the execution, it will direct the team with ease, take people into confidence. Definitely there has to be proactive actions. Once you plan in advance, you know the foresighted dangers, you know the foresighted concerns, how the things will happen. You can foresee that there is an eventual logistic roadside, one being called by some trade unions and all. So you will have that your impact of your raw material movement.
So you really need to plan them, you really need to reschedule something of the activities, you really need to send some money and store those materials or you really need to postpone certain actions at site if it is unavoidable. Like take an example in during 15th August and 26th January, like the sites near the capital regions and the capital NCR are really the borders get sealed up. Mostly the sites and the construction planning engineers have a tendency to stockpile materials by 20th of January or 10th of August in advance because they know that from 13th to 17th of that month or 24th to 27th of that January, that definitely there will be no movement allowed by the administrative authorities.
So I need to plan that out. So these are certain experience which you really need to take it out. So that makes the struggle of the execution team much more easier. That's called as a proactive actions. So these are certain aspects of the basic steps in the planning process. So what are the basic steps in the planning process? It involves co-identification. Keep recalling my layman's example of the birthday party, all the theoreticals and this book, whatever have been taught in this MBA curriculum, and all will link to the same basic fundamentals. The vocabulary, the usage, the combination of words are being now sophisticated and a theoretical definition comes.
But recall that basic example that how it is being done. Planning your scope identification, understanding the contract and obligations, understand your client and the requirements, establish an effective rigorous monitoring system. So as a picture depicts, if you don't plan your things, this wild cheetah in Africa might not have planned when to attack, how to attack and just might have exposed himself in the open exposure of the area and the deers are running away. So he lands up in a situation where the deers are running away from him or you can interpret the same picture in a different way that these deers were so much involved in not forcing any threat and they were so much greedy in eating this so much beautiful dry grass that they get obsessed with this grass and they have not foreseen and they are open and they are isolated from the group.
So these two deers are exposed to a threat that they can be attacked by the cheetah. So you can take both the vice versa as the vision you want to take from this pictorial. But the point is this, if you don't plan, you're really going to end up in a tough situation in the any stage of the project management. So when you start planning your activities, definitely your stature rises. The stature rises is not the case of any promotions and all that will come eventually if you are really performing in an organization and depends upon the organization's policies.
Point is this here, I want to refer that your stature rises means that yourself as a planning engineer, as a planning professional will definitely have much more confidence, much more grip on the activities. The more you are confident, much more you are having the grip on the work, definitely your stature will rise. People will start respecting you that you have some certain content inside you. You really need to be discussed and your inputs really need to be taken before conclusion is arrived. That's I refer as a stature rise. It's not that from certain point you will be started.
It's a symbolical way of representing, but I'm telling that as soon as you start having planning your work, organizing yourself much better way, taking the things head on and taking the things in your grip, your stature in the organization, stature in the side team, in the stature in the in your colleagues definitely will go up. Now comes to the second stage. But I told that how it has to be done, when it has to be done, where it has to be done. But example of the palm, you can refer that in the steps of the planning process, there is called as a phasing of the project.
A project as I told has a start date, has an end date. So based on the start and end date, there is a phasing of the project. How you call the phasing of the project means? Like take an example, sometimes that phasing will be driven by the contract. The client or the customer itself might be saying that, OK, I need this much infrastructure. But in the phase one, in take it as a phase one, you have to build one particular runway and a small terminal for a capacity of five million in the phase one.
Eventually, as the passenger flow will increase, you will switch over to a two runway and a terminal building of a bigger terminal building with capacity of two 12 million. So these are the contract wise, the contract itself is in the first two years, I have to build one small runway, I have to build one small terminal. In the second phase, I have to build one bigger runway and a second terminal. So it's the contract is driving that phasing. So when you are planning for that, you have to plan for phase because phase one will might have different duration because quantity is different.
Then quality has to be the same, but the time is different. But when you go for a bigger concept, the time is more and the durables are much more in quantity. Quality and safety standards, as I told, remain the same. So sometimes the phasing of the project is being driven by the contract itself. Contract means the agreement signed between the two parties that they are agreed to bond for certain conditions with certain exchange of interest, like be it money, be it in a different way. So that's called as a contract, which definitely will be taken up in the contract management class of the project.
They will have a elaborate definition of this. What is contract? Just to recollect from that, this contract is the agreement between the two parties to deliver a project where the client drives the condition, what are his requirements and you drive on the for that particular derivatives. I need this much amount of money for that and this is the time I need and the time is getting agreed by the client. So then the contract is getting signed at this particular moment. You just understand this. This is a contract and based on this contract.
Sometimes phasing is being driven. Now, sometimes phasing of the project also depends upon the payment schedule. Like if there is a payment schedule, then the phasing of the project goes that if there is and more payments coming or more cost centers attached to a schedule of activities, which are ahead of the project incoming in the earlier time frame of the calendar of the project, then definitely as a planning person, you can phase that project, okay, which is giving me early money that I will try to phase it out first, which is not having giving much of money or which is not critically required also to the client can go to a later date.
Example, like in a mixed use development where there are. Essential projects, the commercial projects and there is a mall area or the club area. A developer wants to have that project. So as you understand, the commercial spaces are being interiorly finished by the end user. The company who is occupying the space will have their own interiors and those company's stakes are at very high level. The count terms and the values, the zeros are much more higher as compared to a small flat in the same complex.
So most of the clients want that apart from the entire commercial complex and the residential complex, we should try to really hand over the phasing of the commercial buildings first because as soon as you hand over the commercial buildings, the companies who are opening their offices or those managing those building will take over and do their interiors. By that time, you can start finishing your residential also. So that's the phasing of the project. So based on that, there is also a payment schedule linked for this.
So in that way also, you can do the phasing that there is a phase one for commercial, then there is a phase two for residential. That's the example I'm giving. And sometimes for the customer delight also, you can start doing that phasing is a contract doesn't say anything. But as a planner, but as a planner, for any mix is a development, you can do that phasing of the project. And then sometimes phasing of the project, as I told, gets driven by time frame of the project.
How this time frame of the project is driving the planning process? Because either you have to have an approach to drive the works or get driven. I will try to elaborate this term because it might be somewhat confusing. Drive or get driven. Take an example of the Taj Mahal. What you feel? Was it get driven or it was driving the people managing the Taj Mahal? Were they driving or they were getting driven? What I feel with the textbook, whatever I visited the place, whatever guides are telling in those places and whatever books I read, I think it was not driven by them.
They were getting right with the time phase, whatever ability of the material, how much time it takes, let it get driven. So the point is this, either the planning projection has that we have to drive this end rates are fixed, cost is fixed at any how we really need to work this way or the other. Keep on having correcting measures and then drive the project or get driven that, okay, sir, what can be done? Rain has happened. Sir, what can be done? Labours are not there. Sir, what can be done? Material is not there. Sir, what can be done?
Strike happened. So it's called as getting driven. Whatever eventualities, there is nothing wrong in that. These things might happen in the project. But in this case that there is a lethargic approach, there is no proactiveness that you are just getting driven with the consequences on day to day basis and you are postponing the activities. And then there is an approach called driven. I am driving. I need this has to happen today. Come what may, if I really spend and over budget myself for two rupees, because if I am spending two rupees more here now, I will finish the project in time.
And really save crores and thousand rupees on my overheads for an overstay. The more your resources are keeping for a project duration, the more you are spending. Nothing comes off free. I told you time and money, time and money. So drive or get driven. The second way of terming it is forward integration and backward integration. What is this called as forward integration or backward integration? It is the same way. There is a schedule of activities like you take an example. Like you say, again, I will go back to the same basic fundamental of that.
If you are visiting from your home to your home, either you think, OK, at whatever time I want to start, I will start. I will see as and when. As soon as the traffic jams being incurred, as soon as my vehicle goes wrong, I will not worry about it. I will keep on taking options. I will go start with the Ola cab. Suddenly Ola cabs get denied that I will not go further. There is a traffic jam. I want to cancel the ride. You are getting down.
You are OK with that. Then you are hiring an auto. Then you are somewhere far, you are taking an auto. Then you are going to find, OK, you are late. So you are not stuck up in a jam. Then you are taking a pillion rider with a cycle, taking a lift with some and then adjusting, reaching this and that. And eventually you miss the flight. This is called forward integration because then you are helpless because your approach is justified that I tried my best. Why? What is my mistake?
Ola cab has canceled the flight. There was a traffic jam by others. Unnecessary people are fighting at the roads. Therefore, that jam was there. There is no mistake of mine. OK? That is also an approach rather acceptable in this modern world that the time will tell. Now there is called a backward indicator. What? I need to reach airport at 4 o'clock come what may. OK? That's a plan. So at 4 o'clock I have to plan. So by the main congested junction before the airport is one place.
So I and mostly time was taking 20 to 25 minutes. People get stuck up there. So I need to reach that place by 3.30 so that I have a margin of 20 minutes. So to reach that place 3.30 from my place it will take one hour. So I need to start at 2.30. To start at 2.30, I really need to book a cab and ensure that Ola stands in front of my gate at 2.15. And I negotiate with him. I am pursuing him whether there is no chance of any change in your plan and mood and your schedule that you are driving me home.
I am having the cash money. I will pay you with Ola money. That all things you are concluding, agreeing upon so that there are no hazards. There are no change in the plan in the midway of the route. And you are boarding the car at 2.30. So once your car starts, some way or the other times this that might happen. Your tire might get punctured. But still you have that margin of 20 minutes. If you because you have that in mind that if I cross that juncture at 3.30, I definitely I am going to reach at 4 o'clock and my flight is at 5 o'clock.
So you have that margin. You have now you again plan that change the plan that OK, I am getting stuck up in the middle. OK, I will check the web check-in I will do in advance. So from the midway of your route, you have done the web check-in so that you are saving time. And these are certain actions. So what is called as backward integration? So when you are finishing, OK, so so step by step, this must take full time. So really, I need to start now.
So what time? That's called as a backward integration. And forward integration means that you just go let the flow. So you just get driven whatever is being coming in the fifth phase. So that's the difference between drive, get driven, forward integration and backward integration. So what all examples I gave that setting up your milestone in the entire duration as per the frozen time frame. The example that there is what this juncture in the midway of the path that there is a cross section that which I have to cross the junction.
These are certain milestones that if I have to start at 2 and you have to reach at somebody at 4, that definitely I have to cross this critical junction at 3 or 3.30. That is the frozen time frame. So you are setting up your milestones for yourself. That is a key factor when you are deciding that how the step by step the planning process has to be taken up. Now, once the phasing of the project is done, that how the project phased is done, done either through the contract or to the time frame, whether you are clear in your methodology that I will get driven or I will drive my project or I will have the backward integration, you really need to make your work breakdown structure.
Now, what is this work breakdown structure? Remember again the same example of the kitchen birthday party that the key project was celebration of the birthday party of the kid and calling all the friends at a home dinner or lunch. So what was your mother's work breakdown structure for the same? The work breakdown structure what she might have made that there is an early preparation what she was doing at 9. I am just telling with example, she never plans on the paper, she never plans on MSC, she never plans a project.
We are correlating these modern terms with the age-old practices. Okay, so keep that in mind. Early preparations, second day she is making off-site preparations. That means before the day of 8 o'clock there are certain preparations like cake, birthday, which has to be done at 8 o'clock only. But parallel to that she has to prepare a lot many things back end in the kitchen. So there is a venue preparation or decoration of the dining hall, that's it, activity. Then there is an activity in the kitchen. Under the kitchen there are lot many things under cooking, under ordering, under chopping the vegetables, cooking the menus, sometimes taking help of the resources by outsourcing some menus from outside.
So there is a WBS, she is just breaking her entire party into different, different small fragments. I will use the term as different, different small fragments, which are derivatives in a way or the other might be a type of relay race that some outputs might be input for the other step. And sometimes outputs can be a standalone output in it itself. So that's called as the breaking down into different, different fragments. So in a theoretical definition, a work breakdown structure is at the heart of every large project.
You can find a small project trying to get out. There is a work breakdown structure in that kitchen example to a small project that you can find that there is a work breakdown structure. There is an activity you are breaking down into simpler parts and then you are arranging into a structure. So what is called as work breakdown, a specific activity breakdown means to divide into separate and simple parts to arrange in a definite pattern. Like take example of now a project, a mixed use project.
Now there are nine towers. So basically now you are phasing, first phasing you are doing that can be in the first phase. There are four commercial towers, that first one commercial towers, phase two, I will do later. Because if the time difference is, if the same time is there, there is no need to do the phasing. You can do it in the same WBS itself. If there is a time difference that four commercial towers are to be given in two years, residential towers are to be given in five years.
Okay, the phase one is having commercial towers, phase two is having residential towers. Under the phase one, there are four towers. So your work breakdown structure is tower one, tower two, tower three, tower four. So that's the first, you are providing that, you are organizing yourself. Now you have to plan. For Tower 1, when it is going to start, when it is going to finish, when the drawings will be available for that, what is the end date. Then you have to same for Tower 2, same way for Tower 3, same way for Tower 4.
That's your first breakdown structure at one level. Then you can further break down that into an activity that, okay, under Tower 1, I will track the foundation work. I will track a superstructure, means the structure, whatever you are constructing above the plinth level is called as a superstructure. Then you can call the facade work, building, enveloping, then MEP services, MEP services, heating, ventilation, then electromechanical equipments like STP in a big commercial projects. So these things you have to understand, these are certain work breakdown structure. Now every structure, every small project is like, as I said, it's popping up into the big project.
We'll have their own activities, ordering, manufacturing, deliverance, connections, everything, like small floor. So one small floor, you are telling, you have to build coordinations, you have to build columns, you have to build slab. Every slab will have shuttering activity, staging, reinforcement tying, concreting, lot minute, those are the activities. So when you organize the activity into different, different fragments that you call, what is your work breakdown structure? So it's being, the term is being used by someone, what is your WBS, what is your WBS? So try this, there is nothing bigger, magical word they are using.
Let us simplify, nothing they are asking, nothing they are talking about, they are just talking about the breaking of the structure. So now it is called as WBS, work breakdown structure. Because don't get confused with the sophisticated words, it's all the same common sense, it's common sense. May I just try to keep recalling that it's a fundamental display of intelligent behavior. It's only application of common sense. So how you are dividing your work, that is called as work breakdown structure. So, when it comes up to the work breakdown structure and the theoretical definition of the same goes like that.
WBS is a multi-level code structure of work packages used to organize, define and display all work elements to be carried out to achieve project objectives. What I referred as same, it's in theoretical definition, what I referred that you are dividing the entire things into smaller, smaller fragments, what you want to really organize and how you want to track, how you want to deliver the things. That's that way you are defining a WBS. Another way of explaining it is higher level breakdown happens with customer stakeholder involvement.
The lower level breakdown is a function of the project reporting needs. Like, take example, what I told, four commercial towers, four residential towers, if are getting delivered on the same time, definitely you don't need phasing. You can directly make a WBS, commercial WBS, residential WBS. Commercial has four towers, residence has four towers. So, this higher level breakdown happens where the customer stakeholder involvement, customer wants, okay, I want to track my commercial towers, I want to see my residential towers in the schedule, I want to track.
So, you really need to organize it. Once you further go lower down, it will try to have much more emphasis on your reporting and monitoring needs. So, that depends how you keep on subdividing into your fragments, to how much level you can really track and your reporting needs. Based on that, you can keep on dividing into your fragments. And the last one will be your fun, one single activity. You can club these activities, it's a group of similar activities organized together to deliver an objective can be convened as a WBS.
Everything is an action. These three actions are required, you can club that three actions, you can club those five actions as a common objective, as a common derivable and into one WBS. So, that you can really track that, okay, as organizing these three things are linked. That's why it is called the lower level breakdown is a function of the project reporting needs. Now, WBS is the purposeful logical structuring of the entire project scope. See the definition, purposeful logical structuring. What is your logic? Yes, with a purpose you are, because you want to track what is the status of commercial, because commercial has to be handed over first.
What is the status of the residential? Once it comes to airport, the runways are important. The areas where the baggage handling is being done is more important. So, you are purposely tracking, okay, I need to track that area where the baggage handling. So, where is the arrival of? Because in the entire airport, if you don't track runway, if you don't track the ATC, your planes can't land. And if you don't plan your passenger and the baggage handling, the airport itself is of no use. If other things, the retail area, your resting area are not that critical, people really need to rest.
You need to deliver that particular area also. But as a foremost objective, your first and foremost focus in an airport is runway, terminal building. In that terminal building also, baggage handling area, where the people will arrive, where the people will be departing. That all the things are very important. And so, it is a purposeful logical structuring of the entire project scope. The number of levels of the WBS depends upon the size and complexity of the project and the customer. What I referred earlier also, how your WBS depends, how much level is your reporting needs, is your customer's facing, how he is facing.
If you have the same time frame, then definitely WBS can be much more elaborative. The number of WBS depends upon the size and the complexity. It is very really rightly said that how you are setting up the requirements, at what level you want to drive the things, at what level you want to monitor the things, will become the part of the WBS. Now, basic steps in the planning process. The work breakdown structure, again, comes under two definitions. Manageable elements and measurable elements. If you can recall my previous discussion of this, manageable elements means, what all you really need to deliver.
I need to deliver commercial tower. What is the most critical factor in the commercial foundation? Then, every floor has to be given. Because, every floor has a different client. Some offices might be taken by Microsoft. Some offices being already purchased by Skilling. Some offices already purchased by some other construction company. Some offices already purchased by SCL. Some offices are accompanied by some ex-company. Some offices are accompanied by 3M. Some floor is occupied and already purchased by some other multinational. So, all floors are important. So, you really need to hand.
So, some basic amenities really need to be completed. You need to have that power on. You need to have that drainage system. You need to have the plumbing system in place. But, level-wise, you really need to hand over. So, what are you managing? Every level you are managing. So, you can have a WBS of level-wise. Because, every level have a different activity. So, you can have a WBS of L1, L2, L3, L4, L36, high-rise, L38, L48 in Bombay and all. And then, you can have a work-burner structure in measurable elements.
Like, I need to measure the concrete. I really need to measure the MAP works in piping. I really need to measure the number of lifts. So, I can have a WBS for vertical and horizontal transport system, VST. I can have a work breakdown of MAP services. How much heating plumbing I am required. How much piping I am doing. So, what are you all measuring? So, that elements can be part of WBS. And, what are you are manageable? What is you are managing? So, that can be part of the work breakdown structure.
So, you keep... So, you understand entire TK project. Be it any mechanical project. Be it any construction project. Be it launching of a rocket also. There is a WBS. Okay. You don't think that if you are from this industry or from other industry, this is not relevant to you. No. That is also relevant to you. If you are even producing a car company. If you are recommending car manufacturing. There is a WBS. I need my workshop. I need my foundation. I need my floor mechanism. I need my assembly lines to be done.
There is a problem assembly line. What are the raw materials of my car? From where the doors are coming? From where the engine is coming? Who is assembling the engine? There is a WBS for that. You are breaking down the entire car manufacturing also. See, these management fundamentals are applicable for any methodical step by step of operations. Be it in any field. Even if you are in a software development. This is also called a work breakdown structure. There are different ways of tracking WBS of a software program also.
There is a WBS of client requirement. Then there is a phase of data coding. Then data assembly. Then they start preparing the logical interpretations and the logics of that. Then they try to run that program. Then there are quality checks. Then there are bugs. Then they attack the thing. Then only they further roll out any software on app. I am just giving a vague example. But I am trying to make you explain that work breakdown structure means manageable items and the measurable elements. So these ways are the key things.
Keep in mind that how you are planning and breaking your work breakdown structure. So it is not a big thing. It is just understanding and breaking the things into smaller fragments which are manageable, which are measurable. So now once you do this. So what is the key importance of this WBS? The key importance of this WBS is that how these different fragments are linked with each other. Sometimes they can be standalone. Sometimes they are interdependent. If the level 1 concrete is not done, like in a construction, you can't go to the level 2 slab.
The slab level 2 takes support from the columns of the below floor. Now you can't have a multi-level that there is no level 4 and you are directly constructing the level 24. So really need to track that. So there is an element of dependency between the WBS. Level 1 WBS will get over. Level 2 will get over. Level 2, level 3, level 4, level 5. Then only the structure will over. But finishing activities can be taken up parallel in all the floors. There is a dependency also.
There is independency also. So once you start fragmenting into different structures and different steps, now you need to establish and the dependency between the WBS. Like if you are doing the concreting at a level 4, then only you can de-shutter after 14 days. Then only you can give the below floor for other services and finishes and MEP after 21 or 28 days only. Below floors will be getting having started the finishing and MEP works is started. But level 4 and above you can't start your MEP otherwise because you are still casting that.
So there is a dependency. That dependency you have to start linking. See this is being the first module we are trying to concentrate on the concepts and the fundamental. Making so that in the next modules you start getting grasped on the schedule preparations when you are using a software because as I told developing a fundamental is much more important than understanding the software because softwares keep on upgrading themselves keep on changing with the time somewhere earlier excel was being done people used to do manual then excel came now MS project now Primavera sometime in the long run some Trimavera some other thing will come but your fundamental will remain same you really need to concentrate on that so focus on that develop that concept that you really need to break down your work you really need to start dependency when I can do that work this is called sequencing this is called logical linking of the activity that's why WBS is important then with the WBS of the element you will start utilization of your resources and what are resources now you can say the English word is fine resource means anything which works for you anything which produces some result that's a resource India has natural resources India has huge human resource which can population which can work for it for its growth so there is a resource so what are resources in the project management there are men material machines and money these are the four M's there you understand the three W's when what and where and now there are four M's men material machines and money now based on your WBS based on your logical linking now you need to distribute all these resources okay at what particular time how many men are required I need masonry labors I need concreting labors during foundation at that particular time of the beginning I don't need any labor or any skill set people those who are good in plumbing works the plumbing material workers will come after some six months three months four months based on my schedule so what you are doing so what you are doing you are distributing you are distributing and planning your resources that four M's you are distributing when that particular men are required so you will not get your pipe delivered in advance in the beginning of the project you will not block your money because you need to purchase that material at a later rate so you will need that money later you will spend that money later what particular machine if you are doing a concreting you will need to arrange a concrete pump and then major erection and cranes are required at a later date so you will not brought in any crane in the first day of the project because everything comes with a cost your money is very important so you can't keep on unplanned way of behavior the like what they say if you plan your structure rises if you plan well you should not land into different situation when you remember they call that picture of cheetah and deers running here and where so you need to really distribute and plan your resources your resources needs to be really plan based on this logical linking of the WBS now once these WBS are very much clear to you then definitely the distribution which much more easy now you can say on a manual basis okay it is very easy to say when it comes to complex project then you need a help of the software MSP will find all the resources for you but you for that assignment of software doesn't work on itself self input data to that software is given by the humans like you and me then we have to display that intelligent behavior of common sense so because now it has to be distributed to 10,000 activities that's why I need a software I need a computer to facilitate me but the concept is same and that when I want that that has to very much clearer to you that's why you are just dividing the project of different fragments smaller WBS then started measurable and measuring items on that basis then allocating the resources so that you can distribute plan your resources men material machines and money accordingly so as the definition goes estimating the resources it is an important process that involves determining what resources will be required in terms of labor equipment material what quantity of each resource will be required when the resources will be available to perform project activities the way what I told when what and where it has to be done what has to be done in what quantity when it is required how much quantity is required then you can have e resource management also e means effective resource management is this not that internet e and all sampling e resource management is effective resource management means you can have certain pool of resources so that you can really allocate as per the planning engineer and the project manager and planning in charge like for every tower you might not need a concrete pump and concrete boom placer because if your concrete production is less if your schedule is different way if your concrete production is less and if your concrete requirements and the end rates are you meeting in time definitely with one pump you can plan that depends there is no rule that you really need four pounds for four different towers and sometimes it is required also sometimes even you need to stand by pump also because it's extreme concrete requirements that depends on that so though you really need to plan a central pool of resources so as and when you can allocate those resources here and there this will help us to have the resource leveling also and this will help us to tracking the performance and really avoid idling of the resources our resources are men material and money you should understand that once you are making a logical linking of the WBS and activities you can really track their performance and avoid idling which will really eventually work for your cost management now to summarize all these fundamentals to start begin the planning and scheduling concepts the first week we are trying to concentrate on you to understand the fundamentals so we try to shape up from the change our mindsets from where you are started from a college fresh days how the construction site works how the things are being organized what is called planning why planning is important what are the basic steps steps in the planning so by all this journey of some last one and a half or one hour for 45 minutes you should not get confused that okay planning is a big toughest job it's a rocket science and all it's a suffer tough things to be learned it's nothing that the further subsequent weeks we are trying to simplifying everything for you to just to it so don't get worried that whether it's a rocket science which can't be learned which can't be seen which is very tough intellectuals so mostly this particular phrase is used okay it's so easy it's not a rocket science i'm don't know it's a rocket science so it's what i'd say that planning is a science or an art so what i mostly this particular word is used under negative connotation or some sarcasm so that's not the case that it's not a sarcasm i interpret in a different way i say that to the my people and to share out to the young minds that it is a rocket science like rocket science is very tough rocket science is very complex rocket science involves a lot many things to be understood rocket science requires common sense rocket science require mathematics rocket science require physics rocket science requires knowledge of everything but it is being done also it is being done by the same human our human so it is as not the case that some rare people only do that it's been understood it's a science so it is being done how they are doing it they are doing it intelligently as i stated displaying the intelligent behavior if they have displayed intelligent behavior they have organized the entire steps of the science and made that particular rocket understood they have made that rocket rocket science and rocket can be made efficient or inefficient it's comparative sometimes you are launching and you are not getting successful some people are rocket and making the rocket science using rocket for the upliftment of the humanity some people are using for the detrimental to the society they will have their own wishful interest so that depends upon how efficient and inefficient is very comparative it's again the same as i told it's an application of the common sense what i feel is that planning is rocket science that if even if you build a rocket even whatever steps you keep on doing it all the rockets have a guidance system because sometimes rockets go off the course these guidance systems keep the rockets on the same trajectory when this guidance system fails this rocket goes out of the trajectory z from the earth loses control and the rockets can't be traced and satellites can't be traced but there is a guidance system software technology adapts to emerging conditions and this guidance system retargets itself to the final destination understood this guidance system redirects the rocket into the same trajectory and keeps it whenever the rocket loses its course this guidance system try to make it to the goes to the final destination so planning engineer planning science is the same guidance system under the construction project management so those fundamentals have really need to be developed and thought before entering into the further subsequent weeks where you will be exposed to step by step what are the things as an input you should really understand before getting into the program preparation of any of the software so fundamental steps are be introduced week by week hours by hours to you and we are trying our best to impart you that particular skill set which will help you out to make and more effective plan so what we have learned all this week is what are the basic site operations how the things from the college ends and the project site management are different how that things has to be done what is the switchover in your mindsets you really need to develop what are the key skill sets you really need to attribute and develop and we are taking you step by step towards that that how the things will happen eventually when you come to a site project management then how to determine the success and failure of the project you can remember the time and money Most important, the success and the failure of the project. What is project planning and why is it required? We expose you to the basic steps and that same display of the fundamental display of the intelligent behavior of common sense is really called the planning.
And what are the different steps in the planning which will really make you attribute step-by-step for an effective construction project management which we will be exposing you to at different different week modules so that once you are entering into a scheduled preparation or other phases of the project management, your fundamentals are getting very much clear. We are trying to impart that skills step-by-step to you week-by-week. Next is that what are the basic steps involved in the project planning that how you are planning your resources, what is the strategy, what are the scope of your work, what is your duties, what is your methodology, for whom you are working, what is your work breakdown structure, how you are dividing your framework, how you are dividing that work into manageable items, measurable items, what are the key resource distribution, resources you remember, men, material and money, how we are distributing these resources under the duration of the project, whom to get located.
So these things are getting covered up subsequently very much in detail in the further weeks but you really need to have an idea and concept to be developed in all this first week that you really need to understand what you are targeting for the next 11 weeks. So we have tried to orient you through this that step-by-step what all are the fundamental base preparations for an effective construction project management. I will end by this. Happy learning. Thank you.