What Project Cost Control Is and Why Construction Needs It
A free lesson from Skill-Lync's Project Cost Control course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Week 1 Session 1”
What will you learn in this free Project Cost Control lesson?
The instructor outlines the 12-week course, then defines project cost control and the five factors of a successful project. Examples use a 1 crore project with a 90 lakh budget to show the three processes of estimation, budgeting and monitoring, and the benefits of controlling cost.
- Course plan: 12 weeks, MS Excel only
- Defining project cost control
- Estimation, budgeting and monitoring as three processes
- Benefits of cost control for stakeholders
What comes after lesson 1?
The next free lesson is lesson 2, “Planned vs Actual Cost, Who Controls It, and the Cost Types” (26 min). Later in Skill-Lync's Project Cost Control course (paid): lesson 4, Week 2 Session 1; lesson 5, Week 2 Session 2; lesson 6, Week 2 Session 3. The full course has 38 lessons (17 h 57 min of video); see the course overview or its price and syllabus.
Lesson transcript
Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.
Hello friends. So today we start about introduction on project cost control, which is specifically related to construction industry. And this is the week one. So here we'll be taking you through the introduction of this course. So let's see what's in store for us in the next slides. Here we go. So this is a table of contents of what all we are going to cover in this introductory slide of week one. So number one is introduction to the course. Then number two is what is project cost control and relevance of cost control to construction. What is the importance of the cost control in the construction industry? Like quite important part. It's about like a human body and among the human body, the heart is quite an important and integral part. So hence is cost control to the construction. Without this cost control, construction is like construction business is not viable or for that matter, cost control is very important in all the business fields. No economics, then very difficult to stay. Then we will be covering on who should carry out cost control. Like who are the responsible persons to carry out this cost control in a project? Who are the stakeholders, respective stakeholders? We'll be talking about those.
And finally, we'll be talking about those. And finally, we'll be also be talking on associated costs in a construction project. What are the associated costs or what kind of costs are there in the construction project? Is there some indirect cost? There is some direct cost or there is some design cost or there is any other component of the cost in the construction project? Because a construction project being a very wide subject and a wide area. So there are multi facets to this project, a construction project. And here when we are talking about project cost control, we'll be quite specific about the cost and a basic introduction on this project cost control is being covered in this week one.
So we talk about the learning objective. So we can evaluate the project profit direction. So of course, when we talk about the project cost control, so that means we are keeping the control cost under check and controlling it. So that means if we are doing a business, then of course, the investor who is investing his money wants to earn the profit. Right? Yes. So in order to get the profit, the cost has to be checked and monitored. So that is what we will be able to learn in this objective. That is the first point. Evaluate the project profit direction. Second is check the cost estimates. So we'll be studying on detail on what are the cost estimates in the construction project.
And as a student. And as a student or as a listener, you will be able to understand what the cost estimate means and how you can check them or evaluate the cost estimates. If you are given a cost estimate, you can understand the basics of the cost estimate and you can start to learn from it. Also someday later, you can start to develop the cost estimate by on. Then finally, in this week one, another objective is we can prepare a budget plan and start monitoring it. So budget plan is what is the budget plan? So budget plan, brief introduction. Of course, I'll take you in detail through the next slides. Suppose you have a salary, monthly salary of 1 lakh rupees and you intend to spend only 90,000, 10,000 you want to save for your future.
So then 90,000 becomes your budget. So similarly in a construction project, say if it's a worth of 1 crore for a construction project, then what is the target of the company to spend money? They are earning 1 crore, but how much do they want to spend? Say they want to spend 90 lakhs. So out of this 90 lakhs. So out of this 90 lakhs, they will divide into several categories. So that is the budget. That is how they decided. And once decided, then they ought to monitor it.
So monitoring here is again, like we talk about the cost control or the checking of the cost control. Say once that 90 lakhs is decided, then definitely there will be a breakdown of that 90 lakhs. And then there will be a specific frequency on how we are going to monitor it and how we are going to check it so that it can be reported. So we talk about the introduction to the course. I will just describe some fundamentals. Basically like this project, this course, project cost control is it describes the fundamentals, only the fundamentals of construction project cost control.
And it also provides information on what all costs are involved in the project. From there are the three different stages like number one is estimation, number two is budgeting, and number three is monitoring. So we can have a first hand knowledge and information on all these three stages, which estimation, budgeting, and monitoring. Then this course, as you are a construction professional and as a student, this will definitely help you to hone your skills in managing the cost at a later date when you are assigned or if you are already assigned to a specific job or a company, then you can definitely sharpen your skills and understand the basics of cost.
How do we control the cost? It may sound a complex thing, but once we start doing it, I am sure that your interest will be generated and it is not so complex. It is quite easy and quite simple. So in my further slides, what I have tried to do is make it quite simple for you to understand easily. So we will be covering several topics. However, the five, I have divided all the next week's presentations and next week's sessions into ideally this five main setups. So where and which number one is the cost estimation. So any project, the beginning, beginning of any construction project is with the cost estimation.
Without cost estimation, the bidding cannot happen. And if bidding is not happening, then the award cannot happen. And if award not happening, the project doesn't start off. So what is cost estimation? If we talk about then cost estimation is just the basics and accumulation of all costs, which we can assume and which we can calculate based on the available information. That will be the cost estimation that will be required to spend for the project to execute. So that is cost estimation. Then number two is determination of budget.
So once the project is awarded and then the budget comes into picture. So budget, as I said previously, it's an amount which the company wants to spend actually like it's a pocket money. So if you have your pocket money, then how much you want to save for future and how much you want to spend. So that is the budget. And how do we determine the budget? There are several key factors depending on organization to organization. But certain control points are quite common, which we will be taking you through and guiding you.
Then number three is monitoring and controlling of the costs. So once everything is set up, then a very key and vital aspect is monitoring and controlling. So this is like at a regular frequency, we need to keep checking and handle the cost that if any cost is going upward or any cost is going downward or anything going out of hand. So it's like the project health, the health status we can come to know through this monitoring and controlling. Then another important aspect is the change control system in the project.
So while we execute the construction project, definitely there will be multiple changes coming into the system. And there could be various reasons of this change. But from cost control point of view, how we control this change, how we record these changes and how we convert these changes into money or into our general income or into our savings if we are an investor. Then this change control system is quite imperative and important. And finally, we will be talking about the cost dashboard. So this cost dashboard is nothing but a summary of how we present the cost to all the concerned stakeholders.
So it will include several things. However, it will be covered in the next weeks, future weeks. We can have a look at it. So just to summarize for this slide. So this is like not this week topics, but overall this course topics, which I have introduced to you, cost estimation, budget determination, monitoring and controlling of cost, change control system, and cost dashboard. So little more introduction I will give you about this course. So this will be like a 12 week sessions. And each session will cover one challenge at end of each week.
And also there shall be two projects, one each post six sessions. And very luckily, we don't need any special software for learning this course. Only MS Excel is quite sufficient. And I believe. All of you who are accessing this course will have MS Excel easily available with you. Of course, there are softwares available, but that can be done in another course. But here, my intention is to make you understand about the basics of cost control. So, once again, summarizing. So, there will be total 12-week sessions. And today, we are starting with the week 1. And then, each week, we'll have one challenge. And at the end of each week, for which, that is, which is kind of assignment for you, you have to go through those question marks and then answer those.
So, like this, each week, after every week, you attend, then you have to answer one challenge. And then, there will shall be two projects. So, once the six weeks are over, then one project will be assigned to you. And you will be instructed how many hours you have to spend and what all requirements are there. Then, you have to go through. So, that will help you to understand what you have learned so far. So, I hope you are ready to go. So, let's start with what is project cost control.
So, here, before starting, we talk about a successful project. What a successful project is. So, successful project here, we talk about, of course, a construction project, which is successful. So, success, how do we define success? Starting with this, the basic word, success. We can say, if you are achieving your goal, then you are successful. So, for that success to happen, first thing is required is you need to set up your goal or the target. Then, second, you need to put that effort to go and take step by step, move towards that goal.
And, of course, it will be a time bound. It cannot be an endless goal. So, these three things are quite important in success. Number one is goal. Number two is effort. And number three is the timelines. So, if we talk about a particular project, then we talk about like the target goal, the requirements and the scope of the project are reached. Then, we call it a successful. And other parameters are, like the quality is all acceptable to the stakeholders. We do it with utmost quality consideration. There are no defects to the building or to the project, which we are doing.
Then, the owner is happy and the owner is happy. And the end users are, the building is compatible for all the end users to make it happy and they can utilize it. Then, of course, the timeframe specified the duration in the actual duration is in line with what is the actual specified duration for the project. So, that becomes quite important. It doesn't mean like the specified duration or the goal of any project was 12 months and we are finishing the project in 24 months. So, then, sometimes the market viability of that project finishes.
The business purpose for which the owner had intended that can lost its glory. Quite important this time. And then, fair safe practices are followed without accidents. So, that means the staff and the workers who are working on that project, all the stakeholders, they all are working safely and there is no accident, no untoward wrong practice or unsafe practice being followed. And also, finally, it is completed within the budget. So, what was envisaged? This much cost was envisaged safe. We talk about a 1 crore project and 90 lakh was envisaged. Then, within 90 lakh, the project gets completed.
So, all these parameters are very, very important for a successful project. So, in short, if we talk about the target goal, the quality, timelines, safety aspects, and cost. So, now, we start with the definition of project cost control. So, what it indicates is it's a very, very effective management tool for the project team, this project cost control. So, it's a process of regulating or controlling project operation through the effective use of planning, estimation, budgeting, managing, and controlling. So, various stages are there, but the tool is important.
How we use this as a tool? So, here one more important point what I would like to highlight is there can be many tools available in the market, but it depends on us on how we use that tool. So, if we use that tool wisely, that tool is going to surely help us. But if we use that tool unwisely, maybe that brings more burden on us. So, it's our choice whether how to use that tool. So, in the same way, this course can act as a tool for all of you to understand the project cost control, what it means, the in-depth knowledge of project cost control with planning, estimation, the budget part, the monitoring part, and of course, the controlling and the keeping checks.
So, we can also call it a stepwise guide. So, we can also call it a stepwise guide and a preparation for potential final risks in advance and definitely it saves both time and money. So, there could be several financial risks applicable to a construction project in due course of time which might not be envisaged at the cost estimation or when the project is started. So, project cost control helps to avoid those financial risks or at least makes us aware about the upcoming financial risks during the course so that subsequent action can be taken.
So, it's just like if we see a weather forecast. So, today is it going to rain or not? We are not sure. But if we see the weather forecast and we check, oh, it is going to rain and we want to go outside to the open market like an amphitheater to watch a movie. But the weather forecast indicates there is rain. So, we know the risk is there and all our entertainment could be spoiled. So, we decide, okay, it is better not to go today. In fact, we can go it tomorrow or any other next day.
So, this project cost control is also like that kind of weather forecast. It also helps us to avoid sudden expenditures. There could be some unexpected expenses again like some financial risks. But if we are doing the cost control, then we can easily forecast such sudden expenditures are going to come with the help of management tools and we can avoid incurring waste of money or we can also say in advance information to us on how we can control the risks and how we can manage within the stipulated time.
Coming to another important topic is the importance of project cost control. So, here we talk about like the project health. So, this project health is akin to our health, our human health. So, are we healthy? So, if we don't have any cough, cold or any fever, we are healthy. Of course, healthy or we don't have any serious disease. We are in general healthy. Then, the cost brief or the cost dashboard that will define the project health and the current status and it can give in a single glance.
So, it has like for multifaceted persons, it has many different purposes and meanings. So, here in if we can see like for a contractor who is going to build the project and it is his main business to do the construction, it indicates the profit earned. How much profit is going to earn or is he really going to earn profit or is he going to make a loss or for an investor or an owner is indicates cost overrun or the situation where it is, where the project lies.
So, they have, say as an investor, they have allocated some amount of funds for investing in a particular business and then they have done some calculation of ROI, return on investment. Say, if an investor has planned 1 crore investment and he has calculated some ROI, okay, this 1 crore will give me a viability and he can earn 5 crores out of it over a period of time once we invest this 1 crore. So, this cost brief tells the situation about that to that investor. So, cost brief is also like it gives a snapshot of income versus expenditure, how much is earned and what is the expenses incurred so far, how much is contracted or we can also say spent.
So, here we can just note it down that contracted is how much is spent basically or how much is decided to be spent. Then finally is how much is forecasted based on the current project condition. So, say the project is now 30 days already started and 2% project progress has been there, how much has been spent and for the balance 98%, how much is the forecasted expenditure that is going to happen. So, that is what talks about the cost brief. So, next we talk about the project cost control as a process.
So, claim as a medical reward. What are the sequence and what the process is? Or if we take a simple example like if you love cooking, then what is the tea making process? We gather all the ingredients, we switch on the gas, then we mix them and boil and there are several do's and don'ts for that. So here we talk about the mainly the three processes of the project cost control out of which number first is the estimation. So it's like amalgamation of all the direct and indirect cost that will be required to complete a particular project.
So this is the very first advanced stage from where the project begins. However, the cost estimation once done, it does not guarantee that the project is awarded or we are doing the project. But it's like kind of pre-marketing work which any contractor needs to do or as an investor, we need to estimate how much cost we are going to incur if we are going to execute this project or if we are going to say make this building, then how much cost we are going to incur. So that is cost estimation, a rough cost estimation.
It could be different from different perspective. So someone could be doing a detailed cost estimate like working on all each and every item versus the each particular quantity. Suppose, suppose how much is the earthwork going to happen, how much is the concrete work going to happen, and how much is the electrical work going to happen, how many kilometers of cables are going to be laid for that project, what are the light fittings that are going to be involved, what is the stone that is going to be used for the finishing, how much paint quantity is required, and the unit prices of all those, and how much workers' salary are involved with that. So that forms the direct and indirect costs.
And another aspect, another perspective is, we will work on a lump sum cost, say per square meter cost. Say today the construction cost is say 1,000 rupees per square feet. If we are lucky, of course, now the market is quite volatile. So that depends. So we talk about, say a rough lump sum cost, a ballpark figure, say 1,000 rupees per square feet, or 2,000 rupees per square feet, or we say 800 rupees per square feet for civil construction, and 600 square feet for mechanical and electrical construction, and another 500 square feet for interior finishing, and that depends on the kind of finishing, whether it's a hotel project, or a factory project, or any different kind of project.
So this is how the first process, which we call as cost estimation. Then the second process, part of the process is the budgeting, the cost budgeting. So this is like allocation, and overall cost estimate, to specific work items, in order to establish a performance baseline. So here the key word here is performance baseline. So before we start doing, then we need to set a baseline, that is, what are the key parameters that we are going to take control of, how much are we going to monitor, and how are we going to determine our performance.
It is akin to, like, if we are working in an organization, then what is expected out of it, what is our key result area. So that is that, we talk about the budget. It's quite important, since the money is involved, it is not only the numbers, it may be numbers for the employees, but we need to understand, and that is the most basic thing, that it is money for someone, it is quite important. Then the last part of this process is monitoring, or controlling the changes, or the anomalies, in what is happening in the project budget.
Say, what we have allocated in the beginning, is it sufficient, or is it exceeding, or is it getting shortened, and what actions are required to take for this. So, summarizing, three key words, remember, estimation, budgeting, and monitoring, or controlling. Then we talk about the benefits arising out of project cost control. So, very, very clear. So, this cost control, I don't think I need to explain much on this. So, it aids in cost reduction, and it brings an efficiency in the system, thereby, creates a profit. If the cost is controlled nicely and well, then, of course, the profit is there in the project.
And it also ensures that the project is completed within the approved budget and the timelines. It's not only about money. So, if it is also related to time. So, if the project gets exceeded, then, of course, the cost is, like, directly proportional to time, in terms of staff salaries, or in terms of market price escalations, everything will increase if the time increases. So, that is why cost is directly proportional to time. So, the most important point is, like, the efficiency of the system. So, cost control determines that.
Further, the cost control, as explained previously, it's a tool that supports a construction project manager. So, that could be from the contractor side, or from the investor side, or from the owner side, or from the project management consultancy side. So, it helps to everyone. So, there is, like, all the stakeholders, all, say, with the owners, or the contractors, or the PMC, or the consultants, they should have a clear understanding of their role. Then, control scope creep as a result of customer's transparency. One should be able to track the progress and take corrective action as soon as possible.
Also, the PM needs to maintain the project's planned margin, maximize ROI, which is return on investment, and prevent losing money. And, very, very important, it also helps to create a data. So, this data can be used as a standard for the future projects. So, if a similar, such similar project happens in the near future, then we can use this kind of data, what happened in this project, and it can serve as a history for other junior members and the upcoming team members. So, we can definitely have a look at it, and so many benefits arise out of this project cost control.
So, this is how, what we have learned so far, what is project cost control. So, the importance of it, what is meant by project cost control, and the key processes with estimation, budgeting, and monitoring. I will be repeating these terms again and again, so that is why, what I want is that, I want you to keep in mind all these three terms, and what is quite important, estimation, budgeting, and monitoring. Thank you.