BIM Characteristics, Parametric Modeling and Common Data Environment
A free lesson from Skill-Lync's BIM in AEC Industry using Revit course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Week 1 Session 1 Part 2”
What will you learn in this free BIM in AEC Industry using Revit lesson?
The lesson describes the waste, delays and poor coordination in conventional construction with many trade partners. It explains parametric modeling as the solution, then covers the common data environment, the employer's information requirements and the BIM execution plan.
- Problems of conventional construction coordination
- Parametric modeling with rules like height and width
- Common data environment such as BIM 360
- EIR and BIM execution plan roles
What comes after lesson 2?
The next free lesson is lesson 3, “BIM Project Lifecycle, Clash Detection and Information Requirements” (42 min). Later in Skill-Lync's BIM in AEC Industry using Revit course (paid): lesson 4, Week 1 Session 2 Part 2; lesson 5, Week 2 Session 1; lesson 6, Week 2 Session 2 Part 1. The full course has 37 lessons (18 h 6 min of video); see the course overview or its price and syllabus.
Lesson transcript
Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.
The PIM characteristics, in normal case, so there will be a lot of free work, there will be poor communication difficulties, and disconnected work flow, the material wastage will be huge, as I mentioned earlier, so sometimes different trade partners are involved in the construction process, so the thing is, in many cases, even in our locality also we have seen, right, so while constructing a small house itself, so first these masonry people will come and create a superstructure, once it's done, so whoever is doing the plumbing, they will come and they will make some changes, and sometimes they drill a hole in the beam itself, and it will completely affect the structure, so all these things, and the material wastage, and because of that there will be a lot of delay, if this is the case for a small house, so then just think about a multi-storey building, so there will be n number of trade partners, include for each and every purpose, like for the plumping, for duct work, for the interior beautification, and for the structure, and for all the structural related work, so all the steel related work, so different trade partners will be there, and because of this, there will be huge, without the use of building information modeling technology, there will be huge wastage, and there will be delay, and there will be chances for the duplication of things, like like sometimes we need to, so sometimes people will do the same task again and again, so these kind of issues will be very common, so these things are, these common things, so there is a solution for this, that is parametric modeling, and so we have, so we have, we already mentioned it, so if you do the parametric modeling, so we can see everything prior to the construction, and we can make any changes in the beam model, and we can show that to the people, whoever is involved, for example, for example, if we need to take an, if we need to construct a flat, if you want to change something, like some beam, you want to change, right, so you need to call, so site engineer should be there, contractor should be there, and the senior engineer should be there, and the manager should be there, so the whoever is done the design, so all these people should come to the site, right, if the beam process is not used, then these, all these people should come to the site, and to see, they will spend some amount of time for the discussion, and all, then once, so some, in most of the cases, what is the, the scenario is, the scenario is, the beam, or like, the structure will already be constructed at the site, then after a certain point of time, only if the people will realize, okay, these structures should not be here, because it will create a clash with the mechanical duct, so then, these different category people, so they need to come to the site, right, so we need to, for the, for the manager, for the, for the manager, and for the site engineer, and like, for the senior people, we need to pay a certain amount of money, right, so for spending that much time over there, so these, these will lead to a huge loss, right, so these are, and all have happened, if we need to have a mismanagement of disk system, if must have a role model, this is going to happen, if we have a problem, so if we have a beam process involved, all these things, we can see at the modelling stage, at the modelling stage, so now if we implement something in the modelling stage, so we can result of those things, by a male, so no need to, people need to come to come to the site, or else we can take a different snapshot shorts and we can share with the people. So there is no reliable or and poor quality information is the biggest obstacle in the conventional practice. The parametric modeling reduces all these ways. So as I mentioned, like if we have everything in a model, so we can reduce time for the rework, communication, poor communication, we can resolve the workflow. So we can follow a proper workflow and the material wastage won't be there. And delays, delays because we with this BIM, we are planning, okay, so at this date, we need to finish this much. All these things are planning very prior to the construction. So delays won't be there. Duplication efforts. So sometimes the column or like these are very common at the site, right stairs, those, those kind of duplication effort won't be there. The working in a collaborative common data environment breaks the like fragmented work silos. So usually the people are working in silos like architect, the whole design engineer who he or she will complete his or her task and given to some other person. So in that state, then there might be a miscommunication. So because of that, there might be chances of errors.
So these kinds of things can be avoided once we use BIM. So BIM manufacturing and construction industry. So this is a case study, like what they usually do is they create a hybrid model. So if you want to create a big structure, they create a hybrid model. And like, if the small, if we create something like that, so small, small detailing doing small, small detailing would be really difficult task. So physical modeling is really difficult. So if you need to build a 10 feet tall building, so uh, uh, what you usually do is, uh, so physical mockup will create and we, uh, so people need to construct that two times, right? So small physical mock, uh, physical model need to be created. And then again, it's, we need to duplicate that at the site. So if you, if you look at this, so this, then the small detailing and all would be really difficult to do it. And we need to spend a lot more time to create this physical model. Then comes the virtual, like, uh, uh, then, uh, so we followed something from the manufacturing industry. So in the manufacturing industry, like, uh, so certain products and offers, uh, create, uh, in virtually, then, uh, uh, go to the site and like, then, uh, go to the factory and then, uh, recreated it, right? And same concept is used in the construction industry as well. First, uh, it's create digitally or virtually, then it's, uh, create physically on, uh, physically on the site. Okay. So this, uh, helps in the normal process, uh, increase of, uh, offside construction practices and, uh, so modular construction and then the free back fabrication, all these trends are happened after, after this process. So all the things like modular construction, all the parts are created at different locations and different factories, and even the free fabrications of steel structures and all these happen. So these, uh, things helps, uh, the construction industry really well to, uh, uh, finish the construction process on time. So for example, uh, if you take the countries like, uh, US, UK and other foreign countries, they have the climate, uh, like, uh, so they won't get, uh, enough time for the construction process. So they usually uses the modular construction prefabrication process. So because, because of that, they can, um, construct or like complete the construction on time countries like Canada and all like there, the climate is really cold. So people won't be able to work all that, uh, like in their 365 days. So what people usually do is like they create each modular structure at the factory itself, then they will export that to site and they will just go and fix everything at the site. So sometimes they use, uh, construct, uh, or the footing columns and everything and even the walls and all. So in interior partition, And even the bathroom units, all these things construct at the factory level. Then at this site, they will come and install at the site at no time. So because of this, the construction process is really fast and the errors are really less. So manual errors will be really less because all these things are done at the factory by machines.
So the, all the dimension, everything will be accurate, errors are less, less. Then the lows are, lows is less. The time, we can save a lot of time. So all these benefits are there. So for example, like if we implement BIM, so for example, if you see the ability to influence course. So first, in the initial process, in the start of the project. So in the x-axis, you can see the project time and in the y-axis, you can see the level of influence on the course.
Okay. So initial investment course is really high because for the conceptual planning and the feasibility studies and all because it's a new technology, people will take time to study everything and progress in the design and engineering stage. And even the procurement and the construction stage. The cost will decrease. And once it's reached the startup and the operation and at the maintenance stage, the cost will reduce. Okay. So, but in the other case, like if you see here, the initial normal construction cost will increase. So if you go with the normal process, in the normal process, initial study and initial planning and all is not there.
But in that case, what will happen is the initial investment is really less. But later on, once it's progressed, the cost will be really high. So it's always better to go with the first option. So there initially, we need to spend a certain amount of money. Later, it will be really helpful for us to save a lot of amount like in the operation and maintenance stage, like we don't need to spend that much amount of money. Okay. So what is and what is not? So in this here, we'll explain what is BIM and what is not.
Okay. So model with only 3D data or and no object attributes is not a BIM. And model with no support of behavior is not a BIM. And the model that does not reflect the changes made in one view on the other view is not a BIM. Okay. So for example, in the AutoCAD, so if I make any changes in the plan view, so if all are lines, right, it won't reflect anywhere, right, it won't change in the schedule, it won't make any change in the 3D view.
So because of that, it is a two dimension. So that is what is mentioning model only with the 3D data and no object attributes is not a BIM. And the model with no support of behavior is not a BIM. The model that does not reflect the changes made in one view on the other views. So if I make any changes in the plan view, it won't reflect in the 3D view. So that is also not BIM. So here, if you see here, so if I add a new step over here, it won't reflect here, right? So if I make any changes in this 2D plan, it won't show that particular change in the elevation view.
So that is what I was mentioning here. So this is a door from SketchUp. So here, even here also, you can see the 3D model, but the data, so no object attributes will be there. So this is also not BIM. Okay. So this is what BIM is. So when I select something, so all the information related to, so the 3D data is there. So object attributes is there. Model with support behavior, like all these things are available and model. So if we make any changes, right, if I make some changes here, it will automatically changes in all the hundred other locations.
And if I move this, when this door in the plan view, we can see the same in the 3D view and same in the elevation view. And it will automatically changes. It will automatically reflect in the wall. All these information. So these are interrelated. And the other data is there. Object attributes are there. We can see everything on 3D. So this is what is BIM. So basically, nowadays in the construction industry, what people are following is like, there will be a set of construction documents is there. Contract drawing is there.
So with that, with the help of these, they created BIM model. Okay. Usually what should happen is, first we need to create a BIM model. From that BIM model, we need to create construction documents and we need to create contract drawings. But the reverse is there. Because of this, we need to create a new model. We need to create a new model. We need to create a new model. So here the 3D model does not act as a central repository of information. okay so here uh since if these information are flowing in the reverse direction this is called zero bim so actually the information for uh like flow in the reverse direction from this bim model we need to create contract drawings we need to create schedule we need to create quantities of those things should come from the bim model so this is a 3d model with that we can extract elevation and views drawings and schedules estimate and quantities so here the 3d model act as a central repository of information with this we are creating all these information this is what is bim so uses and significance uh so bim can have different uses it is utilized in a way what is practical and beneficial to the project so there are certain downstream uses of bim model so it can be used for the design process estimating scheduling and for coordination and clash resolution so uh so with this model we can estimate like how many doors we need for the project how many uh panels or how many cupboards are needed and uh like how much quantity of cement we need how much quantity of brick number of bricks are needed and the scheduling at this particular date how much percentage of work we can complete so with the help of drawn and also people usually set a drawn at the site and with that with the help of dawn like practice like people who are inserting at the different office fees so they can easily see what is happening at this site and all those things are available possible coordination and clash resolution so different trade partners are there um so there'll be structural architectural mechanical plumping and like electrical trade partners will be there and so if any trade is clashing each other they will do a clash run and so if some clashes are there so they will inform all the trade partners and they will make the adjustment with the coordination meeting and all so virtual mock-up uh so are possible like uh waterproofing all this quantity takeoff as i mentioned earlier how much amount how much amount of steel like uh and then cement sand all these things things then we ask build verification documentation and facility management once uh once uh the building construction is done so the facility management and team enter into the process and they what they will do is they will uh check the facilities available so if there are some issues with the uh with the fan or like with the duct after the construction of 10 years also so these facility with the facility management with the help of facility management team so the whoever is uh so they can just with a one click they will get all the information related Doctor like or a fan which is not functioning. So one person, one single person is not doing this entire task. So different people are involved in different tasks like so there will be a team for design, there will be a team for estimation and there will be a team for scheduling and for the facility management.
So there will be different team for each task. One person can't do all these tasks alone. So there will be different team. So this is a collaborative effort, not a single person or like it's a collaborative effort. And there is, because of different platforms are available, they can collaborate easily and they can share the information easily. And there will be a BIM execution plan and the employer's information requirement will be there. And these things will outline the process information and purpose on the BIM usage. So this, regarding this BIM execution plan and like EIR, I will explain later.
So, the BIM characteristic core concept is bi-directional associativity and the parametric relationship bi-directional associativity as I already mentioned earlier. So, if I move my door in a wall, the dimension of the wall will also change and the location of the door will also change. Parent component, to that only we are adding particular element or family. So if I change something, some element's location, it will automatically reflect in the parent location where that particular element is resting. So, the parametric relationship, so the parametric relationship, as I mentioned earlier, so we can see like if I change any parametric value like length, height or width for a particular door, it will automatically reflect in all the other locations.
Like if we have 1000 doors, it will automatically reflect there and the parametric rule, we can set it. So, for example, if we need to create a window family or something, so we can create a parametric set as I mentioned earlier. So, width we can give the height is two times the width or like those kind of rules that also we can create. So, these are the core concept and the key characteristics, BIM is a processor technology used in architecture, engineering and construction with the help of different softwares.
And the central focus is on 3D BIM model which carries all the information related to the project. So, the information either it would be graphical, non-graphical and documentation, like all these informations are there. All the documents related to project are stored in common data environment with proper naming convention. So, most commonly used common data environment is Autodesk BIM 360. So, there are different folder structures are there, different naming conventions are there, with all, like if a number of rate partners are associated with their project. So, all these people will come and use the same naming convention.
Starts on the employer's information requirement, like that is called EIR, throughout the different stages of project life cycle. So, employers like all the requirements, the level of detail, like how much, all the material detail, all the other details of these elements employer need to share at each stage. BIM execution plan, BIM execution plan, with the help of BIM execution plan, describe the goal, so intent and the deliverable of the BIM implementation in a project, for example. So, how we need to share the file, like who all are involved in this, roles and responsibility of each BIM engineer, BIM manager, and like BIM lead, BIM coordinator, all these things will be clearly mentioned in the BIM execution plan, then how we need to share the file or the file format and the completion date and like standard of each file, all those things will be mentioned in the BIM execution plan.
So, different BIM collaboration format for file exchange, file structure and nomenclature will be specified in the BIM execution plan. Okay, thank you. With this, we completed all the basic things. We will be continuing in the next part. Thank you. Thank you.