Introduction to PLC
Notes written by Skill-Lync from the recording · Updated 17 Nov 2026
What this workshop covers
This PLC and SCADA workshop explains industrial automation architecture, Modbus, IEC 61850 and OPC protocols, SCADA functions and ladder logic basics.
Despite the title, most of this two-part Skill-Lync recording from May 2020 is about SCADA, taught by an instructor who works on plant automation projects. Part 1 covers the building blocks (PLC, RTU, HMI, communication network), alarm levels, response time, sequence of events, data storage and historians, OPC DA versus OPC UA, cloud links and cybersecurity.
Part 2 compares Modbus RTU and Modbus TCP, explains redundant primary and secondary SCADA servers, and walks through a plant architecture from field sensors and remote I/O to PLCs, ring networks, a firewall PC and the cloud. PLC programming itself starts only in the last third of part 2: IEC 61131 languages, normally open and closed contacts, I/O addressing, timers and counters. It suits electrical and instrumentation students who want to know how a plant control system fits together. It is not a hands-on PLC programming class: there is no software demo, and the ladder examples are brief.
Chapters
Part 1
- 0:00 SCADA history, vendors and the post-2000 security shift
- 2:37 Building blocks: PLC, RTU, HMI and communication
- 5:11 Communication layers and industries that use SCADA
- 6:45 Alarm levels and SCADA response time by protocol
- 8:22 Sequence of events, protocol support and gateways
- 10:18 Data storage, trends and reports
- 13:13 Third-party connectivity: OPC DA vs OPC UA
- 16:54 Web client, cloud, cybersecurity and historian server
- 20:57 Digital and analog signals, RTUs, data mapping, control
Part 2
- 0:00 Where SCADA is used: a cold-storage example
- 2:52 Modbus RTU vs Modbus TCP: distance and speed
- 4:47 IEC 61850 and IEC 60870-5-104 for substations
- 5:25 Redundant primary and secondary SCADA servers
- 8:15 Plant architecture: field devices to PLC and firewall
- 11:23 Ring networks, devices per network and Profibus
- 14:06 Why the engineering station stays separate
- 15:06 Ladder logic: lamp timer example and IEC 61131
- 20:00 Timers and counters and where plants use them
Key points from the session
- A SCADA system combines PLCs, RTUs, HMIs and a communication network. An HMI is a touch screen with limited storage that suits a small plant; SCADA adds alarms, events, reports, trends and OPC integration. RTUs add GPRS, remote monitoring and data storage and report to state and regional load dispatch centres over IEC 60870-5-101/104.
- Alarms are set in stages from the equipment maker's limit. The instructor's example is a mill rated for 5 mm vibration: alarm at 3 mm, high alarm at 4 mm, and high-high with a trip at 5 mm.
- Display response depends on the protocol: the instructor cites about 3-4 s for Modbus RTU, 1-2 s for Modbus TCP and milliseconds for IEC 61850. Sequence-of-events time stamps let you see which of many devices tripped first, which matters most in thermal and nuclear plants.
- The instructor's working limits: Modbus RTU runs up to about 1.2 km at a slow 19.2 kbps, while Modbus TCP runs no more than 100 m per segment at 100 Mbps. Every protocol gateway adds delay, for example stretching a 1 s update to 1.2-1.3 s.
- OPC DA is not secure, OPC UA is encrypted. Third-party links go through a dedicated PC with two network cards behind a firewall, so an intruder stops at that PC. Critical control stays local, and only report and trend data goes to the cloud.
- For seven or eight operator stations, use two servers and several clients rather than one server per station. Only the primary server stores data; the secondary takes over if it fails. Keep the PLC engineering station separate so operators cannot change logic or bypass safety features.
- IEC 61131 defines ladder logic, function block diagram, sequential function chart, instruction list and structured text; the instructor says ladder and FBD cover most plant work. An on-delay timer staggers the start of large 6-10 MW motors so the load step does not trip the plant, and an off-delay timer lets a drive trip a few seconds after a fault instead of instantly.
What is the difference between a PLC and SCADA?
A PLC is the controller that reads field inputs such as limit switches and 4-20 mA signals and drives outputs through its I/O modules. SCADA sits above one or more PLCs and RTUs, collecting their data for operator screens, alarms, sequence of events, trends, reports and remote access. A small plant may use just a PLC with an HMI.
Why does the instructor prefer OPC UA over OPC DA?
OPC DA, the older interface used to share data with third parties, has no built-in security. OPC UA is an open protocol with encryption, and both ends must be defined so no other party can interfere. Even so, the instructor routes third-party links through a dedicated firewall PC with separate internal and external network cards.
Which PLC programming language should a beginner learn first?
Ladder logic, then function block diagrams. Both are IEC 61131 languages, and the instructor estimates they cover about 95% of plant programs because they need no C or Pascal background. Ladder uses normally open and normally closed contacts and output coils, with timers such as TON, TOF and RTO and up or down counters.
Where to go next
Who should watch
For Electrical Engineers
A 17 May 2020 workshop recording from Skill-Lync on ELECTRICAL. For a structured course with projects on this topic, see Skill-Lync's electrical engineering courses.