Wiring harness routing & packaging Rules Week 3 Challenge
PROCEDURE:
P clamp:
1) Create 2 point as entry and exit points.
2)create the planes on the points.
3)create the plane which is 2 mm offset from the base surface of the P clamp.
4) define the support part for both side of the p clamp.

Back shell:
1) Create the point on the back shell connecting point as well as bundle connection point.
2) Create the plane for the back shell connecting point.
3)Define the back shell connecting point.
4)Define the bundle connection point.

Slit COT
1) Open the catalog document work bench.
2) Create the catalog family as "slit COT" with the type of CONDUITS and save it
3)Create the corrugated tubes with different outside diameter using electrical product work bench.
4) Save and store the file into the "Slit COT" catalog.
