Challenge

Week 9 - Project - A pillar Design with Master Section

ISOMETRIC VIEW

SLIDE VIEW

FRONT VIEW

TOP VIEW

DRAFT ANALYSIS

STEP 1 INSERT > ANALYSIS> FEATURE TO DRAFT ANALYSIS

STEP 2 ENSURE THE MATERIAL SELECTION

DRAFT ANAYSIS ON CLOSED B0DY

A SURFACE AND B SURFACE ARE CLEARING AT 2.9 DEGREE DRAFTING BUT C SURFACE ARE CLEARING THAT EXPLAIN AT BELOW DIAGRAM

THE C SURFACE IS CREATE BY REFERENCE SURFACE IN SWEEO AT ANGLE OF 93 ALSO INCREASE AND DECREASE THE DEGREE BUT DRAFT ANALYSIS NOT CLEARING AT SPECIFIC GEOMETRY

DRAFT ANALYSIS FOR DOG HOUSE

DRAFT ANALYSIS MADE BY MAIN TOOLING AXIS FIR DOG HOUSE USING BISECTING LINE AND SLIDE CORE ARE CLEARING AT 0.45 DEGREE

FINAL SOLID PART

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.