Week 9-Creation of 1D Connectors Challenge
W-9-Creation of 1D Connectors Challenge
AIM: To mesh the given mid-surface of the assembly and create 1-d connectors as directed.
PROCEDURE:
FIRST STEP:
- Surface meshing was done on the given assembly.

SECOND STEP:
After clearing quality, the following connections are created.
- Right_Rail_2 & Front_truss_1:- Seam-Quad(angled+capped+L)
- Left_Rail_2 & Front_truss_1:- Quad elements
- Front_truss_2, Front_truss_1 & Right_Rail_1:- Spot weld with 2 Layers and 5 mm Diameter
- Front_truss_2, Front_truss_1 & Left_Rail_1:- Hexa (Adhesive)
- Rear_truss_2 & Right_Rail_2:- Bolt Connector
- Rear_truss_2 & Left_Rail_2:- Bolt Connector
- Right_Rail_1 & Right_Rail_2:- Spot-weld with Rigid Elements
- Left_Rail_1 & Left_Rail_2:- Spot-weld with Spring Elements
9.Relief plate& Front Truss_1& Front Truss-2- Quad elements
RESULTS:
