Challenge

Week 9 - Challenge 3 - Bumper

Bumper Project

  1. Bumper input received as STP file, and checked styling surface all gap properly closed or not
  2. And checked fusibility check mold of tooling direction X direction it is fusible,
  3. Then offset 3 mm A class surface to crate B class surface,
  4. While offsetting 3 mm some patches are created in B class surface, all patches are corrected in proper way,
  5. After completing of B class creation, i created C class surface,
  6. All A & B,C joining created single surface, and provided thicken option as a solid body created
  7. After that checked tolling feasibility with tooling direction it clering without having any error
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.