Challenge

Week 7 - Mid-term Project - Natural Convection

  1. Aim

To design a low voltage control panel, as per the given specifications, and perform thermal analysis of the same.A high-current LV busbar system should be considered as a multiconductor transmission line.

2. Objective of the project

The objectives of the project is:-

  • Build the model as per the provided information.
  • Mesh the model with non-conformal meshing.
  • Solve the problem for natural convection.

Please have a look at the attached sheet for analysis.