DESIGN OF CLAMP UNIT INTRODUCTION A Clamp unit is a unit designed to clamp/hold the car panel with NC blocks/ Mylars/ Rest by using a pneumatic clamp cylinder. The parts of clamp unit are: Rest block /Mylar L - block Shim / spacer Blade or Adapter plate Riser. Clamp Arm Pneumatic cylinder FUNDAMENTAL OF CLAMP UNIT: Take…
Mujahidoddin Saudagar
updated on 08 Feb 2024
DESIGN OF CLAMP UNIT
INTRODUCTION
A Clamp unit is a unit designed to clamp/hold the car panel with NC blocks/ Mylars/ Rest by using a pneumatic clamp cylinder.
The parts of clamp unit are:
FUNDAMENTAL OF CLAMP UNIT:
CONSTRUCTION OF REST BLOCK:
OBJECTIVE
The objective of the current project is to design and model two types of rest unit and three types of clamp units along with clamp arm, clamp cylinders, blocks, shims, blade and riser in CATIA software.
DESIGN METHODOLOGY
CONCLUSION:
The clamp unit with different Rest blocks, risers, clamp arms and clamp cylinders are modeled and designed in the CATIA software. If the company has some standards it is advised to use that standard for the rest blocks. It si advised to use as many as standard parts so it will be easier for the manufacturer to fabricate the fixture.
Leave a comment
Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.
Other comments...
Project 2
Purpose- 1)Initiate a concept of Fixture design. 2) Perform 3D finish on the Assembly design 3) Perform 2D finish with output documentation 4) Write a Detailed Report describing the process (what changes are made on the design) and attach relevant images. Answer - 1) Fixture concept design- A fixture…
26 Mar 2024 06:20 AM IST
Week 12:- Documentation Challenge
AIM: To create the BOM and Hardware list(BOP) for the complete Fixture assembly. BOM : (Bill Of Material) A bill of materials – BOM – is the full list of every item necessary to build a product. It enumerates all parts, assemblies, subassemblies, raw materials, and components that building the product…
23 Mar 2024 08:21 AM IST
Week 12- Final project
Aim: In this project we create the door trim panel Components that is (Lower substract,Arm rest, Bottle holder, map pocket) with the necessary input surfaces provided and generating the necessary B side features ( heat stakes, 4 way locators, Dog houses, push clips, Ribs, screw bosses etc) thereby assemble the individual…
22 Mar 2024 10:26 AM IST
Week 11:- 2D Detailing Challenge 2
OBJECTIVES: To Create 2D Drawing for each Clamp Units with all child parts and also create Child pard drawing for the same for the Fixture assembly To Create 2D Drawing for each Pin Units with all child parts and also create Child pard drawing for the same for the Fixture assembly CLAMP UNIT …
20 Mar 2024 08:28 AM IST