Week 4 Challenge
Challenge:-4
QUESTION:-1
Calculate dead load in design report based on IS code and apply dead load on the model
- Finishes of 50mm
- Slab as per design
- Brickwall 150mm thickness
- Roofing load based on purlin size
- Ceiling loading 0f 0.3KN per sq m
ANSWER:-
- Load Calculations:
- Dead Load of 1.2 `(Kn)/m^2`
- Finishes = 50mm`times`24`(Kn)/m^3`=1.2`(Kn)/m^2`
- Brickwall Load = 0.15`times`20`times`5.2 = 15.6`(Kn)/m^2`(Ground to Intermediate Floor)
- Brickwall Load = 0.15`times`20`times`6.8 = 20.4`(Kn)/m^2`(Intermediate to Roof Floor)
- Brickwall Load = 0.15`times`20`times`4.8 = 14.4`(Kn)/m^2`(Roof to Top Floor)
- Roof Load = 1.5 `(Kn)/m`
- Ceiling Load = 0.3 `(Kn)/m`
- Open the TEKLA and add the different loads in load cases tab, as shown below.

- Next we have to added the load combinations, as shown below.

- Next we have to add the Finishes loads to Ground floor upto the Roof level, as shown below.


- Next we have to add the Brickwall loads and Ceiling loads to Ground floor upto the Roof level, as shown below.
- Finally, we have to add the Roof load, as shown below.

QUESTION:-2
Calculate live load in design report based on IS code and apply live load on the model
- Assume the loading based on IS 875
- Roof loading
- Consider equipment loading as 5KN per sq m
ANSWER:-
- Based on the IS 875 the live loads are applied, as follows.
- Workshop = 5`(Kn)/m^2`
- Staircase = 5`(Kn)/m^2`
- Corridor = 5`(Kn)/m^2`
- Meeting Room = 5`(Kn)/m^2`
- Store Room = 5`(Kn)/m^2`
- Toilet = 2`(Kn)/m^2`
- Canteen = 3`(Kn)/m^2`
- Office Room = 3`(Kn)/m^2`
- Conference Room = 5`(Kn)/m^2`
- Equipment Room = 10`(Kn)/m^2`
- Rest Room = 2`(Kn)/m^2`
- Administration Room = 5`(Kn)/m^2`
- The Live loads are applied for all the floors, as shown below.

QUESTION:-3
Generate a calculation for 5T crane loading based on following inputs
- Centre to Centre of wheel = 10m
- Weight of crab = 40 KN
- Number of wheels = 4
- Wheel base = 2m
ANSWER:-