Week 12:Project-1-Meshing of Door Inner Panel Challenge

Objective: Mesh the plastic component and assign the thickness. Procedure 1-Import the geometry and geometry cleanup. 2-Trim the geometry in to four equal parts. 3- Defeature the surface fillet (defeature-surfs fillets) 4-Generate the mid surface and extend the features till base (surface edit- extend)   5-Mesh the…

    Project Details

    Loading...

    Leave a comment

    Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.

    Please  login to add a comment

    Other comments...

    No comments yet!
    Be the first to add a comment

    Read more Projects by Veerendra kumar (18)

    Assignment 4-RADIOSS Material Laws Challenge

    Objective:

    Objective To carry out the simulation of all 7 cases and compare the results in terms of mass error, energy error, run time, total no of cycles and types of failure using animation. The cases are as follows- Case-1.Based on Law2- base simulation- [using ‘FAILURE_JOHNSON_0000.rad’ file] Case-2. Based on Law2-…

    calendar

    28 Mar 2023 07:20 PM IST

    • RADIOSS
    Read more

    Assignment 3-2D Element Formulation Challenge

    Objective:

    Objective The objective of this assignment is to compare the simulation with default value and the recommended values and figure out in the changes in energy and force. Steps 1. Run time were change to 55 ms [Model- cards-ENG_RUN] 2. Set the number of animation steps during simulation to min. 25 and frequency =1 [Model-…

    calendar

    10 Mar 2023 10:01 PM IST

      Read more

      Assignment 1-2D Meshing Challenge

      Objective:

      Part-1 Procedure 1 Import the geometry 2 Geometry clean-up  Toggle edges Edge edit-replace line Surface ruled Deleting surfaces Surface edit-trim with line- with lines (surfs- surf edges) 3 Mid surface extraction with offset option. 4 set the quality criteria 5 clean-up the mid surface- Remove the pin holes Toggle…

      calendar

      03 Jul 2022 03:03 PM IST

        Read more

        Week 12:Project 2-Meshing of Rear Wheel Holder challenge

        Objective:

        Objective- To mesh the rear wheel holder after creating mid surface. Remove the quality failure and assign the thickness to the component. Procedure- 1. Import the geometry and geometry clean-up. 2. Create mid surface and geometry clean-up. 3. Set the quality parameter. 3.1. Mesh the component and remove the quality failure.…

        calendar

        07 Jan 2022 02:59 PM IST

          Read more

          Week 12:Project-1-Meshing of Door Inner Panel Challenge

          Objective:

          Objective: Mesh the plastic component and assign the thickness. Procedure 1-Import the geometry and geometry cleanup. 2-Trim the geometry in to four equal parts. 3- Defeature the surface fillet (defeature-surfs fillets) 4-Generate the mid surface and extend the features till base (surface edit- extend)   5-Mesh the…

          calendar

          27 Dec 2021 01:51 PM IST

            Read more

            Week 9-Creation of 1D Connectors Challenge

            Objective:

            Week 9 challenge (frame_assembly_welding) Objective To connect the components with different types of connectors like seam weld, spot weld, adhesives, bolt etc. Procedure A. Mesh the components and clear the quality as per quality criteria. B. Connect the components using following connectors. 1-Seam-quad (angled+capped+L)…

            calendar

            26 Oct 2021 03:24 AM IST

              Read more

              Week 8-3D Tetra Meshing Challenge

              Objective:

              Objective (Housing Model) Create 2 D tria mesh and clear the quality. Generate 3-D tetra mesh with 2-D tria mesh. Check and remove the tet collapse quality failure. Procedure (Housing Model) 1.Delete the solid part of housing. 2.Remove the sharp edges and very close line (distance less than 2mm). 3.Mesh the geometry with…

              calendar

              17 Oct 2021 05:02 AM IST

                Read more

                Week 6-Meshing of Hood Challenge

                Objective:

                week 6 challange (hood) following steps are used to complete this challange 1. Import the geometry. 2. Delete the solid. 3. Extract the mid surface of inner, outer panel, latch and hinge reinforcements of hood (geometry- midsurface). 4. Auto clean the geometry (geometry- autocleanup) using offset planes option. 5. Create…

                calendar

                01 Aug 2021 11:46 AM IST

                  Read more

                  Week - 8 - Morphing

                  Objective:

                  Model-1 1-  Geometry cleanup using (face-topo) in topo module. 2- Create the new morph box using (Boxes- new) in the morph deck. 3- Move the grid along the local axis created by right-click at the edge of morph box. 4-Split the morph box and move the grids (Boxes-Split) . So that very minute change in the direction…

                  calendar

                  15 Jun 2021 11:09 AM IST

                    Read more

                    Project - 2 - Meshing on the suspension Assembly

                    Objective:

                    https://drive.google.com/file/d/1yIw-zQcpY4sKmKJrmjDF9oYNNqyDDKJ-/view?usp=sharing Steps 1-After the geometry cleanup, I set the quality criteria for rim and tyre. 2-Manually mesh the tyre and rim with combination of tia and ortho tria. whereas, some quality issues are remaining in the rim.  3-Before volume definition…

                    calendar

                    14 Jun 2021 06:38 PM IST

                    Read more

                    Week 4-1D Element Creation Challenge

                    Objective:

                    Steps  1.Import the geometry and create mid surface in separate component (geometry- midsurface) 2.Create washer splits (offset value-5mm) at the holes and mesh the components using automesh having elements size 5mm (2D-automesh). Number of elements was change with left or right clicks. 3(a).assign the material (MAT-1)…

                    calendar

                    14 Jun 2021 03:16 PM IST

                      Read more

                      Tool Test-2

                      Objective:

                      Tool test-2 (Intake Manifold) I took 6 hr and 30 min to complete this tool test. 1- shell mesh with considering  quality min length-1 mm and max length-5mm    2- In volume mesh quality criteria was taken as collapse -0.3    

                      calendar

                      10 May 2021 07:21 PM IST

                        Read more

                        Tool Test 1

                        Objective:

                        Tool test 1(Switch panel) I took 20 hour to complete swich panel tool test   Tool test 1 (component) I took 15 hours to complete component tool test            

                        calendar

                        07 May 2021 09:12 PM IST

                          Read more

                          Project 1

                          Objective:

                          https://drive.google.com/file/d/1hQpDlGIH_l9H8Hd6npfj3_gWhSgu0tkM/view?usp=sharing Steps 1. first of all I did topo the geometry 2. cleanup the geometry after topo 3. check the geometry thichness and do manual mid surface extraction. mid surface was extracted from the sides having less feature and set the different…

                          calendar

                          03 Feb 2021 12:47 AM IST

                            Read more

                            Week 6

                            Objective:

                            steps involved in rear door connections 1. Different PIDs were given to different parts of rear door 2. Create a bolt connections in the hinge joint- create a COG point, then convert 3D point into bolt and connect the parts using bolt connection in the connection manager. 3. also connect the hinge joint using RBE2 and…

                            calendar

                            01 Dec 2020 09:14 PM IST

                              Read more

                              Week 5

                              Objective:

                              Steps to complete challange 5 1. geometry cleanup after topo 2. saparate all four parts of geometry and stored as a lock view 3. set the quality criteria as per challange average length-1 min. length-0.5 max. length-2 4. mesh the elements with combiation of tria and ortho trias. ortho tria were prefered for curved portion…

                              calendar

                              16 Nov 2020 06:21 PM IST

                                Read more

                                Week 4

                                Objective:

                                steps for completing challange  1. topo of parent surface  2. geometry cleanup of parent surface 3. mid surface extraction 4. grometry cleanup of mid surface  5. apply different thicknesses in the property 6. again geometry cleanup after appling thickness to the mid surface 7.set the quality criteria …

                                calendar

                                01 Nov 2020 09:05 PM IST

                                  Read more

                                  Week 3

                                  Objective:

                                  first of all i did geometry cleanup, then create mid-surface with the help of offset option in the face module. after that i agin did geomety cleanup of mid surface and check the quality of mid sur then assign the thickness. before  meshing, i set the quality criteria. then i did meshing and remove the off elements…

                                  calendar

                                  28 Sep 2020 04:12 PM IST

                                    Read more