Week 12 Challenge
AIM-:
1)What is difference in active and passive earth pressure.
Design a well foundation for the pier.
Assume concrete grade to be M 35 and design the section.
Sbc for pier well – 80 tonn/ m2 . decide depth of foundation as per design
ANS-:

DESIGN EXCEL FILE IS SUBMITTED