Challenge

Week 11 - Final project

REPORT.

procedure followed.

  • first each part is created separately according to the master section.
  • later engineering features are created on the parts.
  • parts are assembled using constraints.

TREE STRUCTURE.

draft analysis.

draft analysis is done for the map pocket in which we found more red region in the y direction as compared to normal to the surface so the tooling direction is taken as normal to the surface.

in the closed body, we found some red regions because the input surface has some negative draft.

draft analysis of engineering features in the armrest shows positive draft results.

closed bodies.

product assembly.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.