Week 10 - Challenge 3 - Door Trim Lower with Engineering Features
AIM
Create the Heat Stakes and the locators considering the design rules mentioned in the video for the door applique.
DESIGN RULES GIVEN
-
Heat staking and Locators created. Heat staking points given in Class A
PROCEDURE
Create B Surface for given A surface
Offset the A surface and Extract surface and extrapolate the surface
And Trim the surface.After edge fillet to be followed
Create C surface by using A SURFACE
Create Boundary and sweep the boundary with Reference of class A surface
Join the CLASS A & CLASS C SURFACE
Finally Trim the CLASS B & CLASS A&C JOIN
Create Locators
create a sketch and extrude the sketch and thickening the surface
And Union Trim the Main body
create Heat staking in Given Class A Surface with in 16 points
Extrude the circle and ASSEMBLE MAIN BODY
Before that need to give draft for all body
Finally Edge fillet to be use in sharp corners
Draft Analysis to be followed in CLASS A , FINAL OUTPUT
GUIDELINES
TREE STRUCTURE
CONSTRUCTION ELEMENTS
PART BODY
PUBLICATIONS
DRAFT ANALYSIS
CLASS A
TOOLING AXIS
CLASS B
CLASS C
CLASS A&C
FINAL TRIM
Locators
Heat Staking
FINAL BODY
VIEWS
ISOMETRIC VIEW
FRONT VIEW
SIDE VIEW
TOP VIEW
BOTTOM VIEW
RESULT
Thus the "C" is where the doghouse contacts the backside of the surface to be completed with Final part Draft analysis