Week 1 Challenge
1.Aim: create a new project using file menu and name it accordingly
Commands used:
File menu
Open
Procedure:
open the revit software
click on the file menu
click on new and then to project
select the construction template
select the browser option and name the project
Result: Following templates will be created by above procedure
2.Aim: Save the new project file,close and open the file using the icons from toolbar
Commands used:
File
Save
Nameof the project
Procedure:
click on the file menu
click on the save button
specify the path where we want to save it
name the project and click on save
Result: The following project will be saved
3.Aim:create a rectangular wall of 40*35
Commands used:
file
wall
Procedure:
open the revit software
click on the file and then on new project
select the template as constructional
select the walls option and specify the first point and type 40 in x direction
place the courser in y direction and type 35 enter
place the courser in the direction and 40 enter
place the courser in the direction and 35 enter walls is created
Result:
4.Aim:Do the dimension using the aligned tool bar
Comands used:
Annotate
Aligned
Procedure:
select the level 1 tab
select the annotate tab and then click on aligned option
select the end of one wall to another and click enter dimension is done
Result:
5.Aim: Switch to different wall types using properties browser
Commands used:
properties on the ribbon wall
Procedure:
srelect the wall in the 3D view
properties will appear in the top ribbon bar
select the type of wall we want from the option
Result:
6.Aim:create a 3D view from view tool bar and save the view
commands used:
view
3D
save
rename command
Procedure:
select the 3D view in the view tool bar
right click on the ucs bar and there is a option save view
Result:
7.Aim:navigate through the 3D model using view cube
Commands used:
view
navigation wheel
Procedure:
select the 3d view
click on the navigation wheel
select the view in which direction we want to see
select the drag button and move the object in any direction to see the object in 360 view
select the pan also to see in the direction which we want
Result:
8.Aim:Use the visibility settings option below to switch model to shared,realistic,hidden lines options
Commands used:
visibility
options
Procedure:
select the 3d view option and press enter
At the bottom there is an option visual style click on that and switch to the shade which you want
Result:
9.Aim:Turn the sunlight on and off to shadings in the layout created
Commands used:
manage
additional setting
Procedure:
select the manage from the ribbon bar
select the additional setting and select the solar study and presets
click ok at the end
or go to the bottom and select the sunpath or the currect setting or the specified setting
Result:
10.Aim: Use the manage tool bar to enter project settings,project name and project issue date
Commands used:
manage tool
project information
Procedure:
select the manage tool
go to the project information bar
give the details of the project name and issue date etc
Result:
11.A)Analyse tool bar is the tool which helps to combine the different loads in the structure,load combination, boundry conditions,etc. it is used to analyze the structure with all the different loads applied in the object with gives the analysis report as the result. it helps to detect the load failure in the structure.
these are the options in the analyze tool bar
12.A) Links that revit supports are:
Link revit
Link IFC
Link topography
Link CAD
These are the links supported by revit software
13.A) Collobarate in revit is a cloud based service which allows any revit user inside and out side the network to collobate on the revit model.many users can work undersame plan or drawing which makles the work more efficient and productivity is more as many people can work under one project nd time is reduced in completing the project.