Week 1 Challenge

1) Create a design summary report (DSR) for the following items for any highway you are aware of in your region. Mention the highway name, and location: -

  1. Category/Class of the road - NH 161BB (National highway)
  2. Design speed of the road - 100 kmph
  3. Terrain classification - Plain terrain
  4. Travel Lane width - 3.5*2 (Carriageway) +1.5*2 (PS)+1*2 (ES)
  5. Typical min. cross slope - (2.5%)
  6. Horizontal curve radius without superelevation - (minimum 400m radius)

2 What is the typical roadway project life cycle workflow? List out in points. What is the typical roadway design workflow? Also, list out all the experts needed on a roadway project.

Project workflow: 

  1. Design summary report
  2. Topographical survey
  3. Typical cross section
  4. Geometric design (Horizontal and vertical)
  5. Superelevation design
  6. Plan set

Experts needed on a roadway project:

  1. Surveyor
  2. Roadway (Highway design engineer)
  3. Structures (Structure design engineer)
  4. Drainage (Drainage design engineer)
  5. Utility engineer
  6. Traffic and pavement design engineer

3. What are the important geometrical parameters of a horizontal alignment and vertical profile? When is a vertical curve needed? 

Parameters for Horizontal alignment:

  1. Design speed
  2. Type of terrain
  3. Horizontal curve radius
  4. Super elevation
  5. Camber
  6. Transition length

Parameters for Vertical alignment:

  1. Vertical curve length
  2. Sight distance
  3. Gradient

Need of vertical curve: The vertical curve is need when the vertical alingment is changed from one gradient to another gradient.

List the formula with a diagram for vertical curve. List all types of vertical curves with the diagrams : submitted in separate as file attached

When is superelevation necessary: To prevent skidding of the vehicle passing through the horizontal curve super elevation is need to be provided the diagram of the suoer elevation is given in separate file is attached.

5. List out the typical set of submission needed for a roadway project.

  1. Key sheet
  2. Horizontal alignment report
  3. Vertical alignment report
  4. Super elevation report
  5. Plan and profile drawings
  6. Typical cross sections
  7. Summary of quantities
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.