Challenge

Usage of Navigation tool , Timeliner and Clash Detection test using Naviswork

1) From file go to export then NWC then go to destination folder of system then creat new folder then rename it as nevisworks then file name orf architechture and save go to structural file then save.

2)  open nevisworks then open the NWC file (architechture) then go inside the building then view point and walk then save and rename animated vedio as living room then walk inside click on pan tool to change appearence and walk inside room then click stop the vedio recording. then play the vedio go to export animated and format then go to multiple animation and ok in destination folder.

3) same process as above then go to realism third person then person appear then save then rename vedio realism then walk click on pan and start re cording save as human then export recording vedio.

4) embaded architechture and structural file 

a) append then go to structural file and open go to third person then clash detective then add test then name demo test go to architectural then surface option then run test

clash-I received 1stfloor

clash-VI active then ground floor

clash-x resolved

5) open nevisworks then lime liner from selection tree go to ground floor room seperation casework add task name ground floor clashwork planned date planned end actual start actual end. 

rename column clashwork planned date planned end actual start actual end.

simulate play animated vedio as per schedule.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.