Challenge

Usage of Navigation tool , Timeliner and Clash Detection test using Naviswork

1.

  • TheRevit filw which is to be exported to the Naviswork file is to be opened with help of file icon
  • Click File-select NWC and open the naviswork
  • Open dialogue box select NWC extension and click ok
  • Revit file opened and then we manage the components in Naviswork and perform necessary changes

2.

  • Open arch file which we want to export to naviswork
  • Click on viewpoint tool and save.
  • Select walk option and use cursor to select where we want to walk 
  • Now with the help of walk tool we can move to this desired position where we wish to change the design 
  • With help of record option, we record the walk

3.

  • OPen the Naviswork file and then click viewpoint tool
  • Save the viewpoint
  • Click the Realistic option and select third person option
  • Select walk option and use the cursor to select where to start
  • Move the view with the help of arrows
  • Use record option and record the walk

4.

  • load and open structure and open arch files so we can staet clash test
  • Go to home and select Clash Detective and box appearsb)
  • Add test option
  • Select files

     c)

  •      Clashes can be approves , these clashes will not appear anymore. it turns into green colour once we click approves 
  •  

d)

  • Clashes will not cause any disturbance to the project can be neglected

e)

  • Clashes can be resolved which can change
  • s model boundary condition

f)

  • once we change all the clashes we can save it sent for review

g)

  • We can annotate and save the places where clashes are visible and is viewed personally and rectified by design engineer.

5.

  •  Open Naviswork and click timeliner tool , dialog box appears
  • Select components by clicking the selection tree and add them to timelinear
  • Then click on add the first work,we can add actual and planned start and end dates,We can select task type
  • Once we fill details in timeliner click simulate option
  • The simulation begins and we can see the construction from starting date to the ending date

 Due to some technical error naviswork is not visible

I have tired a lot according to the video

But it fails so I am not attaching my files only the procedure to do that

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.