REVIT_ Scheduling & Estimation_Week 9
QUESTION 1)
Use the shortcut keys in Revit discussed in class to complete the following tasks and list them below
a. Using 3D model create a section box
b. To create similar doors and windows in a floor plan layout
c. To reduce the thickness of lines visible in plan views
d. To apply override settings to a floor in the model section view
e. To increase the range of visibility in a plan view
f. To select the previously selected items
g. To add annotations to the model views
h. To bring the model elements in line
i. To rotate the model elements
j. To move an object to another location
k. To copy a model element
l. To mirror an element about an axis
m. To create an array of model elements
ANS 1)
The shortcut keys for the above mentioned tasks are :
a. Using 3D model create a section box = BX
b. To create similar doors and windows in a floor plan layout = CS
c. To reduce the thickness of lines visible in plan views = TL
d. To apply override settings to a floor in the model section view = EOD
e. To increase the range of visibility in a plan view = VR
f. To select the previously selected items = CTRL + <- ( CONTROL PLUS LEFT ARROW)
g. To add annotations to the model views = DI
h. To bring the model elements in line = AL
i. To rotate the model elements = RO
j. To move an object to another location = MV
k. To copy a model element = CO
l. To mirror an element about an axis = MM
m. To create an array of model elements = AR
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
QUESTION 2 ) Using Revit and the project used from week 6 to 8 prepare a schedule for the following
a. Walls
b. Doors
c. Windows
d. Material – Concrete/Wood
ANS 2)
AIM : To prepare a schedule of the project from week 6 to 8 linke walls, doors, windows and materials-concrete/wood.
TOOLS USED :
- View.
- Schedule.
- Schedule properties.
- Schedule quantities.
PROCEDURE :
- Open the arctitectural template which we have used for our week 6-8 week project.
- Click on the view tab.

- Select schedule quantities option from the view tab.

- Select all the components like doors, walls, windows and materials-concrete/wood.

- Next schedule tab dialog box will appear select the componets which we want to display in the schedules.
RESULT :
With the help of above steps we can prepare a schedule including components like doors, windows, walls and materials.


-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
QUESTION 3) Using Revit Calculate area and volume of each room in the model with appropriate room tags applied to each room. Prepare a schedule report for area and volume of each room.
ANS 3)
AIM : We have to create areas and volume for each room using revit and assign appropriate room tags to each room. To prepare a schedule for each room area and volume.
TOOLS USED :
- View.
- Schedules.
- Schedule properties.
- Schedule quantities.
PROCEDURE :
- Open the architectural template which we have used for week 6-8 of the project.
- Go to the view tab.
- Select schedules option from the view tab.

- The schedule dialog box appears.
- Select the paraments require like area, volume etc.

- Then click on ok option.

- Then we can obtain the room are and volume schedule.
RESULT :
With the help of the above steps we can calculate the room area and volume parameters with appropriate room tags and prepare a schedule of it.

-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
QUESTION 4)
Using the same schedule using the unit cost rate for materials available in the internet, prepare total cost of materials used in the project
a. Total Cost of Materials
b. Individual Material Take off
ANS 4)
AIM : With the help of schedules we have to create the unit cost rate for materials avaliable in the internet used in the project.
TOOLS USED :
- View.
- Schedule.
- Schedule properties.
- Schedule quantities.
- Material takeoff.
PROCEDURE :
- Open the architectural template which we have used for week 6-8 of the project.
- Go to the view tab.
- Select schedules option from the view tab.

- The schedule dialog box appears.
- Now select material takeoff option and click on ok.

- Select the required parameters.
- Create a cost column and calculate the total cost.
RESULT :
We can create schedule regarding the unit cost of the materials avaliable in the project.


-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
QUESTION 5) Using the concept of Visual Programming discussed in class, list a flowchart for the following scenario
a. How to decide framings for a structure using Dynamo ?
b. If there is no water coming from the pipes
c. If request for money from client has been declined for the project
ANS 5)
a.How to decide framings for a structure using Dynamo

b.If there is no water coming from the pipes

c.If request for money from client has been declined for the project

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
QUESTION 6) List the parameters associated with each model element
a. Wall
b. Floor
c. Door
d. Window
e. Table
f. Building
ANS 6)
- a) WALLS :
- Type of wall.
- Length of wall.
- Width of wall.
- Height of wall.
- Cost estimate for wall.
- Thickness of wall.
- Material used for the wall.
- b) FLOOR :
- Type of floor.
- Length of floor.
- Width of floor.
- Area of floor.
- Volume of floor.
- Cost of floor.
- Thickness of floor.
- c) DOOR :
- Height of door.
- Width of door.
- Length of door.
- Thickness of door.
- Material.
- Type of door.
- d) WINDOW :
- Height of window.
- Width of window.
- Length of window.
- Thickness of window.
- Material.
- Type of window.
- e) TABLE :
- Length of table.
- Width of table.
- Height of table.
- Material of table.
- Type of table.
- Purpose of table.
- f) BUILDING :
- Height of building.
- Type of building.
- Length of building.
- Width of buuilding.
- No:of floors.
- Area of building.
- Set back of building.
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------