Reinforcement detailing of Columns from ETABS output
AIM: Reinforcement detailing of columns in Etabs 2018.
INTRODUCTION:
The ETABS file for a G+4 building is provided. Run the analysis and design the RCC Moment Resisting Frame. The following challenge deals specifically with two columns at the following grid intersections.
- 3A
- 3B
- Provide details of longitudinal reinforcement for the two columns, from foundation to terrace level. Sketch the column cross-sectional & elevation details or draft it using AutoCAD software.
- Show shear reinforcement & lapping details as per the special confining reinforcement provision of clause 8.1 of IS 13920 - 2016.
PROCEDURE:
- Given the document opened, select the 3A and 3B columns, unhide the remaining things,
- run the analysis and check the reinforcement details for both main reinforcement as well shear reinforcement,
- choose the values and check the story height to help fully of in drawing of auto cad,
- after seeing the results reinforcement required calculated manually,
- the manual calculations are drawn in the auto cad in detail,
- for both 3A and 3B main reinforcement and shear reinforcement designed.
- and the minimum area of steel used comfortably.
- 3A Main reinforcement quantity.
- 3A shear reinforcement quantity.
2. 3B Main reinforcement quantity.
2.3B Shear reinforcement quantity.
1.3A Main reinforcement and shear reinforcement detailing
1.3B Main reinforcement and shear reinforcement detailing
- Lo not less than:-
- large column dimension
- 1/6 of clear span of column
- 450mm
it satisfy 650mm size
b. confinement spacing not moe than
- 1/4 of smaller column dimension
- 6times dia. of column main bar
- 100mm
it satisfy100mm size.
c. the amount of confinement rebar
Ash= maxi of [0.18 sv h fck/fy(Ag/Ak -1)]
[ 0.05 sv h fck/fy]
it satisfy169 mm2