AIM:
Design, Analysis & Preparation of construction drawings. The architectural drawings of a G+3 RCC building as per the given above data.
PROCEDURE:-
- Open new file in ETABS software
- setting units as metrics E
- edit the grids and story setting as per the dimension of the above plan


- Set the story-1 as the master story

Define material:
- Go to define tab > material Property
- Set th material properties for concrete as M25 and rebar as Fe415



Slab Material:

- Assigning the load patterns
- take walls as super dead and earthquake load as seismic load

- Assign the load combination

- Draw the beams, columns and slabs




- Assign the shell load as uniform and set the live load as 2KN/m^2


- Assigning frame loads of dead load as 3.5KN/m^2

- Select the slab and provide the diaphragms







- Longitudinal reinforcement details of the building


- designing the footing of the building with pie cap
- For thet we need to for theslab property and name as pile cap and select type as mat and thickness 800mm
- Set the stiffness for the columns as the thickness of 900mm

- now we need to provide piles
BEAM :
| Beam 14 | Right end | Center | Left End |
|---|---|---|---|
| Bottom Reinforcement required | 672 | 605 | 609 |
| Dia of bar | 20 | 20 | 20 |
| NO. Of bar | 2.14 | 1.926 | 1.939 |
| Bttom Reinforcement provide at Top | 675 | 605 | 605 |
| 1#24+2#24 extra is provide | 2#20 is Provide | 2#20 is provide |


Coloum Design:


Importing the software SAFE
- Go to file click on export and select the safe V12fk.
- A tab will appear then click on the story as base and select the loads and loads from above click on the combination click ok,
- Go to SAFE 22 and to file click import and select the file and save the file as FDB.
- Go to display click on the show loads select dead above and love above the values will be appeared.
- Given data: column of sizes :- 450 x 600 mm & 600mm x 450mm
Pile has a load carring capacity of 280KN
Pile lenght-16m and dia of pile - 500mm
SBC -150 KN/m^2
Solution:
- Number of piles = Total Axial load/pile capacity = (1.5DL +1.5LL)/280 = numbers
- Piles in the spring are defined as spring so far that the spring constant K = EA/L E = 5000 (fck) ^0.5 = 5000 (25) ^0.5= 25000 N/mm^2 Area of pile = 22/7 x d^2 = 3.142 x (500)^2/4 = 196375 m^2 L - 10000m k = 25000 x 0.7855 /16 = 306835.9N/mm = 419.
- Spacing of the piles as per clause number 6.6.2 of IS 2911 the spacing between the piles =2.5dia of the piles = 2.5 x 500 = 1250mm
- Now in the next step we have to define the material properties for go to defined and define the material propertes of concterte and reinforcement properties Fe500 & Fe415.
- Select the values.
- Go to defined section propertie of concrete and define pile caps, pile Dia, and column
- Add new, defined pile cap pile 500 as MAT , and Column as Stiff.
- Click on the quick draw around the plots a window will open there insert the column sizes and these











RESULT:-
As per the given mersurments and reuirements modelling and designing using the SAFE and ETABS software has been done.