Project 1- Traffic Jam Assistant Feature
Ans-> Traffic jam assistant feature :-
Make the SLDD first from the given data :-

Start designing the model blocks -
1) Primary block :-

2) Inside subsystem 1(named - Traffic jam assistant feature) , 2 more subsystems have to be created named Requirement 1 and Requirement 2 respectively.

3) As per the given Requirements, design the subsystems.
Subsystem 1- Requirements 1 :-

Subsystem 2 - Requirements 2 :-

4) Resolve the signals, Save the model and Run it.
The model advisor report is shown, it consists no errors :-

The code generated files and the model advisor report is attached.