Project 1
FINAL PROJECT 1
IN THIS CHALLENGE WE HAVE TO PREPARE FOR THE WIRNG HARNESS AND ROUTING PAKAGING FOR THE ENGINE HARENESS FIRST WE NEED TO SELECT THE PROPER CONNECTOR AND CLIPS AND MOUNTING CLAMPS HERE I HAVE CHOOSED FOR THE TWO POLE CONNECTOR AND FOUR POLE CONNECTOR THREE POLE CONNECT AND TEMPERATURE CENSOR TO ASSEMBLE THE ELECTRIC WIRING HARENESS AFTER CHOOSING ALL THIS WE NEED ORIENT THE ALL THE CONNECTOR WITH PROPER LOCATION AND TWO POLE CONNECTOR AND L CLAMP ALSO FOR THAT ASSEMBLY FUNCTION WE HAVE TO GO IN THE ASSEMBLY WORK BENCH IN THIS BENCH WE HAVE TO ASSEMBLE ALL THE CONNECTOR IN PROPER LOCATION AFTER ASSEMBLED ALL THE CONNECTOR HAVE TO DEFINED AS THE ELECTRICAL PART EXAMPLE BOTTOM CHANEL P CLAMP AND TWO POLE CONNECTOR AND FOUR POLE CONNECTOR ALL ALSO DEFINED AS THE ELECTRICAL PART THEN ONLY IT CAN ROUTE OTHER WISE WILL NOT ROUTE THE ELECTRICAL HARENESS ASSMEBLY AFTER ELECTRICAL DEFINED ALL THE PARTS NEED TO ARRANGE IN THE PROPER ORDER.AFTER WE HAVE TO USE THE WROK BENCH ELECTRICAL HARENESS ASSEMBLY TO USE ROUTNING PROCESS.


