Challenge

Modelling of 25 storey building with the specified properties using ETABS

AIM :-

  • To model a 25 storey building on ETABS with given structural properties.
  • To check if the translational fundamental natural period of vibration in both the x and y direction is approximate, Tx1 = 4.4 seconds Ty1 = 4.2 seconds.
  • To check if the provision in Table 5 of IS 1893 (part 1) – 2016, on torsional irregularity is satisfied.
  • To check if the two provisions of clause 7 in Table 6 (shown below) of IS 1893 (part 1) – 2016, regarding vertical irregularity is satisfied.
  • To check if provision on inter-storey drift limitations in clause 7.11.1.1 is satisfied.

GIVEN :-

  • Ground floor or plinth floor level is at a height of 1.5 metres from the base.
  • Each of the successive 25 storeys has a storey height of 3 metres.
  • Buildings are assumed to be pinned at the base.
  • All columns in all storeys are of the same size.
  • All beams in all storeys are of the same size.
  • The building is located on Soil type-II and in Zone-III.

Structural Element Sizes :-

  • Beams : 300 × 400 mm
  • Columns : 800 × 800 mm
  • Slab : 150 mm thick

Material Properties :-

  • Grade of Concrete : M30
  • Grade of Steel Reinforcement Bars : Fe 415

Loads :-

  • Dead Load on beams from infill wall = 10 kN/m (Assume the same for roof floor in view of parapet)
  • Live load on floor = 3 kN/m2 (Assume the same for roof floor)

PROCEDURE :-

Step 1 :-

  • Open the ETAB software and click on "New Model".

  • "Model initialization" dialogue box will open.
  • Go to the "built-in settings with" option and change the different options as "Select Display unit > Metric SI", "Steel section database > Indian", "Steel design code > IS 800:2007", "Concrete design code > IS 456:2000"

Step 2 :- Creating grids and storeys

  • "New Model Quick Template" dialogue box will open.
  • Check the "Custom Grid Spacing" and click on "Edit Grid data".

  • The "Grid System Data" dialogue box will open.
  • Check on the "Display grid data as ordinates" option and provide the grid's data as given in the question and then click "OK".

  • Now check the "Custom Story Data" and click on "Edit Story data".
  • The "Story Data" dialogue box will open.
  • Click on Story 1and rename it as "Plinth Level" and give plinth level height as 1.5m.
  • Click on Story 2 and rename it as "Storey 1" and give storey height as 3m.
  • Again click Story 3 and rename it as "Storey 2" and give storey height as 3m.
  • Again click Story 4 and rename it as "Storey 3" and give storey height as 3m.

  • Now Right-click in the window and select "add story" and Select "Keep Existing Story Height".
  • The "Add Story" dialogue box will open.
  • Fill in the required data as per the question requirements.

  • Click "OK" and rename all other storeys.

  • The following result will shown :-

Step 3 :- Adding Materials

  • Close all viewports and select Plan view and on "Storey 1" viewport on the window.
  • To select the material, Go to the "define" tab and Select "Material Properties".
  • Click on "Add new material". Select Region as "India", Material Type as "Concrete", Standard as "Indian" and Grade as "M30" and then click "OK".

  • The "Material Property Data" dialogue box will open.

  • Check the Data as per requirement or modify it accordingly.
  • Click "Modify Material Property Design Data" and Select "Lightweight concrete".

  • Click "OK". The concrete material is added.
  • Again go to add material and add the rebar for longitudinal reinforcement.

  • Provide the data requirement and then click "OK".
  • Similarly, add the shear reinforcement.
  • Provide "grade 415" for shear reinforcement.

  • Click "OK".

Step 4 :- Adding Columns, Beams and Slabs

  • For beam, Go to the "Define" tab and Select "Section properties Select" and then click on "Frame sections".

  • Click on "Add New Property".
  • Select "Rectangular concrete".

  • Change Property name to "B-300 X 400"
  • Provide Material "M30" and give dimensions as "Depth = 400" and "Width = 300".

  • Select "Modify rebar" and fill in the data as per requirement.

  • Go to properties modifier and change the "MOI about the axes to 0.35" as per IS 1893 ( Part1): 2016 clause no 6.4.3.1.

  • Click "OK" and the beam is added.
  • Now, add another element "Column" by Clicking on "Add new property".
  • Select "Rectangular concrete", Rename Property name as "C-800 X 800", provide Material "M30" and give section dimension as "Depth = 800" and "Width = 800".

  • Select "Modify rebar" and Fill in the data as per requirement.

  • Go to "Properties Modifier" and change the "MOI about the axes to 0.70" as per IS 1893 ( Part1): 2016 clause no 6.4.3.1.

  • Click "Ok" and the column is added.
  • Now for Slab, Go to the "define" tab and Select "Section properties" then Select the "Slab section".
  • Click on "Add New Property".

  • Change Property name as "Slab 150", Slab material as "M30" and Modeling type as "Membrane" and provide the thickness of slab as 150mm.

  • Click "OK" and the Slab is added.

Step 5 :- Drawing Columns, Beams and Slabs

Drawing Columns :-

  • Go to the Plan view of Story 1 and select the "All story" option at the bottom.
  • Take the "Quick Draw Column" command and select the column "C-800 X 800".

  • Provide the columns, by clicking on all the intersection points of grids.

  • Check the final result in the 3D view as well.

Drawing Beams :-

  • Again open the first story plan view and select the "All story" option at the bottom.
  • Go to the "Quick Draw Beam" command and Select Beam "B- 300 x 400".

  • Click on all grid lines in between columns to provide the beams.

  • Check the final result in the 3D view as well.

Drawing Slabs :-

  • Again open the first story plan view and select the "Similar story" option at the bottom.
  • Click on the "Quick Draw Floor" command and Select Slab "Slab 150".

  • Now click in between grids where the slab is to be provided.

  • Check the final result in the 3D view as well.

Step 6 :- Adding Support

  • The building is assumed to be pinned at the base.
  • For assigning pinned support, go to plan view and select "Base plan".
  • Select the "One Story" option at the bottom.
  • Select all the joints and then click on the "Assign" tab and Select "Joints" then Select "Restraints" and Select the base as "Pinned".

  • Click "Apply" and then click "OK".

Step 7 :- Adding Load Pattern

  • Click on the "Define" tab and select "Load patterns"
  • Add different loads i.e., Dead load, Live load, Infill wall load, Earthquake load in both principal directions and Earthquake load with eccentricity in both principal directions.

  • Select "Eqx" load and click on "Modify Lateral Load".
  • Fill in all the factors as per the conditions given in the question.

  • Then click "OK".
  • Now Select "Eqx+" load and click on "Modify Lateral Load".
  • Provide Eccentric Ratio as "5%" and all other parameters are the same.

  • Similarly, modify all the lateral load and click "OK".

Step 8 :- Assigning Loads to Structural Members

Assigning Live Load to Floors :-

  • Open the "Storey 1" plan view and select the "Similar story" option at the bottom.
  • Select all the shells and then go to the "Assign" tab, then select "Shell loads", and click on "Uniform".

  • Give the value of live load as per question requirement.

  • Perspective view :-

Assigning Infill Walls Load to Beams :-

  • Go to the "Select" tab and click on "Object type".

  • Now Click on "Beams" and then click "Select"

  • All the beams are selected and for assurance check the bottom left corner.
  • Now go to the "Assign" tab and select "Frame Loads" and then "Distributed".

  • Select "Infill Walls" as the load pattern name and give the value of "10 kN/m" in the uniform load section.

  • Click "OK" and then click "Close".

  • Perspective view :-

Step 9 :- Assigning the Mass Source

  • Go to the "Define" tab and Select "Mass Source".

  • Select the "Modify/Show mass source" option.

  • Define the Seismic mass as per the code and then click "OK".

Step 10 :- Generating the Load combinations

  • Go to the "Define" tab and Select "Load Combination".

  • Click on "Add Default Design Combos".
  • Check the "Concrete Frame Design" and "Convert to User Combinations" box and then click "OK".

.

  • The load combinations are generated. Click "OK".

Step 11 :- Assigning the Diaphragm to the Floor

  • Go to the "Select" tab and click on "Object type".
  • Now Click on "Floors" and then click "Select" and then click on "Close".

  • Now go to the "Assign" tab Select "Shell" and then Click on "Diaphragm".

  • "Shell Assignment - Diaphragm" dialogue box will open.
  • Select "D1" and click on "Apply" and then click "OK". The diaphragms are applied.

  • Check the final result in the 3D view as well.

Step 12 :- Defining Modal Cases

  • Go to the "Define" tab and Click on "Modal Cases".
  • Click on "Modify/Show Cases" and set the maximum number of modes as per choice.

Step 13 :- Checking Model

  • Go to the "Analyze" tab and click on the "Check the Model" option.
  • Select all the checks which are required to be checked and then click "OK".

  • If "No Warning" arise then the model is ready for analysis.

Step 14 :- Run Analysis

  • After checking, click on the "Run Analysis" Icon or press the "F5" function key.

Step 15 :- Checking Deflection

  • Click on the "Show Deformed Shapes" icon or press the "F6" function key.
  • The "Deformed Shape" dialogue box will open, select the load for which the deflection is required and then click on apply.

Step 16 :- Checking Base Reactions

  • Go to the "Display" tab and select "Show Table".

  • Select the "Base Reaction" Table and then press "OK".

Step 17 :- Checking Modal Results

  • Go to the "Display" tab and select "Show Table".

  • Select the "Model Participating Mass Ratio" Table and then press "OK".

  • From the table, the time periods,

Tx1 = 7.046 seconds and Ty1 = 6.79 seconds.

  • The mass participation ratios for first three modes are noted as follow :-

Tx1 = 0.8125

Tx2 = 0.1833

  • By summing the three mode mass ratios, we are getting Tx1 + Tx2 = 0.995, which means the first two modes of seismic oscillation contribute more than 65% of building weight as per ETABS analysis. Thus, the code requirement is satisfied.

Storey Response Plot :-

Modal Periods and Frequencies :-

  • Go to the "Display" tab and select "Show Table".
  • Select the "Modal periods and frequencies" Table and then press "OK".

  • From the table, the time periods,

Tx1 = 7.046 seconds and Ty1 = 6.79 seconds.

RESULT :-

  • The 25-storey building has been modelled and analyzed on ETABS with the structural properties and load conditions provided in the questions.
  • The requested data are verified as per Indian seismic standards.
  • The time period separation of at least 10% is not achieved in the given practice.
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.