Introduction to National Building Code and Steps in a Construction project
1.the building codes is essential for the modeling in revit, because-
a set of standards that are uniform to all structures
it protects the construction safety
modern construction methods
provides building standards.
2.the groups are-
GroupA: residential buildings , GroupB:educational buildings , Group C: assembly buildings, Group D : institutional buildings, GroupE: mercantile buildings, Group F:business buildings, Group G: storage buildings , Group H: industrial buildings, Group J: hazardous buildings .
3.the steps are-
initiation
plannings
execution
closure
4. the different disciplines involved in construction of a project are-
construction, finance and estimating, contracts and bid , geotechnical , managements, structural, surveying.
5.a)four unit apartments- group A:residential buildings.
b)school with capacity of 1000students- groupB: educational buildings.
c) a single unit shop- group E:mercantile.
d)multi story shopping complex- group E:mercantile
e)steel machine factory- groupH: industrial buildings.
6. design team:
helps to finalise the plan
evaluationaries in the project
implementation the designs
management team:
accomplishment of project
execute the design
achieves the satisfactory completion of the project.