Identification of Cracks
1(a)
Observations:
- Concrete crused and the reinforcement is exposed.
- Concrete spalled beyond the reiforcement which may be a sign of rupture.
- Beam top portion looks safe because of the flange advantage from slab.
- The crack develops from bottom top means rebar yielding occurs in support bottom only.
Answer:
- Its form of flexural failure due to reversal of stress during earthquake.
- During stress reversal, Support top experiences Compression and Bottom experiences tension.
- Top compression is managed by slab advantage. Bottom tension was nt satisfied by the provided reinforcement.
- Since the reiforcement got yielded, it can nt be repaired.
1(b)
Observations:
- Cracks along Beam-Column edge.
- Cracks seem to have developed throungh the structure as it looks much wider.
- Beam looks seperated from the column at joints.
- Concrete is not severly crushed.
Answer:
- Its Beam pull out failure due to insufficient development length of reinforcement in joints.
- During earthquake, the horizontal movement of strucutre make this condition worse and detached the beam member from column.
- Providing anchorage length between two existing concrete is very difficult. So not repairable.
1(c).
Observations:
- Cracks are exactly at the joint of column beam.
- Crack in beams developed through its entire width.
- Slab also developed more cracks along the beam width direction.
Answer:
- Its a plastic hinge failure.
- The damage occured only in the joint zone first of all.
- Cyclic lateral loading & stress reversal at the joints led to the damage.
- Even the slab participated to its best to handle the tension( Slab is severly cracked means it has undergone tension with its flange condition), But unable to control the damage.
- The joint can be strengthened.
2(a)
Observations:
- Concrete damaged at top a column.
- Concrete damaged all around the column face.
- Beams are safe.
- The location of column looks at edge of the building.
- No walls are built along the column means it is probably at ground floor, for Parking car movement access.
Answer:
- It's a soft story failure, Technically Plastic hinge formation.
- Due to absence of infill walls at the Ground floor, The plastic hinge forms at the Top of ground storey columns during Lateral movement.
- Based on the development of cursh of concrete, it can either be repairable or Non-repairable.
2(b)
Observation:
- Concrete developed complete breakage diagonally.
- Longitudinal reinforcements are intact.
- Shear reinforcement spacing looks wider (Which means probably lesser shear rebar proided)
Answer:
- It's a pure Shear failure.
- Inadequate shear reiforcement comples concrete takes all the shear stresses.
2(c)
Observations:
- Column failed completely.
- Failure at top of column.
- There are two slabs connected to the column,Probably one at mid height of the column.
- The wooden piles might be a post failure support after column failed, providing temporary prop to avoid collapse of the entire structure.
Answer:
- It's a Short Column failure.
- An additional slab or a beam connected to a column in mid-height leds to this effect.
- This leads to failure especially if the connection is unintentional and not accounted in design.
- The failure given in the piture is not at all repairable.